ENS 43292: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/09/2007 07:30 EDT
| event date = 04/09/2007 07:30 EDT
| last update date = 04/10/2007
| last update date = 04/10/2007
| title = Seismic Monitoring System Out Of Service
| title = Seismic Monitoring System Out of Service
| event text = On April 9, 2007, at approximately 0730 hours, the keyswitch for the Seismic Monitoring System was discovered in the off position, rendering the Seismic Monitoring System unavailable.  The system has apparently been in this configuration since March 29, 2007, when deficiencies were found during routine calibration checks.  The ability to declare an Unusual Event per Emergency Action Level 8.A.1 would not be significantly hampered by this event, because this declaration would be based on either personnel feeling an earthquake, or detection via the Seismic Monitoring System.  However, the unavailability of the Seismic Monitoring System could potentially hamper the operators in determining the magnitude of an earthquake in order to determine if it reached Operating Basis Earthquake levels or Safe Shutdown Earthquake levels.  Therefore, this could potentially hamper the declaration of an Alert or Site Area Emergency, respectively, per Emergency Action Levels 8.A.2 or 8.A.3.  Therefore, this event is being considered reportable per 10 CFR 50.72(b)(3)(xiii), as it results in a loss of emergency assessment capability. Compensatory measures are being established to obtain an off-site source of this information in a timeframe that can support timely declaration of an emergency.
| event text = On April 9, 2007, at approximately 0730 hours, the keyswitch for the Seismic Monitoring System was discovered in the off position, rendering the Seismic Monitoring System unavailable.  The system has apparently been in this configuration since March 29, 2007, when deficiencies were found during routine calibration checks.  The ability to declare an Unusual Event per Emergency Action Level 8.A.1 would not be significantly hampered by this event, because this declaration would be based on either personnel feeling an earthquake, or detection via the Seismic Monitoring System.  However, the unavailability of the Seismic Monitoring System could potentially hamper the operators in determining the magnitude of an earthquake in order to determine if it reached Operating Basis Earthquake levels or Safe Shutdown Earthquake levels.  Therefore, this could potentially hamper the declaration of an Alert or Site Area Emergency, respectively, per Emergency Action Levels 8.A.2 or 8.A.3.  Therefore, this event is being considered reportable per 10 CFR 50.72(b)(3)(xiii), as it results in a loss of emergency assessment capability. Compensatory measures are being established to obtain an off-site source of this information in a timeframe that can support timely declaration of an emergency.
The licensee will notify the NRC Resident Inspector.
The licensee will notify the NRC Resident Inspector.

Latest revision as of 21:16, 1 March 2018

ENS 43292 +/-
Where
Davis Besse Cleveland Electric icon.png
Ohio (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+3.78 h0.158 days <br />0.0225 weeks <br />0.00518 months <br />)
Opened: Thomas Phillips
15:17 Apr 9, 2007
NRC Officer: John Knoke
Last Updated: Apr 10, 2007
43292 - NRC Website
Loading map...