ENS 52534: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 02/03/2017 15:45 EST
| event date = 02/03/2017 15:45 EST
| last update date = 02/03/2017
| last update date = 02/03/2017
| title = Unit 1 Manual Reactor Trip Due To Loop 1 Msiv Starting To Fail Closed
| title = Unit 1 Manual Reactor Trip Due to Loop 1 Msiv Starting to Fail Closed
| event text = At 1545 EST on 2/3/17, Vogtle Unit 1 was manually tripped from 100% power when loop 1 Main Steam Isolation Valve (MSIV) started to fail closed. Non-Safety Related 4160V bus 1NA01 failed to transfer to alternate incoming power supply automatically and was successfully manually energized.
| event text = At 1545 EST on 2/3/17, Vogtle Unit 1 was manually tripped from 100% power when loop 1 Main Steam Isolation Valve (MSIV) started to fail closed. Non-Safety Related 4160V bus 1NA01 failed to transfer to alternate incoming power supply automatically and was successfully manually energized.
All control rods fully inserted and AFW [Auxiliary Feedwater] and FWI [Feedwater Isolation] actuated as expected.
All control rods fully inserted and AFW [Auxiliary Feedwater] and FWI [Feedwater Isolation] actuated as expected.

Latest revision as of 21:43, 1 March 2018

ENS 52534 +/-
Where
Vogtle Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.82 h-0.0758 days <br />-0.0108 weeks <br />-0.00249 months <br />)
Opened: Matthew Norris
18:56 Feb 3, 2017
NRC Officer: Steve Sandin
Last Updated: Feb 3, 2017
52534 - NRC Website
Loading map...