Regulatory Guide 8.19: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML13350A224
| number = ML003739550
| issue date = 05/31/1978
| issue date = 06/30/1979
| title = Occupational Radiation Dose Assessment in Light-Water Reactor Power Plants Design Stage Man-Rem Estimates
| title = Rev 1 Occupational Radiation Dose Assessment in Light-Water Reactor Power Plants Design Stage Man-Rem Estimates
| author name =  
| author name =  
| author affiliation = NRC/OSD
| author affiliation = NRC/RES
| addressee name =  
| addressee name =  
| addressee affiliation =  
| addressee affiliation =  
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = RG-8.019
| document report number = RG-8.19 Rev 1
| document type = Regulatory Guide
| document type = Regulatory Guide
| page count = 6
| page count = 12
}}
}}
{{#Wiki_filter:U.S. NUCLEAR REGULATORY  
{{#Wiki_filter:U.S. NUCLEAR REGULATORY  
COMMISSION  
COMMISSION
May 1978 REGU LATORY GUIDE OFFICE OF STANDARDS.DEVELOPMENT
Revision 1 June 1979 REGULATORY
GUIDE OFFICE OF STANDARDS  
DEVELOPMENT  
REGULATORY  
REGULATORY  
GUIDE 8.19 OCCUPATIONALRADIATION
GUIDE 8.19 OCCUPATIONAL
DOSE-ASSESSMENT
RADIATION
DOSE ASSESSMENT  
IN LIGHT-WATER  
IN LIGHT-WATER  
REACTOR POWER PLANTS DESIGN STAGE MAN-REM ESTIMATES  
REACTOR POWER PLANTS DESIGN STAGE MAN-REM ESTIMATES  


==A. INTRODUCTION==
==A. INTRODUCTION==
Section 50.34. "Contents of , nplications.
Section 50.34, "Contents of Applications;
Technical Information," of 10 CFR Part 50, "Licensing of Production and Utilization Facil ities," requires that each applicant for a permit to construct a nuclear power reactor provide a preliminary safety analysis report (PSAR) and that each applicant for a license to operate such a facility provide a final safety analysis report (FSAR). Section 50.34 specifies in general terms the information to be supplied in these reports.


Techni-cal.lnformation," of 10 CFR Par, 50, "Licensing of Production and Utilization Facilitk.
A more detailed description of the information needed by the NRC staff in its evaluation of applications is given in Regulatory Guide 1.70, Revision 3, "Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants." Section 12.4, "Dose Assessment," of Regulatory Guide 1.70, Revision 3, states that the safety analysis report should provide the estimated annual radiation exposure to person* nel at the proposed plant during normal opera tions. The man-rem estimate requirement is an important part of the overall, ongoing radiation protection design review. The purpose of this requirement is to provide that adequate detailed attention is given during the prelimi nary design stage (as described in the PSAR), as well as during construction after completion of design (as described in the FSAR), to dose causing activities to ensure that personnel exposures will be as low as reasonably achiev able (ALARA). The safety analysis report pro vides an opportunity for the applicant to demonstrate the adequacy of that attention and to describe whatever design' and procedural chahges have resulted from the dose assess ment process.


." requires that each applicant for a permit to. con.,truct a nuclear powcr reactor provide a preliminary safety analysis report (PSAR) and that each applicant for a license to opcraic such a facility provide a final safety analysis report (FSAR). Section 50.34 specifies in general terms the inforniation to be supplied in these reports.A more detailed description, of the information needed by the NRC staff. in its evaluation of applica-tions is given in Regulatory Guide 1.70, "Standard Format and Content of Safety Analysis Reports for.Nuclear Power Plants." Section 12.4. -Dose -As-sessment." of Regulatory Guide 1.70 states that the safety analysis report should provide the estimated W annual radiation exposure to personnel at the pro?"." posed plant during normal operations.
The objective of this guide is to describe a method acceptable to the NRC staff for per Lines indicate substantive changes from previous issue.forming an assessment of collective occupational radiation dose as part of the ongoing design review process involved in designing a light water-cooled power reactor (LWR) so that occupational radiation exposures will be ALARA.
 
The purpdse' of the man-rem estimate requirement is to ensuriý..that adequate detailed attention is given during the pr.0,, liminary design stage (as described in thii well as during construction after compltbn of design (as described in the FSAR). to dose-causi fafcti vities to ensure that personnel exposures will be as low as reasonably achievable (Al:ARA).
The safety analysis report provides an opoiud ityjor the applicant to demonstrate the adequacy-,b thai'attention and to de-* scribe whatever,ý.esigaandý'rocdural changes have resulted from tlikidose assessment process.* The objective
6(itthguide is to describe a method* acccptabldi.to the NRC stuff for performing an ;is-sessment of 'ollective occupational radiation dose as* *part of the process of designing a light-water-cooled power reactor (LWR).


==B. DISCUSSION==
==B. DISCUSSION==
The dose assessment process requires a good work-ing knowledge.of (i) the principal factors contribut- ing tooccupational radiation exposures that oCcur ;t a nuclear reactor power plant and (2) method-s and techniques for ensuring that the occupational radia-tion exposure will be ALARA. In assessing the Col-lective occupational dose at a.pla'ntv.the applicant evaluates each potentially significant  
The dose assessment process requires a good working knowledge of (1) the principal factors contributing to occupational radiation expo sures that occur at a nuclear reactor power plant and (2) methods and techniques for ensuring that the occupational radiation expo sure will be ALARA. In assessing the collective occupational dose at a plant, the applicant evaluates each poten tially significant dose-causing activity at that plant (i.e., activities that result in greater than one man-rem per year). The applicant specifically examines such things as design, shielding, plant layout, traffic patterns, expected maintenance," and radioactivity sources. This evaluation process is aimed at the consideration of eliminating unnecessary exposures, minimizing foreseen required doses (individual and collective), and examining the cost-effectiveness of each dose-reducing meth od and technique.
'do.;e-causing activity at that plant. specifically examining such things as design. shieldingp..Iant layout. traffic pat-terns, expected mainiLnancie arind radioactivity sources, with a vievtu: reducing unnecessary expo-sures and considering':the co ti-effecliveness of each dose-reducing method and techniquc.


