ENS 53840: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
On December 2, 2018 at 0028 Eastern Standard Time (EST), the Train A CVI actuated due to an invalid High Radiation signal from 1-RM-90-130, Containment Purge Exhaust Radiation Monitor. In addition to the Train A CVI, instrument malfunction alarms were received for 1-RM-90-106, Lower Containment Radiation Monitor and 1-RM-90-112, Upper Containment Radiation Monitor as the associated valves isolated for the CVI. A common instrument malfunction alarm was also received for 1-RM-90-130 and 1-RM-90-131, Containment Purge Exhaust Radiation Monitors. Prior to and following the invalid High Radiation alarm, all radiation monitors except 1-RM-90-130 were stable at their normal values. All required automatic actuations occurred as designed. Upon investigation, the cause of the invalid High Radiation alarm was due to a failed ratemeter for 1-RM-90-130.
On December 2, 2018 at 0028 Eastern Standard Time (EST), the Train A CVI actuated due to an invalid High Radiation signal from 1-RM-90-130, Containment Purge Exhaust Radiation Monitor. In addition to the Train A CVI, instrument malfunction alarms were received for 1-RM-90-106, Lower Containment Radiation Monitor and 1-RM-90-112, Upper Containment Radiation Monitor as the associated valves isolated for the CVI. A common instrument malfunction alarm was also received for 1-RM-90-130 and 1-RM-90-131, Containment Purge Exhaust Radiation Monitors. Prior to and following the invalid High Radiation alarm, all radiation monitors except 1-RM-90-130 were stable at their normal values. All required automatic actuations occurred as designed. Upon investigation, the cause of the invalid High Radiation alarm was due to a failed ratemeter for 1-RM-90-130.
Control room operators performed appropriate checks and confirmed that the subject indication was an invalid high radiation signal. The ratemeter for 1-RM-90-130 was replaced and the monitor returned to service.  At the time of the event, plant conditions for a High Radiation alarm did not exist; therefore, the CVI was invalid.
Control room operators performed appropriate checks and confirmed that the subject indication was an invalid high radiation signal. The ratemeter for 1-RM-90-130 was replaced and the monitor returned to service.  At the time of the event, plant conditions for a High Radiation alarm did not exist; therefore, the CVI was invalid.
The NRC Resident Inspector was notified."
The NRC Resident Inspector was notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190123en.html#en53840
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190123en.html#en53840
}}{{unit info
}}{{unit info

Latest revision as of 08:30, 1 January 2020

ENS 53840 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1228.22 h51.176 days <br />7.311 weeks <br />1.682 months <br />)
Opened: David Allen
09:41 Jan 22, 2019
NRC Officer: Ossy Font
Last Updated: Jan 22, 2019
53840 - NRC Website
Loading map...