ENS 48932: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
| event date = 04/16/2013 16:25 EDT | | event date = 04/16/2013 16:25 EDT | ||
| last update date = 06/04/2013 | | last update date = 06/04/2013 | ||
| title = Potential Cable Size | | title = Potential Cable Size and Breaker Mismatch | ||
| event text = During investigation of a documentation discrepancy, a potential cable size and breaker mismatch was identified to exist in a non-safety related DC panel. Initial evaluation has shown that the cable may heat and be potentially damaged if exposed to a 'smart' high impedance fault for an extended period. This discovered condition has not been previously analyzed for NFPA [National Fire Protection Association] 805 common enclosure circuit coordination. | | event text = During investigation of a documentation discrepancy, a potential cable size and breaker mismatch was identified to exist in a non-safety related DC panel. Initial evaluation has shown that the cable may heat and be potentially damaged if exposed to a 'smart' high impedance fault for an extended period. This discovered condition has not been previously analyzed for NFPA [National Fire Protection Association] 805 common enclosure circuit coordination. | ||
Fire watches were established as a compensatory measure immediately following identification of the issue on April 8, 2013. An initial review of fire protection analysis was completed on April 16, 2013. Fire watches remain in place until a modification which will restore coordination is complete. | Fire watches were established as a compensatory measure immediately following identification of the issue on April 8, 2013. An initial review of fire protection analysis was completed on April 16, 2013. Fire watches remain in place until a modification which will restore coordination is complete. |
Latest revision as of 21:00, 1 March 2018
Where | |
---|---|
Harris North Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-3.17 h-0.132 days <br />-0.0189 weeks <br />-0.00434 months <br />) | |
Opened: | Mark Lee 17:15 Apr 16, 2013 |
NRC Officer: | Charles Teal |
Last Updated: | Jun 4, 2013 |
48932 - NRC Website
| |