This evaluation process aiid-the dose:.'reductions that nmav he expected to resttI: nre ýtheK' principal objectives of the dose ,, :,The pnpal benefits arising frotm this evaluation process Lccur. during the period of prelimlinary de-sign since many of the ALARA practices are part of the design process. On the other hand. additional benefits can also accrue during advanced design stages and even during early construction s tages. as better evaluation of dose-causing oporaiions are available and further design refinements can be iden-tified. In addition, operations that will need special planning and careful dose control can be identified at the preoperational stage when the applicant can take advantage of all design options for reducing dose.C. REGULATORY
This evaluation process and the dose reductions that may be expected to result are the principal objectives of the dose assessment.
POSITION'This guide describes the format and content for assessments of the total annual occupational (man-ren)
dose at an LWR-principally during the design stage. The dose assessment at this stage should include estimated annual personnel exposures during normal operation and dining anticipated opera-tional occurrences.


It should include estimates of the frequency of occurrence, the existing or resulting USNYRC REGULATORY
The dose assessments prepared in accordance with this guide are intended for use as an aid in what should be a continuing search for dose-reducing techniques and not for NRC regulatory enforcement purposes.
GUIDES Commnwta bh~uftil be swnt to It'. Stitievhsy of the Comnfnjvtsn.US
Nu'ti-A. Areq, Fligullator Guefnw et lisued to deeehba ahu~natke
&aiia&te to me pubic mqethods taint Comm~ts.t~n.


Wath,,nqtun OZ. 20651j. Att..ntion Outbhethi;
The principal benefits arising from this eva luation process occur during the period of pre liminary design since many of the ALARA prac tices are part of the design process. On the USNRC REGULATORY
..... 5in...aameotabl.
GUIDES Commento ahud be aunt to di Secrawy of Oe Coma.nion, U.S. Nucer Regubtory Cn-ntmmio.n, Waihington, D.C. 2 , Attention:
Dockeft0 ars Regbtor, Guideq am issued ID decrb rok-, rmilebe to fte pubk Service Branch. maldiod captsibleo ftO NRC Wl of , -pn, wt of thne Cormn iaona to d" %leeclmiqu umd by fe stiff in eawu- The guides are Wled In fte flowng ton broad dhtalon: L F A", pro ns or POstulAtd cdn. or to provide guidanco to Gukdn we ro subetkutes for regubmora, ad eorn-


to th*.NAC sMoll al .nnplamefiting specifi~c owls of the. Commtuoon's ofoied.igguitotiotti.1dodlineate tectinsquet ted by She %fall i nevaluoloqg tftiloc tsobiems The quitti ne.0-wsu"Io the tnilslwni t-, fw,..el 0tn-w,, or: poinulated accidents.
===1. POVW Reaictors ===
6. Products P1Kmce wflh dn is not requed. Methode and aolutlons iffaMrnt from tioee 2. Reewch and Teat Rmctor 7. Treplortation ea out I dn quldee wl be acceptable ff they provide a beal for fte idge 3. Fu and MeRaNW ins Fact & Occupationel Inhld raque to dihenue m or condinumce of a peri or kern by dte 4. EnroM nenw and Sttig 9. Antitrust and Financial Review Conunlelon
5. MPa lIs and Plant Protectioi
10. General R qued a for age of inued gude (which nay be rprodu or for Convrdtnw and sn gest.or, forl- ipr ntes , in dine , guides are enouragd at pcmnt WChnintont D.C. tat r c of future guides sl times and guidee will be rewbee, n approprite to accomodat Iomet inapcfic I =iln a=uW be aein wrtn oteU.S. Nuclear Regulatory and to ~refetnw ioonormato or emperlec.Tegie rvade ei Comnimaon, Waatibigton, D.C. 2050, Attenrtion:  
Dkactor, Division of of VAubeiv covnueta reoivdfo i ui ndaiinlae eiw Tedwilal infrm~rration and Document Control.


at to PtoneS. ouicdance t0 moiticents.
other hand, additional benefits can also accrue during advanced design stages and even dur ing early construction stages, as better evalu ation of dose-causing operations are available and further design refinements can be identi fied. In addition, operations that will need special planning and careful dose control can be identified at the preoperational stage when the applicant can take advantage of all design options for reducing the occupational dose.  C. REGULATORY
POSITION This guide describes the format and content for assessments of the total annual occupational (man-rein)
dose at an LWR--principally during the design stage. The dose assessment at this stage should include estimated annual personnel exposures during normal operation and during anticipated operational occur rences. It should include estimates of the fre quency of occurrence, ,the existing or resulting radiation levels, the manpower requirements, and the duration of such activities.


Rtegulatory Guirks are not gsastnuten kw regulationst.
These esti mates can be based on operating experience at similar plants. However, to the extent possible, estimates should include consideration of the design of the proposed plant, including radiation field intensities calculated on the basis of the plant-specific shielding design, taking into account the effect of any dose reducing design changes.


andS copitpance vvitf them it not rotsuired.
The dose assessment process and the con comitant dose reduction analysis should involve individuals trained in plant system design, shield design, plant operation, and health physics. Knowledge from all these disciplines should be applied to the dose assessment and to the entire radiation protection design review in determining cost-effective dose reductions.


1.pow" fli ' &JPNfwcf.Mfithods aenc volutiott1 diffleten from thotse lt out in the VuKde¶ "nit be etcl1i 2. Research omtiTest Reatolw 7. tfin'itu awle it they provide a bouitfor the findig traquisiteto the iknce or conttinuance.
Plant experience provides useful information on the numbers of people needed for jobs, the duration of different jobs, and the frequency of the jobs as well as on actual occupational radiation exposure experience.


3. Fuelsand MairriAls Fdcatie 9. occu",iifmrufttefaltil of* & offitt of tkiceMe by the Cammts,.nn.. .Etn~nd ~l ~a Aflitmut At.oms Comment s and iueUl antoi for improvements in thewe quidles we eescousepd!
The applicant should use personnel exposure data for specific kinds of work and job functions available from similar operating LWRs.* Useful reports on these data have been published by the Atomic Industrial Forum, Inc. and the Electric Power Research Institute, and a summary report on occupational radiation exposures at nuclear power plants is distributed annually by the Nuclear Regulatory Commission.
at 0eeal n ~n tt'to, 5 eea timeW1. ared Qus~t e.~t be revised, as uopoatovito.


to aco.rmmodate cornmertis and Aestuests Irv singte caione ol tivuem itpen lwh4,ch may to. me.'mslu.uJI
The occupational dose assessment should include projected doses during normal opera tions, anticipated operational occurrences, and shutdowns and should be based on anticipated radiation conditions after at least 5 years of plant operation.
to. Ito ut..r to #effect nowa inliomatirnn cit e.miernrce.


Howevrr. common%%antt Ithi i quidt~it men rt on autctflonwlc dirlmithitstro-  
Some of the exposure-causing activities that should be considered in this *See Regulatory Guide 1.16, "Reporting of Operating Infor mation--Appendix A Technical Specifications," for exapleo Of work and job functin.dose assessment include steam generator tube plugging and maintenance, repairs, inservice inspection, and replacement of pumps, valves, and gaskets. Doses from nonroutine activities that are anticipated operational occurrences should be included in the applicant's ALARA dose analysis.
1- ttot n%-91P..nnes oil iw,ottr qnet .sfo. ti raceid v.fttin~ about two rrinoftlt after its iuMSce, tvill be pt~itcultidv useful inl iftnu~nns dsicukl be nudfe in oakn w fqit. the US. Nurf"~ 6feqr.tutauts Ctsnc -nnn.esetustin,1 the neted lot an eary reCvisici, Whehnhsfltm, 0,C. M05$t. Attentiosi Doecois. 0-%o.nn it I Dii-otrent Custuro radiation levels. the manpower requiremients.


and the duration of such activities.
Radiation sources and personnel activities that contribute significantly to occu pational radiation exposures should be clearly identified and analyzed with respect to similar exposures that have occurred under similar conditions at other operating facilities.


These estimates can be based on operating experience at similar plants, al-though to the extent possible estimates should include consideration of the design of the proposed plant, in-cluding radiation field intensities calculated on the basis of the plant-specific shielding design.The dose assessment process and the concomitant dose reduction analysis should involve individuals trained in plant system design. shield design, plant operation.
In this manner, corrective measures can be incorpora ted in the design at an early stage.  Tables 1 through 8 are examples of work sheets for tabulation of data in the dose assessment process to indicate the factors con sidered. The actual numbers used in the tabu lations will depend on plant-specific information developed in the course of the dose assessment review.  An objective of the dose assessment process should be to develop 1. A completed summary table of occupa tional radiation exposure estimates (such as Table 1), 2. Sufficient illustrative detail (such as that shown in Tables 2 through 8) to explain how the radiation exposure assessment process was performed, 3. A systematic process for considering and evaluating possible dose-reducing design changes and associated operating proce dure changes as part of the comprehen sive ongoing design review, and 4. A record of the rievidw procedures, documentation requirements, and identi fication of principal ALARA-related changes resulting from the dose assess ment. This record should be included in the assessment as a demonstration of the steps taken to ensure exposures will be ALARA.  During the final design stage, dose assess ment should be updated to take into account any major design changes. In particular, com pleted shielding design and layout of equipment should permit better estimates of radiation field intensities in locations where work will be per formed.  Analysis of the elements of the man-rem esti mate (e.g., radiation levels, task duration, and frequency), treated qualitatively, can be of significant value in making engineering judgments regarding design changes for ALARA purposes.


and health physics, respectively.
As a result of the dose assessment process described herein, it is to be expected that various dose-reducing design changes and innovations will be incorporated into the design.8.19-2 The precision of the man-rem estimate is of secondary importance.


Knowl-edge from all these disciplines should be applied to the dose assessment in determining cost-effective dose reductions.
That estimate's relation ship to actual man-rem doses received during subsequent plant operation will depend pri marily on operating experience and maintenance and repair problems encountered rather than on design projections, however precise.


Plant experience provides useful information on the numbers of people needed for jobs, the duration of different jobs. and the frequency of the jobs. as well as on actual occupational radiation exposure ex-perience.
Entries in the tables should be identified and their basis explained in the text of the report, e.g., available data from similar plants, expected (reduced)
values due to design, and engineering improvements.


The applicant should utilize personnel ex-posure data for specific kinds of work and job func-tions available from similar operating LWRs. (See Regulatory Guide 1.16. "Reporting of Operating Information-Appendix A Technical Specifica.
Such information will readily identify those areas in which ALARA efforts are to be made or have been made. Additionally, it would be of value to indicate whether the reduced values in appli cable cases were derived on the basis of physical (or other) models. This would alert individuals concerned with the analysis of the occupational radiation dose assessment report in determining whether the well-intended im provements are productive or counterproduc tive.


tions." for examples of work and job functions.)
==D. IMPLEMENTATION==
Useful reports on these data have been published by the Atomic Industrial Forum. Inc., and the Electric Power Research Institute.
The purpose of this section is to provide in formation to applicants regarding the NRC staff's plans for using this regulatory guide.  This guide reflects current NRC staff prac tice. Therefore, except in those cases in which the applicant proposes an acceptable alterna tive method for complying with specified por tions of the Commission's regulations, the method described herein is being and will con tinue to be used in the evaluation of submittals in connection with applications for construction permits or operating licenses until this guide is revised as a result of suggestions from the public or additional staff review. For construc tion permits, the review will focus principally on design considerations;
for operating licenses, the review will focus principally on administrative and procedural considerations.


and a summary report on occupational radiation exposures at nuclear power plants is distributed annually by the Nuclear Regulatory Commission.
8.19-3 TABLE 1 TOTAL OCCUPATIONAL
 
RADIATION
The occupational dose assessment should include projected doses (luring normal operations.
EXPOSURE ESTIMATES
 
Dose Activity (man-reins/year)
anticipated operational occurrences, and shutdowns.
Reactor operations and surveillance (see Tables 2 & 3) Routine maintenance (see Table 4) Waste processing (see Table 5) Refueling (see Table 6) Inservice inspection (see Table 7) Special maintenance (see Table 8) Total man-reins/year Occupational exposures from Tables 2 through 8 are entered in Table 1 and added to obtain the facility's estimated total yearly occupational dose.8.19-4 TABLE 2 OCCUPATIONAL
 
DOSE ESTIMATES
Some of the exposure-causing activities that should be considered in this dose assessment include steam generator tube plugging and maintenance, repairs, inservice inspec-tion. and replacement of pumps, valves, and gaskets, Doses from nonroutine activities that are anticipated operational occurrences should be included in the ap-plicant's ALARA dose analysis.
DURING ROUTINE OPERATIONS
 
AND SURVEILLANCE
Radiation sources and personnel activities that contribute significantly to occupational radiation exposures should be clearly identified and analyzed with respect to similar expo-sures that have occurred under similar conditions at other operating facilities.
Activity Walking in radiation zones Checking systems and equipment:  
 
Containment cooling system Boron acid (BA) makeup system Fuel pool system Control rod drive (CRD) system Other systems (specify):
In this manner, corrective measures can be incorporated in the design at an early stage.Tables I through 8 are examples of worksheets for tabulation of data in the dose assessment process to indicate the factors considered.
! 1 Pumps: CRD Residual heat removal Accumulators Pressurizer valves Other equipment (specify):
 
.Total Average dose rate (mrem/hr)Exposure Number of time per workers event (hr) Utility Contractor Number of events per year Dose (man-rems/year)
The actual numbers appearing in the dose columns will depend on plant-specific information developed in the course of the dose assessment review.An objective of the dose assessment process should be to develop: (I) A completed summary table of occupational radiation exposure estimates (such as Table I).(2) Sufficient illustrative detail (such as that shown in Tables 2 through 8) to explain how the radiation exposure assessment process was performed, and (3) A description of any design changes that were made as a result of the dose assessment process.During the final design stage. (lose assessment can be substantially refined, since at this time details of the design will be known. In particular.
Utility Contractor
-+ -*The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant.


completed shielding design and layout of equipment should permit better estimates of radiation field intensities in locations where work will be performed.
TABLE 3 OCCUPATIONAL  
 
As a result of the dose assessment process, it is to be expected that various dose-reducing design changes and innovations will be incorporated into the design.
 
==D. IMPLEMENTATION==
The purpose of this section is to provide informa-tion to applicants regarding the NRC staff's plans for using this regulatory guide.This guide reflects current NRC staff practice.Therefore, except in those cases in which the appli-cant proposes an acceptable altcrnatlve method for complying with specified portions of the Commis-sion's regulations, the method described herein is being and will continue ito be used in the evaluation of submittals in connection with applications for con-struction permits or operating licenses until this guide is revised as a result of suggestions from the public or additional staff review. For construction permit. the review will focus principally on design consid-erations;
for operating license, the review will focus principally on administrative and procedural consid-erations.TABLE 1 TOTAL OCCUPATIONAL
RADIATION EXPOSURE ESTIMATES Dose Activity (nian-reinslyear)
Reactor operations and surveillance (see Tables 2 & 3) *Routine maintenance (see Table 4)Waste processing (see Table 5)Refueling (see Table 6)Inservice inspection (see Table 7) -Special maintenance (see Table 8) -Total man-reins/year
*Occupational exposures from Tables 2 through 8 arc entered in Table I and added to obtain the racility's estimated total yearly occupational dose.Values shown in Tables 2 through 8 arc typical examples (for BWRs and PWRs) for illustrative purposes only. Actual values can vary. depending on the facility type (BWR or PWR). de-sign. and size.4 8.19-2 TABLE 2 OCCUPATIONAL  
DOSE ESTIMATES  
DOSE ESTIMATES  
DURING ROUTINE A verage Exposure dose rate time Activily Imremn/hir) (hr)OPERATIONS
AND SURVEILLANCE*
Number of Walking Checking: Containment cooling system Accumulators Pressurizer valves Boron acid (BA) makeup system Fuel pool system Control rod drive (CRD) system: Modules Controls Filters 0.2 1 1.5 10 5 i 0.5 1 0.2 0.2 0.25 1 0.5 0.5 0.2 0.2 workers 2 Frequetwy I/shift I/day I/day I/day 1/day I/day 1/day Ilshift I/day f)tse (man-rerns/v ear)0.22 0.36 0.54 0.73 0.36 0.09 0.36 0.27 0.09 Pumps: CRD Residual heat removal 1 0.5 0.5 0.5 1!°I/day I/day 0.04 0.07 Total*'Te data shown are for illustrative purposcs only and would be expected to vary significantly from plant ,; plan
====t. OCCUPATIONAL ====
DOSE Activity Operation of equipment:
Traversing in-core probe system Safety injection system Feedwater pumps &turbine Instrument calibration Collection of radioactive samples: Liquid system Gas system Solid system Radiochemistry Radwaste operation Health physics TABLE 3 ESTIMATES
DURING NONROUTINE  
DURING NONROUTINE  
OPERATION  
OPERATION  
AND A verage Exposure Number dose rate time of (mrem/lr) (hr) workers Frequency 2 5 1 2 2 0.5 0.5 0.5 1 8 2 2 2 3 2 3/year I/month I/week I/day I/day I/month 4/year I/day I/week I/day SURVEILLANCE*
AND SURVEILLANCE
Dose (man-rems/yvear)
Activity Operation of systems equipment:
0.02 0.06 0.05 0.73 1.83 0.03'0.02 0.73 3.75 1.46 10 5 I0 10 3 1 Total*The data shown arc for illustrative purposes only and would be expected to vary significantly from plant to plant.8.19-3 TABLE 4 OCCUPATIONAL  
Safety injection system Feedwater pumps & turbine Instrument calibration Other (specify):
Collection of radioactive samples: Liquid Gas Solid Radiochemistry Radwaste operation Health physics Other (specify):
Total Average dose rate (mrem/hr)Exposure Number of Number of time per workers events event (hr) Utility Contractor per year Dose (man-rems/year)  
Utility Contractor
-+ =The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant.00 cO !
TABLE 4 OCCUPATIONAL  
DOSE ESTIMATES  
DOSE ESTIMATES  
DURING A verage !ýxposure dose rate time Aciivity ( mren/Iir) ( hr)ROUTINE MAINTENANCE*
DURING ROUTINE MAINTENANCE
Number of workers Dose Freeiuenc)v (mnimz-reinlfl/eur)
Average dose rate (mrem/hr)Activity Changing filters: Waste filter Laundry filter Boron acid filter Pressure valves BA makeup pump o* BA holding pump Instrumentation and controls:  
0 Mechanical:
Transmitter inside containment Transmitter outside containment Radwaste processing system Other (specify):  
Changing filters: Waste filter Laundry filter Boron acid filter Pressure valves 13A makeup pump BA holding pump Instrumentation and controls: Transmitter inside containment Transmitter outside containment Standby gas treatment system Radwaste processing system 100 100 100 10 10 10 5 1 2 10 0.5 0.5 0.5 0.5 0.3 0.3 0.5 2 2 20 6/year 10/year 2/year 1/week iU;-4ck 1/%,e:.k 2/weck I/week 2/year 4/year 0.3 0.5 0.1 0.26 0.16 0.16 0.52 0.1 0.02 1.6 Total*The data shown are for illustrative purposes only and would be expected to vary significantly from plant to plant.TABLE 5 OCCUPATIONAL  
Total*The list of activities is for illustrative Exposure time per event (hr)Number of workers Utility Contractor Number of events per year Dose (man-reins/year)
Utility Contractor
-+ -purposes only, is not all inclusive, and would be expected to vary from plant to plant.
 
TABLE 5 OCCUPATIONAL  
DOSE ESTIMATES  
DOSE ESTIMATES  
DURING WASTE PROCESSING*
DURING WASTE PROCESSING
A verage Exposure Number dose rate time of (mrem/hr) (hr) workers Frequency (man Activity Dose-rems year)Control room Sampling and filter changing Panel operation, inspection, and testing Operation of waste processing and packaging equipment 0.1 10 1 2 3000 4 2 12 2 I/year 1/week I/day I/week 0.3 2.1 0.73 2.5 Total*The data shown are for illustrative purposes only and would be expected to vary significantly from plant to plant.8.19-4 TABLE 6 OCCUPATIONAL  
Activity Control room Sampling and filter changing Panel operation, inspection and testing Operation of waste processing and packaging equipment Other (Specify):
Average dose rate (mrem/hr)Exposure time per event (hr)Number of workers Utility Contractor Number of events per year Dose (man-rems/year)
Utility Contractor
-+ -Total not all inclusive, and would be expected to vary from plant to plant.*The list of activities is for illustrative purposes only, is I OO
TABLE 6 OCCUPATIONAL  
DOSE ESTIMATES  
DOSE ESTIMATES  
DURING REFUELING*
DURING REFUELING  
A verage dose rate (nrentIhr)
Average Exposure Number of Number of Dose , dose rate time per workers events (man-reins/year)  
Exposure time (hr)Number workers Dose Frequenc). (mn-rntrcslvear)
Activity (mrem/hr)  
Activity Reactor pressure vesscl head and intcrnals- removal and installation Fuel preparation Fuel handling Fuel shipping 30 10 2.5 15 60 24 100 15 6 I/year 10.8 2 I/year 0.48 4 L'year 1.0 2 I/year 0.45 Total*The data shown are for illustrative purposes only and would be expected to vary significantly from plant to pla'ni.Most work functions performed during rcfueling.
event (hr) Utility Contractor per yearl Utility Contractor Reactor pressure vessel head and internals- removal and installation  
 
---Fuel preparation  
and the associated occupational dose received, will vary depending on facility design (BWR or PWR), reactor pressure vessel size. and number of fuel assemblics in the reactor core. For a detailed description of prc-planned activities, time. and manpower schedule, refer to the "'critical path for refueling task%.*' which should he available from the Nuclear Steam Supply System tNSSS) supplier.TABLE 7 OCCUPATIONAL  
-----Fuel handling -----Fuel shipping -----Other (specify):
----?D Total ---+ = CD I The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant. Most work functions performed during refueling, and the associated occupational dose received, will vary depending on facility design (BWR or PWR), reactor pressure vessel size, and number of fuel assemblies in the reactor core. For a detailed description of pre-planned activities, time, and manpower schedule, refer to the "critical path for refueling tasks," which should be available from the Nuclear Steam Supply System (NSSS) supplier.I
TABLE 7 OCCUPATIONAL  
DOSE ESTIMATES  
DOSE ESTIMATES  
DURING INSERVICE  
DURING INSERVICE  
INSPECTION'
INSPECTION  
A verage dose rate (in rem Ih r)Activity Providing access: installation of platforms, ladders.etc., removal of thermal insulation Inspection of welds Follow up: installation of thermal insulation platform removal and cleanup Exposure time (hr)30 100 Number of svorkers 4 3 4 Dose'Freqienc-Y (mian -rct:sl/v*arj
Average Exposure Number of Number of Dose dose rate time per workers events (man-reins/year)  
40 40 I/year I/year I/Ycar 4.8 12.0 6.4 40 40 Total*The data shown are for illustrative purposes only and would be expected to vary significantly from plant to plant.Estimates should be based on average yearly values over a 10-year period. Variations are expected as a consequence of reactor size, design, number of welds to be inspected yearly. and the degree of equipment automation available for remote camination of welds.8.19-5 TABLE 8 OCCUPATIONAL  
Activity (mrem/hr)
event (hr) Utility Contractor per year Utility Contractor Providing access: installation of platforms, ladders, etc., removal of thermal insulation Inspection of welds Follow up: installation of thermal insulation, platform removal, and cleanup Total + -= *The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant. 0 Estimates should be based on average yearly values over a 10-year period. Variations are expected as a consequence of reactor size, design, number of welds to be inspected yearly, and the degree of equipment automation available for remote examination of welds.I
TABLE 8 OCCUPATIONAL  
DOSE ESTIMATES  
DOSE ESTIMATES  
DURING SPECIAL A vero.e L'xiiositrc Nunber hiost rale lime of fivioy (lir-in lir) (hr) workers MAINTENANCE  
DURING SPECIAL MAINTENANCE
" Fr*'qseitcY (inuni-renslls/etr)
Activity Servicing of control rod drives Servicing of in-core detectors Replacement of control blades Dechanneling of spent and channeling of new fuel assemblies Steam generator repairs Other (specify):
Servicing of control rod drives Servicing of in-core detectors Replaccment of control blades Dechanneling of spent and channeling of new fuel assemblies Steam generator repairs 50 15 Is 0()1000 12 10 10 60 4 3 2 I/yea r 1/year I/year I/year 1/year 1.1i 0.3 0.3 1.2 24.0 2 6 Total*Thc data shown are for illustrative  
I I-.Average dose rate (mrem/hr)Exposure time per event (hr)Number of workers Utility Contractor Number of events per year Dose (man-rems/year)
;Iurptisc only and would he epected to vary significantly front plant to plant.Nto%t prcplanned (or riwlinet rnt~enanicc ajoivities durink. otitage arc de-,ritcd in the -critical path fo'r refueling task-,".which
Utility Contractor Total-+ -=The list of activities is for illustrative purposes only, is not all inclusive, and from plant to plant.would be expected to vary significantly Most preplanned (or routine) maintenance activities during outage are described in the "critical path for refueling tasks," which should be available from the NSSS supplier, and are performed in parallel with the critical path refueling tasks to shorten reactor outage time.
%hould be availabule fromn the NSSS supplier, and ire performed in parallel with the critical path refueling tasks to %horiten reactor outage time Actual d,.'e %kill depcndl on faeiliity desigzn a% wekll a!, %ize and thermal output and nuniher tit fuel assemblics in the rcicior cote.8.19.6}}
 
UNITED STATES NUCLEAR REGULATORY
COMMISSION
WASHINGTON, 0. C. 20555 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $300 POSTAGE AND FEES PAID U.S. NUCLEAR
COMMISSION}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 02:47, 21 September 2018

Rev 1 Occupational Radiation Dose Assessment in Light-Water Reactor Power Plants Design Stage Man-Rem Estimates
ML003739550
Person / Time
Issue date: 06/30/1979
From:
Office of Nuclear Regulatory Research
To:
References
RG-8.19 Rev 1
Download: ML003739550 (12)


U.S. NUCLEAR REGULATORY

COMMISSION

Revision 1 June 1979 REGULATORY

GUIDE OFFICE OF STANDARDS

DEVELOPMENT

REGULATORY

GUIDE 8.19 OCCUPATIONAL

RADIATION

DOSE ASSESSMENT

IN LIGHT-WATER

REACTOR POWER PLANTS DESIGN STAGE MAN-REM ESTIMATES

A. INTRODUCTION

Section 50.34, "Contents of Applications;

Technical Information," of 10 CFR Part 50, "Licensing of Production and Utilization Facil ities," requires that each applicant for a permit to construct a nuclear power reactor provide a preliminary safety analysis report (PSAR) and that each applicant for a license to operate such a facility provide a final safety analysis report (FSAR). Section 50.34 specifies in general terms the information to be supplied in these reports.

A more detailed description of the information needed by the NRC staff in its evaluation of applications is given in Regulatory Guide 1.70, Revision 3, "Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants." Section 12.4, "Dose Assessment," of Regulatory Guide 1.70, Revision 3, states that the safety analysis report should provide the estimated annual radiation exposure to person* nel at the proposed plant during normal opera tions. The man-rem estimate requirement is an important part of the overall, ongoing radiation protection design review. The purpose of this requirement is to provide that adequate detailed attention is given during the prelimi nary design stage (as described in the PSAR), as well as during construction after completion of design (as described in the FSAR), to dose causing activities to ensure that personnel exposures will be as low as reasonably achiev able (ALARA). The safety analysis report pro vides an opportunity for the applicant to demonstrate the adequacy of that attention and to describe whatever design' and procedural chahges have resulted from the dose assess ment process.

The objective of this guide is to describe a method acceptable to the NRC staff for per Lines indicate substantive changes from previous issue.forming an assessment of collective occupational radiation dose as part of the ongoing design review process involved in designing a light water-cooled power reactor (LWR) so that occupational radiation exposures will be ALARA.

B. DISCUSSION

The dose assessment process requires a good working knowledge of (1) the principal factors contributing to occupational radiation expo sures that occur at a nuclear reactor power plant and (2) methods and techniques for ensuring that the occupational radiation expo sure will be ALARA. In assessing the collective occupational dose at a plant, the applicant evaluates each poten tially significant dose-causing activity at that plant (i.e., activities that result in greater than one man-rem per year). The applicant specifically examines such things as design, shielding, plant layout, traffic patterns, expected maintenance," and radioactivity sources. This evaluation process is aimed at the consideration of eliminating unnecessary exposures, minimizing foreseen required doses (individual and collective), and examining the cost-effectiveness of each dose-reducing meth od and technique.

This evaluation process and the dose reductions that may be expected to result are the principal objectives of the dose assessment.

The dose assessments prepared in accordance with this guide are intended for use as an aid in what should be a continuing search for dose-reducing techniques and not for NRC regulatory enforcement purposes.

The principal benefits arising from this eva luation process occur during the period of pre liminary design since many of the ALARA prac tices are part of the design process. On the USNRC REGULATORY

GUIDES Commento ahud be aunt to di Secrawy of Oe Coma.nion, U.S. Nucer Regubtory Cn-ntmmio.n, Waihington, D.C. 2 , Attention:

Dockeft0 ars Regbtor, Guideq am issued ID decrb rok-, rmilebe to fte pubk Service Branch. maldiod captsibleo ftO NRC Wl of , -pn, wt of thne Cormn iaona to d" %leeclmiqu umd by fe stiff in eawu- The guides are Wled In fte flowng ton broad dhtalon: L F A", pro ns or POstulAtd cdn. or to provide guidanco to Gukdn we ro subetkutes for regubmora, ad eorn-

1. POVW Reaictors

6. Products P1Kmce wflh dn is not requed. Methode and aolutlons iffaMrnt from tioee 2. Reewch and Teat Rmctor 7. Treplortation ea out I dn quldee wl be acceptable ff they provide a beal for fte idge 3. Fu and MeRaNW ins Fact & Occupationel Inhld raque to dihenue m or condinumce of a peri or kern by dte 4. EnroM nenw and Sttig 9. Antitrust and Financial Review Conunlelon

5. MPa lIs and Plant Protectioi

10. General R qued a for age of inued gude (which nay be rprodu or for Convrdtnw and sn gest.or, forl- ipr ntes , in dine , guides are enouragd at pcmnt WChnintont D.C. tat r c of future guides sl times and guidee will be rewbee, n approprite to accomodat Iomet inapcfic I =iln a=uW be aein wrtn oteU.S. Nuclear Regulatory and to ~refetnw ioonormato or emperlec.Tegie rvade ei Comnimaon, Waatibigton, D.C. 2050, Attenrtion:

Dkactor, Division of of VAubeiv covnueta reoivdfo i ui ndaiinlae eiw Tedwilal infrm~rration and Document Control.

other hand, additional benefits can also accrue during advanced design stages and even dur ing early construction stages, as better evalu ation of dose-causing operations are available and further design refinements can be identi fied. In addition, operations that will need special planning and careful dose control can be identified at the preoperational stage when the applicant can take advantage of all design options for reducing the occupational dose. C. REGULATORY

POSITION This guide describes the format and content for assessments of the total annual occupational (man-rein)

dose at an LWR--principally during the design stage. The dose assessment at this stage should include estimated annual personnel exposures during normal operation and during anticipated operational occur rences. It should include estimates of the fre quency of occurrence, ,the existing or resulting radiation levels, the manpower requirements, and the duration of such activities.

These esti mates can be based on operating experience at similar plants. However, to the extent possible, estimates should include consideration of the design of the proposed plant, including radiation field intensities calculated on the basis of the plant-specific shielding design, taking into account the effect of any dose reducing design changes.

The dose assessment process and the con comitant dose reduction analysis should involve individuals trained in plant system design, shield design, plant operation, and health physics. Knowledge from all these disciplines should be applied to the dose assessment and to the entire radiation protection design review in determining cost-effective dose reductions.

Plant experience provides useful information on the numbers of people needed for jobs, the duration of different jobs, and the frequency of the jobs as well as on actual occupational radiation exposure experience.

The applicant should use personnel exposure data for specific kinds of work and job functions available from similar operating LWRs.* Useful reports on these data have been published by the Atomic Industrial Forum, Inc. and the Electric Power Research Institute, and a summary report on occupational radiation exposures at nuclear power plants is distributed annually by the Nuclear Regulatory Commission.

The occupational dose assessment should include projected doses during normal opera tions, anticipated operational occurrences, and shutdowns and should be based on anticipated radiation conditions after at least 5 years of plant operation.

Some of the exposure-causing activities that should be considered in this *See Regulatory Guide 1.16, "Reporting of Operating Infor mation--Appendix A Technical Specifications," for exapleo Of work and job functin.dose assessment include steam generator tube plugging and maintenance, repairs, inservice inspection, and replacement of pumps, valves, and gaskets. Doses from nonroutine activities that are anticipated operational occurrences should be included in the applicant's ALARA dose analysis.

Radiation sources and personnel activities that contribute significantly to occu pational radiation exposures should be clearly identified and analyzed with respect to similar exposures that have occurred under similar conditions at other operating facilities.

In this manner, corrective measures can be incorpora ted in the design at an early stage. Tables 1 through 8 are examples of work sheets for tabulation of data in the dose assessment process to indicate the factors con sidered. The actual numbers used in the tabu lations will depend on plant-specific information developed in the course of the dose assessment review. An objective of the dose assessment process should be to develop 1. A completed summary table of occupa tional radiation exposure estimates (such as Table 1), 2. Sufficient illustrative detail (such as that shown in Tables 2 through 8) to explain how the radiation exposure assessment process was performed, 3. A systematic process for considering and evaluating possible dose-reducing design changes and associated operating proce dure changes as part of the comprehen sive ongoing design review, and 4. A record of the rievidw procedures, documentation requirements, and identi fication of principal ALARA-related changes resulting from the dose assess ment. This record should be included in the assessment as a demonstration of the steps taken to ensure exposures will be ALARA. During the final design stage, dose assess ment should be updated to take into account any major design changes. In particular, com pleted shielding design and layout of equipment should permit better estimates of radiation field intensities in locations where work will be per formed. Analysis of the elements of the man-rem esti mate (e.g., radiation levels, task duration, and frequency), treated qualitatively, can be of significant value in making engineering judgments regarding design changes for ALARA purposes.

As a result of the dose assessment process described herein, it is to be expected that various dose-reducing design changes and innovations will be incorporated into the design.8.19-2 The precision of the man-rem estimate is of secondary importance.

That estimate's relation ship to actual man-rem doses received during subsequent plant operation will depend pri marily on operating experience and maintenance and repair problems encountered rather than on design projections, however precise.

Entries in the tables should be identified and their basis explained in the text of the report, e.g., available data from similar plants, expected (reduced)

values due to design, and engineering improvements.

Such information will readily identify those areas in which ALARA efforts are to be made or have been made. Additionally, it would be of value to indicate whether the reduced values in appli cable cases were derived on the basis of physical (or other) models. This would alert individuals concerned with the analysis of the occupational radiation dose assessment report in determining whether the well-intended im provements are productive or counterproduc tive.

D. IMPLEMENTATION

The purpose of this section is to provide in formation to applicants regarding the NRC staff's plans for using this regulatory guide. This guide reflects current NRC staff prac tice. Therefore, except in those cases in which the applicant proposes an acceptable alterna tive method for complying with specified por tions of the Commission's regulations, the method described herein is being and will con tinue to be used in the evaluation of submittals in connection with applications for construction permits or operating licenses until this guide is revised as a result of suggestions from the public or additional staff review. For construc tion permits, the review will focus principally on design considerations;

for operating licenses, the review will focus principally on administrative and procedural considerations.

8.19-3 TABLE 1 TOTAL OCCUPATIONAL

RADIATION

EXPOSURE ESTIMATES

Dose Activity (man-reins/year)

Reactor operations and surveillance (see Tables 2 & 3) Routine maintenance (see Table 4) Waste processing (see Table 5) Refueling (see Table 6) Inservice inspection (see Table 7) Special maintenance (see Table 8) Total man-reins/year Occupational exposures from Tables 2 through 8 are entered in Table 1 and added to obtain the facility's estimated total yearly occupational dose.8.19-4 TABLE 2 OCCUPATIONAL

DOSE ESTIMATES

DURING ROUTINE OPERATIONS

AND SURVEILLANCE

Activity Walking in radiation zones Checking systems and equipment:

Containment cooling system Boron acid (BA) makeup system Fuel pool system Control rod drive (CRD) system Other systems (specify):

! 1 Pumps: CRD Residual heat removal Accumulators Pressurizer valves Other equipment (specify):

.Total Average dose rate (mrem/hr)Exposure Number of time per workers event (hr) Utility Contractor Number of events per year Dose (man-rems/year)

Utility Contractor

-+ -*The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant.

TABLE 3 OCCUPATIONAL

DOSE ESTIMATES

DURING NONROUTINE

OPERATION

AND SURVEILLANCE

Activity Operation of systems equipment:

Safety injection system Feedwater pumps & turbine Instrument calibration Other (specify):

Collection of radioactive samples: Liquid Gas Solid Radiochemistry Radwaste operation Health physics Other (specify):

Total Average dose rate (mrem/hr)Exposure Number of Number of time per workers events event (hr) Utility Contractor per year Dose (man-rems/year)

Utility Contractor

-+ =The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant.00 cO !

TABLE 4 OCCUPATIONAL

DOSE ESTIMATES

DURING ROUTINE MAINTENANCE

Average dose rate (mrem/hr)Activity Changing filters: Waste filter Laundry filter Boron acid filter Pressure valves BA makeup pump o* BA holding pump Instrumentation and controls:

Transmitter inside containment Transmitter outside containment Radwaste processing system Other (specify):

Total*The list of activities is for illustrative Exposure time per event (hr)Number of workers Utility Contractor Number of events per year Dose (man-reins/year)

Utility Contractor

-+ -purposes only, is not all inclusive, and would be expected to vary from plant to plant.

TABLE 5 OCCUPATIONAL

DOSE ESTIMATES

DURING WASTE PROCESSING

Activity Control room Sampling and filter changing Panel operation, inspection and testing Operation of waste processing and packaging equipment Other (Specify):

Average dose rate (mrem/hr)Exposure time per event (hr)Number of workers Utility Contractor Number of events per year Dose (man-rems/year)

Utility Contractor

-+ -Total not all inclusive, and would be expected to vary from plant to plant.*The list of activities is for illustrative purposes only, is I OO

TABLE 6 OCCUPATIONAL

DOSE ESTIMATES

DURING REFUELING

Average Exposure Number of Number of Dose , dose rate time per workers events (man-reins/year)

Activity (mrem/hr)

event (hr) Utility Contractor per yearl Utility Contractor Reactor pressure vessel head and internals- removal and installation

---Fuel preparation


Fuel handling -----Fuel shipping -----Other (specify):


?D Total ---+ = CD I The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant. Most work functions performed during refueling, and the associated occupational dose received, will vary depending on facility design (BWR or PWR), reactor pressure vessel size, and number of fuel assemblies in the reactor core. For a detailed description of pre-planned activities, time, and manpower schedule, refer to the "critical path for refueling tasks," which should be available from the Nuclear Steam Supply System (NSSS) supplier.I

TABLE 7 OCCUPATIONAL

DOSE ESTIMATES

DURING INSERVICE

INSPECTION

Average Exposure Number of Number of Dose dose rate time per workers events (man-reins/year)

Activity (mrem/hr)

event (hr) Utility Contractor per year Utility Contractor Providing access: installation of platforms, ladders, etc., removal of thermal insulation Inspection of welds Follow up: installation of thermal insulation, platform removal, and cleanup Total + -= *The list of activities is for illustrative purposes only, is not all inclusive, and would be expected to vary from plant to plant. 0 Estimates should be based on average yearly values over a 10-year period. Variations are expected as a consequence of reactor size, design, number of welds to be inspected yearly, and the degree of equipment automation available for remote examination of welds.I

TABLE 8 OCCUPATIONAL

DOSE ESTIMATES

DURING SPECIAL MAINTENANCE

Activity Servicing of control rod drives Servicing of in-core detectors Replacement of control blades Dechanneling of spent and channeling of new fuel assemblies Steam generator repairs Other (specify):

I I-.Average dose rate (mrem/hr)Exposure time per event (hr)Number of workers Utility Contractor Number of events per year Dose (man-rems/year)

Utility Contractor Total-+ -=The list of activities is for illustrative purposes only, is not all inclusive, and from plant to plant.would be expected to vary significantly Most preplanned (or routine) maintenance activities during outage are described in the "critical path for refueling tasks," which should be available from the NSSS supplier, and are performed in parallel with the critical path refueling tasks to shorten reactor outage time.