| title = Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201 | | title = Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201 | ||
| author name = | | author name = Slade G | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| addressee name = | | addressee name = | ||
| Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000255/1993028]] | ||
=Text= | =Text= | ||
Revision as of 19:12, 17 June 2019
| ML18058B917 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/06/1993 |
| From: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9307140226 | |
| Download: ML18058B917 (1) | |
See also: IR 05000255/1993028
Text
consumers
Power POWERING MICHIGAN'S.
PROGRESS . Palisades
Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 : * July 6, 1993 Nuclear Regulatory
Commission
Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET
-LICENSE
-
PLANT -REPLY TO NOTICE OF VIOLATION;
NRC INSPECTION
REPORT No ..92-028 -EXTENSION
OF COMPLETION
DATE NRC Inspection
Report No. 92028, dated january 21, 1993, _forwarded
the results of the NRC inspection
conducted
from December 7 through 18, 1992 in the area of irtservice
testing. The inspection
report identified
an apparent violation
of NRC requirements
pertaining
to inadequate
acceptance
criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure
Injection (lPSI) check valves were exercised
to their full open position.
Our reply to the
of Vio.lation
was dated February 22, 1993. Corrective
action 4, in the reply to the Notice of Violation
to avoid
non-compliance, was a verification
that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring
full flow testing are -included
in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures
that take.credit
for full flow testing state the correct flow rates as acceptance
criteria.
These actions were proposed to be completed
by July 15, 1993 which was the forecast end of the refueling
outage. . . . Because of the other work activities
have
higher priority, we are extending
the forecast cdmpletion
date of corrective
action 4 in our reply to the Notice of Violation
from July 15, 1993 until December 1, 1993. Specific
actions for verification
that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion
during the ongoing 1993 refueling
outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades
9307140226