05000275/FIN-2008002-02: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Failure To Demonstrate That The Unit 2 Containment Atmosphere Particulate Radioactivity Monitor Performance Was Being Effectively Controlled Per 10 Cfr 50.65(A)(2)
| title = Failure to Demonstrate That the Unit 2 Containment Atmosphere Particulate Radioactivity Monitor Performance Was Being Effectively Controlled PER 10 CFR 50.65(A)(2)


| docket = 05000275, 05000323
| docket = 05000275, 05000323

Revision as of 19:34, 20 February 2018

02
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2008002 Section 1R12
Date counted Mar 31, 2008 (2008Q1)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.12
Inspectors (proximate) M Brown
M Peck
B Henderson
C Graves
L Ellershaw
A Sanchez
J Melfi
J Nadel
V Gaddy
J Groom
CCA H.8, Procedure Adherence
INPO aspect WP.4
'