ENS 47315: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 10/03/2011 08:50 CDT | | event date = 10/03/2011 08:50 CDT | ||
| last update date = 10/03/2011 | | last update date = 10/03/2011 | ||
| title = Technical Support Center Out | | title = Technical Support Center Out of Service for Planned Maintenance | ||
| event text = At 0850 [CDT] on Monday, October 03, the Callaway Plant Technical Support Center (TSC) is undergoing planned maintenance to repair MTSUB7001, Manual Transfer Switch between normal and emergency power. This maintenance is currently scheduled to last for 1 day, at which time the TSC will be restored to service. During this period, the TSC will be without either normal or emergency power, thus rendering it non-functional. | | event text = At 0850 [CDT] on Monday, October 03, the Callaway Plant Technical Support Center (TSC) is undergoing planned maintenance to repair MTSUB7001, Manual Transfer Switch between normal and emergency power. This maintenance is currently scheduled to last for 1 day, at which time the TSC will be restored to service. During this period, the TSC will be without either normal or emergency power, thus rendering it non-functional. | ||
If an emergency is declared requiring TSC activation while the TSC is non-functional, TSC emergency response personnel will report to their backup locations in accordance with Callaway Plant emergency planning procedures. | If an emergency is declared requiring TSC activation while the TSC is non-functional, TSC emergency response personnel will report to their backup locations in accordance with Callaway Plant emergency planning procedures. |
Latest revision as of 22:05, 1 March 2018
Where | |
---|---|
Callaway Missouri (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.43 h-0.143 days <br />-0.0204 weeks <br />-0.0047 months <br />) | |
Opened: | Gerry Rauch 10:24 Oct 3, 2011 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Oct 3, 2011 |
47315 - NRC Website
| |