ML18012A266: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12 , 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant , | {{#Wiki_filter:Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12, 2018 10 CFR 50.4 1O CFR 50, Appendix E, Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f) | ||
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391 | |||
==Subject:== | ==Subject:== | ||
Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50 , Appendix E , Section V , 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes: EPIP | Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V , 10 CFR 50.54(q)(5) , and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes: | ||
Respectfully , en Paul Simmons Site | EPIP Revision Effective Date 12 0042 Emergency Equipment and Supplies 12/19/2017 The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan . The revision includes adding signature and review blocks to allow for documentation of individual page inventory completion . | ||
-Region II NRC Senior Resident Inspector | There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232. | ||
-Watts Bar Nuclear Plant NRC Project Manager -Watts Bar Nuclear Plant}} | Respectfully, en Paul Simmons Site Vice President Watts Bar Nuclear Plant | ||
U.S. Regulatory Commission January 12, 2018 Page2 cc: | |||
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant}} | |||
Revision as of 05:01, 22 October 2019
| ML18012A266 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 01/12/2018 |
| From: | Simmons P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EPIP 12, Rev. 42 | |
| Download: ML18012A266 (2) | |
Text
Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 January 12, 2018 10 CFR 50.4 1O CFR 50, Appendix E,Section V 10 CFR 50.54(q)(5) 10 CFR 72.4 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington , D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391
Subject:
Emergency Plan Implementing Procedure Revision In accordance with the requirements of 10 CFR Part 50, Appendix E, Section V , 10 CFR 50.54(q)(5) , and 10 CFR 72.44(f), the following Emergency Plan Implementing Procedure (EPIP) has been revised with administrative and editorial changes:
EPIP Revision Effective Date 12 0042 Emergency Equipment and Supplies 12/19/2017 The above referenced revision continues to comply with regulations and there is no reduction in effectiveness of the plan . The revision includes adding signature and review blocks to allow for documentation of individual page inventory completion .
There are no regulatory commitments in this letter. Please direct all questions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.
Respectfully, en Paul Simmons Site Vice President Watts Bar Nuclear Plant
U.S. Regulatory Commission January 12, 2018 Page2 cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant