Line 13: Line 13:
| document type = Letter type:TMI
| document type = Letter type:TMI
| page count = 3
| page count = 3
| project =
| stage = Response to RAI
}}
}}


Line 28: Line 30:
Request for Additional Information Regarding PhYSical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan E;xelon Generation Company, LLC (Exelon) submitted the updated Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan involving Three Mile Island, Unit 1, via the Reference 1 letter. In the Reference 2 correspondence, the NRC requested additional information.
Request for Additional Information Regarding PhYSical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan E;xelon Generation Company, LLC (Exelon) submitted the updated Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan involving Three Mile Island, Unit 1, via the Reference 1 letter. In the Reference 2 correspondence, the NRC requested additional information.
In Reference 3, the NRC provided clarifying information regarding the request for additional information.
In Reference 3, the NRC provided clarifying information regarding the request for additional information.
Attached is the Exelon response to the Reference 2 questions as clarified by Reference  
Attached is the Exelon response to the Reference 2 questions as clarified by Reference
: 3. This letter contains no regulatory commitments.
: 3. This letter contains no regulatory commitments.
If you have any questions regarding this response, please contact Mike Fitzwater, Regulatory Assurance, at 717-948-8228.
If you have any questions regarding this response, please contact Mike Fitzwater, Regulatory Assurance, at 717-948-8228.

Revision as of 04:06, 29 April 2019

Response to NRC Request for Additional Information (RAI) Concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan
ML12325A066
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/15/2012
From: Libra R W
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TMI-12-142
Download: ML12325A066 (3)


Text

SAFEGUARDS INFORMATION 1 ) uJ1 Exelon Generation 10CFR50.54(p)

November 15, 2012 TMI-12-142 . U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1) RENEWED FACILITY OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289 Response to NRC Request for Additional Information (RAI) concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan

References:

Dear Sir:

1) Exelon 1 TMI-1 Letter to NRC dated 7/13/12: Revision of Three Mile Island Physical Security Plan 2) NRC Letter to Exelon 1 TMI-1 (P. Bamford to M. Pacilio) dated 8/27/12: Request for Additional Information Regarding Security Plan Review 3) NRC Letter to Exelon 1 TMI-1 (J. Wiebe to M. Pacilio) dated 10105112:

Request for Additional Information Regarding PhYSical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan E;xelon Generation Company, LLC (Exelon) submitted the updated Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan involving Three Mile Island, Unit 1, via the Reference 1 letter. In the Reference 2 correspondence, the NRC requested additional information.

In Reference 3, the NRC provided clarifying information regarding the request for additional information.

Attached is the Exelon response to the Reference 2 questions as clarified by Reference

3. This letter contains no regulatory commitments.

If you have any questions regarding this response, please contact Mike Fitzwater, Regulatory Assurance, at 717-948-8228.

Sincerely, 11. \.. Libra Site Vice President, Three Mile Island Unit 1 Exelon Generation Company, LLC RWUmdf THE ATTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION TMI-12-142

Attachment:

Response to NRC Request for Additional Information (RAI) concerning TMI-1 Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (Safeguards Information) cc: Senior Resident Inspector, USNRC, TMINS (w/o attachment) R. R. Janati, Commonwealth of Pennsylvania (w/o attachment)

Wm. Dean, Region 1 Administrator, USNRC (w/o attachment)

THE ATTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED SAFEGUARDS INFORMATION All bee's are without the attachment bcc: Manager -site Security -TMINPS Site Vice President

-TMINPS Plant Manager -TMINPS Director Operations

-TMINPS Shift Ops Superintendent

-TMINPS Operations Support Manager -TMINPS Director, Site Training -TMINPS Manager, TMINPS Operations Training Manager, Regulatory Assurance

-TMINPS Sr. Regulatory Assurance Engineer -TMINPS Manager, Licensing

-Kennett Square Manager, TMINPS Nuclear Oversight Sr Director Nuclear Security -Cantera Security Ops Superintendent

-Kennett Square Records Management

-TMINPS THE ATTACHMENT CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED