ENS 48365: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| facility = Iris Ndt Matrix | | facility = Iris Ndt Matrix | ||
| Organization = Louisiana Radiation Protection Div | | Organization = Louisiana Radiation Protection Div | ||
| license number = | | license number = LA-12236-L01 | ||
| region = 4 | | region = 4 | ||
| state = Louisiana | | state = Louisiana | ||
Line 16: | Line 16: | ||
| event date = 09/05/2012 10:45 CDT | | event date = 09/05/2012 10:45 CDT | ||
| last update date = 10/01/2012 | | last update date = 10/01/2012 | ||
| title = Agreement State Report - Radiography Camera Source Unable | | title = Agreement State Report - Radiography Camera Source Unable to Be Retracted | ||
| event text = The following information was provided from the State of Louisiana via facsimile: | | event text = The following information was provided from the State of Louisiana via facsimile: | ||
IRISNDT dispatched a radiography crew to Marathon Petroleum on September 5, 2012. The crew set up and began work around 6:30 am. The crew worked with a camera, associated equipment, and a collimator for hours before there was a problem. [At 1045 CDT] the source setup was about 15 feet up above the ground in the pipe rack when the source would not return into the shielded position. After several attempts to retrieve the source, the RSO was notified. The crew was instructed to secure the barricade at the 2 mR distance and maintain observing the area until the RSO could arrive. The RSO arrived and secured the source into the exposure device's shielded position. | IRISNDT dispatched a radiography crew to Marathon Petroleum on September 5, 2012. The crew set up and began work around 6:30 am. The crew worked with a camera, associated equipment, and a collimator for hours before there was a problem. [At 1045 CDT] the source setup was about 15 feet up above the ground in the pipe rack when the source would not return into the shielded position. After several attempts to retrieve the source, the RSO was notified. The crew was instructed to secure the barricade at the 2 mR distance and maintain observing the area until the RSO could arrive. The RSO arrived and secured the source into the exposure device's shielded position. |
Latest revision as of 19:15, 24 November 2018
Where | |
---|---|
Iris Ndt Matrix Baton Rouge, Louisiana (NRC Region 4) | |
License number: | LA-12236-L01 |
Organization: | Louisiana Radiation Protection Div |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+624.5 h26.021 days <br />3.717 weeks <br />0.855 months <br />) | |
Opened: | Joe Noble 16:15 Oct 1, 2012 |
NRC Officer: | John Knoke |
Last Updated: | Oct 1, 2012 |
48365 - NRC Website | |