ML090540897: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML090540897
| number = ML090540897
| issue date = 02/20/2009
| issue date = 02/20/2009
| title = Palo Verde Nuclear Generating Station, Units 1, 2, and 3 - Notification of NRC Initial Operator Licensing Examination 05000528/2009301; 05000529/2009301; 05000530/2009301
| title = Notification of NRC Initial Operator Licensing Examination 05000528/2009301; 05000529/2009301; 05000530/2009301
| author name = Lantz R E
| author name = Lantz R
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Edington R K
| addressee name = Edington R
| addressee affiliation = Arizona Public Service Co
| addressee affiliation = Arizona Public Service Co
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000528/2009301]]
See also: [[see also::IR 05000528/2009301]]


=Text=
=Text=
{{#Wiki_filter:February 20, 2009  
{{#Wiki_filter:UNITED STATES
                                  NUC LE AR RE G UL AT O RY C O M M I S S I O N
                                                      R E GI ON I V
                                          612 EAST LAMAR BLVD , SU I TE 400
Randall K. Edington, Executive  
                                            AR LI N GTON , TEXAS 76011-4125
  Vice President, Nuclear/CNO  
                                              February 20, 2009
Mail Station 7602  
Randall K. Edington, Executive
Arizona Public Service Company  
Vice President, Nuclear/CNO
P. O. Box 52034  
Mail Station 7602
Phoenix, AZ 85072-2034  
Arizona Public Service Company
P. O. Box 52034
Phoenix, AZ 85072-2034
SUBJECT:        PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -
                NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
                05000528/2009301; 05000529/2009301; 05000530/2009301
Dear Mr. Edington:
In a telephone conversation on January 7, 2009, between Messrs. Warren Potter, Licensed
Training Supervisor, and Steve Garchow, Chief Examiner, arrangements were made for the
administration of licensing examinations at Palo Verde Nuclear Generating Station during the
week of November 9, 2009.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The Nuclear Regulatory
Commissions (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by August 17, 2009. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by September 11, 2009.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,
examinations, and tests before they are submitted to the NRC for review and approval. All
materials shall be complete and ready to use. We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked. Any delay in receiving the required examinations and
reference materials, or the submittal of inadequate or incomplete materials, may cause the
examinations to be rescheduled. In addition, your support for on-site validation of the
examinations is required during the week of September 28, 2009.


Arizona Public Service Corporation            -2-
SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
In order to conduct the requested written examinations and operating tests, it will be necessary
05000528/2009301; 05000529/2009301; 05000530/2009301 
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
Dear Mr. Edington:
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary. Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRCs Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the
electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-
rm/adams.html.


Arizona Public Service Corporation            -3-
In a telephone conversation on January 7, 2009, between Messrs. Warren Potter, Licensed
Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and
Training Supervisor, and Steve Garchow, Chief Examiner, arrangements were made for the
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
administration of licensing examinations at Palo Verde Nuclear Generating Station during the
procedures and guidelines, please contact Mr. Garchow at 817-276-4426, or myself at
week of November 9, 2009.
817-860-8159.
                                              Sincerely,
                                              /RA/ Bernard W. Stapleton for
                                              Ryan E. Lantz, Chief
                                              Operations Branch
                                              Division of Reactor Safety
Dockets: 50-528; 50-529; 50-530
Licenses: NPF-41; NPF-51; NPF-74
cc:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, AZ 85007
Mr. Douglas Kent Porter
Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P. O. Box 800
Rosemead, CA 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, AZ 85003
Mr. Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, AZ 85040
Mr. Scott Bauer, Director
Regulatory Affairs
Palo Verde Nuclear Generating Station
Mail Station 7636
P. O. Box 52034
Phoenix, AZ 85072-2034


Arizona Public Service Corporation        -4-
As agreed during the telephone conversation, your staff will prepare the examinat
Mr. Dwight C. Mims
ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power  
Vice President
Reactors," Revision 9, S
Regulatory Affairs and Plant Improvement
upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  The Nuclear Regulatory
Palo Verde Nuclear Generating Station
Mail Station 7605
P .O. Box 52034
Phoenix, AZ 85072-2034
Mr. Jeffrey T. Weikert
Assistant General Counsel
El Paso Electric Company
Mail Location 167
123 W. Mills
El Paso, TX 79901
Mr. Eric Tharp
Los Angeles Department of Water & Power
Southern California Public Power Authority
P. O. Box 51111, Room 1255-C
Los Angeles, CA 90051-0100
Mr. James Ray
Public Service Company of New Mexico
2401 Aztec NE, MS Z110
Albuquerque, NM 87107-4224
Mr. Geoffrey M. Cook
Southern California Edison Company
5000 Pacific Coast Hwy. Bldg. D21
San Clemente, CA 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, AZ 85251
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P. O. Box 13326
Austin, TX 78701-3326
Environmental Program Manager
City of Phoenix
Office of Environmental Programs
200 West Washington Street
Phoenix, AZ 85003


Commission's (NRC) regional office will discuss with your staff any changes t
Arizona Public Service Corporation    -5-
hat might be necessary before the examinations are administered.
Mr. John C. Taylor
Director, Nuclear Generation
El Paso Electric Company
340 East Palm Lane, Suite 310
Phoenix, AZ 85004
Chief, Radiological Emergency Preparedness Section
FEMA Region 9
1111 Broadway, Suite 1200
Oakland, CA 94607-4052


Arizona Public Service Corporation         -6-
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 17, 2009.  The written examinations, operating tests, and supporting
Electronic distribution by RIV:
reference materials identified in Attachment 3 to ES-201 will be due by September 11, 2009.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR
Regional Administrator (Elmo.Collins@nrc.gov)
 
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.  All
DRP Director (Dwight.Chamberlain@nrc.gov)
materials shall be complete and ready to use.  We request that any personal, proprietary,
DRP Deputy Director (Anton.Vegel@nrc.gov)
sensitive unclassified, or safeguards information in your response be contained in a separate
DRS Director (Roy.Caniano@nrc.gov)
enclosure and appropriately marked.  Any delay in receiving the required examinations and
DRS Deputy Director (Troy.Pruett@nrc.gov)
reference materials, or the submittal of inadequate or incomplete materials, may cause the
Senior Resident Inspector (Ryan.Treadway@nrc.gov)
examinations to be rescheduled.  In addition, your support for on-site validation of the
Resident Inspector (Michelle.Catts@nrc.gov)
examinations is required during the week of September 28, 2009.
Resident Inspector (Jim.Melfi@nrc.gov)
 
Resident Inspector (Joseph.Bashore@nrc.gov)
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Arizona Public Service Corporation - 2 -
PV Site Secretary (Patricia.Coleman@nrc.gov)
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
In order to conduct the requested written examinations and
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
RITS Coordinator (Marisa.Herrera@nrc.gov)
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures,
File located:
temperatures, and levels) generated during the dynamic operating tests until the examination
SUNSI Rev Compl.       x Yes     No   ADAMS     x Yes     No   Reviewer Initials   SMG
results are final.
Publicly Avail         x Yes     No   Sensitive   Yes x No   Sens. Type Initials SMG
 
SOE:OB                   C:OB
SMGarchow               RELantz BSW for
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
2/20/09                 2/20/09
 
/RA/                     /RA/
OFFICIAL RECORD COPY                                 T=Telephone     E=E-mail     F=Fax
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval number
3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if
any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If
the applications are not received at least 30 days before the examination date, a postponement
may be necessary.  Signed applications certifying that all training has been completed should be
submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009.  The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information.  Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. 
Arizona Public Service Corporation - 3 -
Thank you for your cooperation in this matter.  Mr. Potter has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Garchow at 817-276-4426, or myself at 
817-860-8159.
 
