ENS 47446: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 09/13/2011 09:00 EST
| event date = 09/13/2011 09:00 EST
| last update date = 11/16/2011
| last update date = 11/16/2011
| title = Early Site Permit Postulated Seismic Acceleration Is Less Than Projected Based On New Information
| title = Early Site Permit Postulated Seismic Acceleration Is Less than Projected Based on New Information
| event text = On August 23, 2011, an earthquake occurred with an epicenter 11 miles from the North Anna Unit 3 site. Instruments recorded earthquake data at the North Anna Unit 1 containment structure base mat. Certified data regarding the earthquake was received on September 13, 2011 and a Condition Report was initiated. This best available earthquake data exceeded at low frequencies the Safe-Shutdown Earthquake (SSE) response spectra established in the North Anna Early Site Permit (ESP-003). The event data also exceeded the site 250 foot elevation Ground Motion Response Spectra (GMRS) and the hard rock SSE developed for the North Anna Unit 3 Combined Operating License Application (COLA) based on the ESP SSE spectra.
| event text = On August 23, 2011, an earthquake occurred with an epicenter 11 miles from the North Anna Unit 3 site. Instruments recorded earthquake data at the North Anna Unit 1 containment structure base mat. Certified data regarding the earthquake was received on September 13, 2011 and a Condition Report was initiated. This best available earthquake data exceeded at low frequencies the Safe-Shutdown Earthquake (SSE) response spectra established in the North Anna Early Site Permit (ESP-003). The event data also exceeded the site 250 foot elevation Ground Motion Response Spectra (GMRS) and the hard rock SSE developed for the North Anna Unit 3 Combined Operating License Application (COLA) based on the ESP SSE spectra.
The US-APWR standard plant (i.e., Reactor Building Complex and Power Source Building) Certified Seismic Design Response Spectra (CSDRS) envelops the actual seismic response recorded on August 23, 2011. However, the site-specific Seismic Category I Ultimate Heat Sink Related Structures, Essential Service Water Pipe Tunnel and Power Source Fuel Storage Vault use design inputs presented in the ESP. The recorded seismic response on August 23, 2011 exceeded the seismic design spectra presented in the ESP and COLA.
The US-APWR standard plant (i.e., Reactor Building Complex and Power Source Building) Certified Seismic Design Response Spectra (CSDRS) envelops the actual seismic response recorded on August 23, 2011. However, the site-specific Seismic Category I Ultimate Heat Sink Related Structures, Essential Service Water Pipe Tunnel and Power Source Fuel Storage Vault use design inputs presented in the ESP. The recorded seismic response on August 23, 2011 exceeded the seismic design spectra presented in the ESP and COLA.

Latest revision as of 21:05, 1 March 2018

ENS 47446 +/-
Where
North Anna Dominion icon.png
Virginia (NRC Region 2)
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+1532.58 h63.858 days <br />9.122 weeks <br />2.099 months <br />)
Opened: Joseph Hegner
11:35 Nov 16, 2011
NRC Officer: Howie Crouch
Last Updated: Nov 16, 2011
47446 - NRC Website
Loading map...