| event date = 05/15/2016 06:38 EDT
| event date = 05/15/2016 06:38 EDT
| last update date = 05/15/2016
| last update date = 05/15/2016
| title = Unusual Event Due To Main Generator Hydrogen Leak In Turbine Building
| title = Unusual Event Due to Main Generator Hydrogen Leak in Turbine Building
| event text = At 0638 EDT on 5/15/2016, an Unusual Event (EAL GU.2) was declared on Millstone Unit 3 due to a Main Generator hydrogen gas leak into the Turbine Building. At 0645 EDT, operators manually tripped the reactor. All rods inserted. All systems functioned as expected following the reactor trip. Operators are currently venting the remaining hydrogen from the generator through the normal vent path. There is no safety related equipment out-of-service. The plant is in a normal post-trip electrical line-up. All Emergency Diesel Generators are available.
| event text = At 0638 EDT on 5/15/2016, an Unusual Event (EAL GU.2) was declared on Millstone Unit 3 due to a Main Generator hydrogen gas leak into the Turbine Building. At 0645 EDT, operators manually tripped the reactor. All rods inserted. All systems functioned as expected following the reactor trip. Operators are currently venting the remaining hydrogen from the generator through the normal vent path. There is no safety related equipment out-of-service. The plant is in a normal post-trip electrical line-up. All Emergency Diesel Generators are available.
The licensee notified the State of Connecticut and the NRC Resident Inspector.
The licensee notified the State of Connecticut and the NRC Resident Inspector.

Latest revision as of 20:45, 1 March 2018

ENS 51929 +/-
Where
Millstone Dominion icon.png
Connecticut (NRC Region 1)
Reporting
Emergency class: Unusual Event
10 CFR 50.72(a) (1) (i), Emergency Class Declaration

10 CFR 50.72(b)(3)(iv)(A), System Actuation

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation
Time - Person (Reporting Time:+-3.5 h-0.146 days <br />-0.0208 weeks <br />-0.00479 months <br />)
Opened: Michael Ciccone
07:08 May 15, 2016
NRC Officer: Donald Norwood
Last Updated: May 15, 2016
51929 - NRC Website