ENS 50188: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/10/2014 23:27 EDT
| event date = 06/10/2014 23:27 EDT
| last update date = 06/11/2014
| last update date = 06/11/2014
| title = Offsite Notification Due To An Inadvertent Activation Of An Emergency Siren
| title = Offsite Notification Due to an Inadvertent Activation of an Emergency Siren
| event text = On 6/10/14 at approximately 2327 EDT, the Operations Shift Manager was made aware that the Berrien County Sheriffs Department (BCSD) had been notified of an Emergency Siren that had actuated. BCSD was notified by local residents. BCSD reset the emergency siren and a local police officer verified the siren was no longer actuating.
| event text = On 6/10/14 at approximately 2327 EDT, the Operations Shift Manager was made aware that the Berrien County Sheriffs Department (BCSD) had been notified of an Emergency Siren that had actuated. BCSD was notified by local residents. BCSD reset the emergency siren and a local police officer verified the siren was no longer actuating.
The cause of the actuation is under investigation at this time. The siren remains in service pending further investigation. There are a total of 70 sirens and all remain functional.
The cause of the actuation is under investigation at this time. The siren remains in service pending further investigation. There are a total of 70 sirens and all remain functional.

Latest revision as of 21:50, 1 March 2018

ENS 50188 +/-
Where
Cook American Electric Power icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-2.07 h-0.0863 days <br />-0.0123 weeks <br />-0.00284 months <br />)
Opened: Dean Bruck
01:23 Jun 11, 2014
NRC Officer: Dong Park
Last Updated: Jun 11, 2014
50188 - NRC Website
Loading map...