ML070310146: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 5: | Line 5: | ||
| author name = Nerses V | | author name = Nerses V | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 | | author affiliation = NRC/NRR/ADRO/DORL/LPLI-2 | ||
| addressee name = Christian D | | addressee name = Christian D | ||
| addressee affiliation = Dominion Nuclear Connecticut, Inc | | addressee affiliation = Dominion Nuclear Connecticut, Inc | ||
| docket = 05000336 | | docket = 05000336 | ||
Revision as of 06:02, 13 July 2019
| ML070310146 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/30/2007 |
| From: | Nerses V NRC/NRR/ADRO/DORL/LPLI-2 |
| To: | Christian D Dominion Nuclear Connecticut |
| nerses V, NRR//DORL, 415-1484 | |
| Shared Package | |
| ML062920332 | List: |
| References | |
| TAC MD0527 | |
| Download: ML070310146 (1) | |
Text
REACTOR COOLANT SYSTEM PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.4 The pressurizer shall be OPERABLE with: a. Pressurizer water level < 70%, and b. At least two groups of pressurizer heaters each having a capacity of at least 130 kW.APPLICABILITY:
MODES 1, 2 and 3.ACTION: a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the reactor trip breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE REQUIREMENTS 4.4.4.1 The pressurizer water level shall be determined to be within its limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.4.4.4.2 Verify at least two groups of pressurizer heaters each have a capacity of at least 130 kW at least once per 92 days: MILLSTONE
-UNIT 2 3/4 4-4 Amendment No. 66, 74, W., 4-30, 24--, 2-64-, 296