ENS 41181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/28/2004 13:02 CDT
| event date = 09/28/2004 13:02 CDT
| last update date = 11/08/2004
| last update date = 11/08/2004
| title = Invalid Primary Containment Isolation System Actuation From Loss-Of-Power To Reactor Protection System (Rps) Bus 2A  
| title = Invalid Primary Containment Isolation System Actuation from Loss-Of-Power to Reactor Protection System (Rps) Bus 2A  
| event text = This 60-day telephone notification is being made under reporting requirements specified by 10 CFR 50.73(a)(2)(iv)(A) to describe an invalid actuation of general containment isolation signals affecting more than one system.
| event text = This 60-day telephone notification is being made under reporting requirements specified by 10 CFR 50.73(a)(2)(iv)(A) to describe an invalid actuation of general containment isolation signals affecting more than one system.
On September 28, 2004, with Unit 2 operating at 100% thermal power, at 1302 hours CDT during maintenance work associated with protective relaying on 480 VAC Shutdown Board 2A, the board was inadvertently tripped. Associated RPS motor-generator (MG) set 2A lost power, and RPS bus 2A, which is powered from this MG set, was de-energized. Primary Containment Isolation System (PCIS) logic circuits powered from this bus lost power, and PCIS logic Groups 2, 3, 6, and 8 were actuated.
On September 28, 2004, with Unit 2 operating at 100% thermal power, at 1302 hours CDT during maintenance work associated with protective relaying on 480 VAC Shutdown Board 2A, the board was inadvertently tripped. Associated RPS motor-generator (MG) set 2A lost power, and RPS bus 2A, which is powered from this MG set, was de-energized. Primary Containment Isolation System (PCIS) logic circuits powered from this bus lost power, and PCIS logic Groups 2, 3, 6, and 8 were actuated.

Latest revision as of 21:22, 1 March 2018

ENS 41181 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+976.05 h40.669 days <br />5.81 weeks <br />1.337 months <br />)
Opened: Don Smith
11:05 Nov 8, 2004
NRC Officer: Howie Crouch
Last Updated: Nov 8, 2004
41181 - NRC Website
Loading map...