      Sincerely, 
 
      /RA/ Bernard W. Stapleton for 
      Ryan E. Lantz, Chief Operations Branch      Division of Reactor Safety
 
Dockets:  50-528; 50-529; 50-530
Licenses:  NPF-41; NPF-51; NPF-74
 
cc:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, AZ  85007
 
Mr. Douglas Kent Porter
Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P. O. Box 800
Rosemead, CA  91770
 
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, AZ  85003
 
Mr. Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, AZ  85040
 
Mr. Scott Bauer, Director
Regulatory Affairs
Palo Verde Nuclear Generating Station
Mail Station 7636
P. O. Box 52034
Phoenix, AZ  85072-2034 
Arizona Public Service Corporation - 4 -
Mr. Dwight C. Mims
Vice President
Regulatory Affairs and Plant Improvement
Palo Verde Nuclear Generating Station
Mail Station 7605
P .O. Box 52034
Phoenix, AZ  85072-2034
 
Mr. Jeffrey T. Weikert
Assistant General Counsel
El Paso Electric Company
Mail Location 167
123 W. Mills
El Paso, TX  79901
 
Mr. Eric Tharp
Los Angeles Department of Water & Power
Southern California Public Power Authority
P. O. Box 51111, Room 1255-C
Los Angeles, CA 90051-0100
 
Mr. James Ray
Public Service Company of New Mexico
2401 Aztec NE, MS Z110
Albuquerque, NM  87107-4224
 
Mr. Geoffrey M. Cook
Southern California Edison Company
5000 Pacific Coast Hwy. Bldg. D21
San Clemente, CA  92672
 
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, AZ  85251
 
Mr. Brian Almon
Public Utility Commission
William B. Travis Building
P. O. Box 13326
Austin, TX  78701-3326
 
Environmental Program Manager
City of Phoenix
Office of Environmental Programs
200 West Washington Street
Phoenix, AZ  85003 
Arizona Public Service Corporation - 5 -
Mr. John C. Taylor
Director, Nuclear Generation
El Paso Electric Company
340 East Palm Lane, Suite 310
Phoenix, AZ  85004
 
Chief, Radiological Emergency Preparedness Section
FEMA Region 9
1111 Broadway, Suite 1200
Oakland, CA  94607-4052 
Arizona Public Service Corporation - 6 -  
Electronic distribution by RIV:  
 
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov)  
DRP Director (Dwight.Chamberlain@nrc.gov)  
DRP Deputy Director (Anton.Vegel@nrc.gov)  
DRS Director (Roy.Caniano@nrc.gov)  
DRS Deputy Director (Troy.Pruett@nrc.gov)  
Senior Resident Inspector (Ryan.Treadway@nrc.gov)  
Resident Inspector (Michelle.Catts@nrc.gov)  
Resident Inspector (Jim.Melfi@nrc.gov)  
Resident Inspector (Joseph.Bashore@nrc.gov)  
Branch Chief, DRP/D (Michael.Hay@nrc.gov)  
PV Site Secretary (Patricia.Coleman@nrc.gov)  
Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
 
File located:   SUNSI Rev Compl. x Yes No ADAMS x Yes   No Reviewer Initials SMG Publicly Avail x Yes No Sensitive Yes x No Sens. Type Initials SMG  
SOE:OB C:OB     SMGarchow RELantz BSW for   2/20/09 2/20/09   /RA/ /RA/   OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax
}}
}}

Latest revision as of 09:42, 14 November 2019

Notification of NRC Initial Operator Licensing Examination 05000528/2009301; 05000529/2009301; 05000530/2009301
ML090540897
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/20/2009
From: Ryan Lantz
Operations Branch IV
To: Edington R
Arizona Public Service Co
References
IR-09-301
Download: ML090540897 (6)


See also: IR 05000528/2009301

Text

UNITED STATES

NUC LE AR RE G UL AT O RY C O M M I S S I O N

R E GI ON I V

612 EAST LAMAR BLVD , SU I TE 400

AR LI N GTON , TEXAS 76011-4125

February 20, 2009

Randall K. Edington, Executive

Vice President, Nuclear/CNO

Mail Station 7602

Arizona Public Service Company

P. O. Box 52034

Phoenix, AZ 85072-2034

SUBJECT: PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION

05000528/2009301; 05000529/2009301; 05000530/2009301

Dear Mr. Edington:

In a telephone conversation on January 7, 2009, between Messrs. Warren Potter, Licensed

Training Supervisor, and Steve Garchow, Chief Examiner, arrangements were made for the

administration of licensing examinations at Palo Verde Nuclear Generating Station during the

week of November 9, 2009.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The Nuclear Regulatory

Commissions (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by August 17, 2009. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by September 11, 2009.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines,

examinations, and tests before they are submitted to the NRC for review and approval. All

materials shall be complete and ready to use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of September 28, 2009.

Arizona Public Service Corporation -2-

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should be

submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRCs Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide

Documents Access and Management System (ADAMS). ADAMS is accessible from the

electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-

rm/adams.html.

Arizona Public Service Corporation -3-

Thank you for your cooperation in this matter. Mr. Potter has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Garchow at 817-276-4426, or myself at

817-860-8159.

Sincerely,

/RA/ Bernard W. Stapleton for

Ryan E. Lantz, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-528; 50-529; 50-530

Licenses: NPF-41; NPF-51; NPF-74

cc:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, AZ 85007

Mr. Douglas Kent Porter

Senior Counsel

Southern California Edison Company

Law Department, Generation Resources

P. O. Box 800

Rosemead, CA 91770

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson, 10th Floor

Phoenix, AZ 85003

Mr. Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, AZ 85040

Mr. Scott Bauer, Director

Regulatory Affairs

Palo Verde Nuclear Generating Station

Mail Station 7636

P. O. Box 52034

Phoenix, AZ 85072-2034

Arizona Public Service Corporation -4-

Mr. Dwight C. Mims

Vice President

Regulatory Affairs and Plant Improvement

Palo Verde Nuclear Generating Station

Mail Station 7605

P .O. Box 52034

Phoenix, AZ 85072-2034

Mr. Jeffrey T. Weikert

Assistant General Counsel

El Paso Electric Company

Mail Location 167

123 W. Mills

El Paso, TX 79901

Mr. Eric Tharp

Los Angeles Department of Water & Power

Southern California Public Power Authority

P. O. Box 51111, Room 1255-C

Los Angeles, CA 90051-0100

Mr. James Ray

Public Service Company of New Mexico

2401 Aztec NE, MS Z110

Albuquerque, NM 87107-4224

Mr. Geoffrey M. Cook

Southern California Edison Company

5000 Pacific Coast Hwy. Bldg. D21

San Clemente, CA 92672

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale, AZ 85251

Mr. Brian Almon

Public Utility Commission

William B. Travis Building

P. O. Box 13326

Austin, TX 78701-3326

Environmental Program Manager

City of Phoenix

Office of Environmental Programs

200 West Washington Street

Phoenix, AZ 85003

Arizona Public Service Corporation -5-

Mr. John C. Taylor

Director, Nuclear Generation

El Paso Electric Company

340 East Palm Lane, Suite 310

Phoenix, AZ 85004

Chief, Radiological Emergency Preparedness Section

FEMA Region 9

1111 Broadway, Suite 1200

Oakland, CA 94607-4052

Arizona Public Service Corporation -6-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ryan.Treadway@nrc.gov)

Resident Inspector (Michelle.Catts@nrc.gov)

Resident Inspector (Jim.Melfi@nrc.gov)

Resident Inspector (Joseph.Bashore@nrc.gov)

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

PV Site Secretary (Patricia.Coleman@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

File located:

SUNSI Rev Compl. x Yes No ADAMS x Yes No Reviewer Initials SMG

Publicly Avail x Yes No Sensitive Yes x No Sens. Type Initials SMG

SOE:OB C:OB

SMGarchow RELantz BSW for

2/20/09 2/20/09

/RA/ /RA/

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax