ML14155A461: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14155A461
| number = ML14155A461
| issue date = 06/04/2014
| issue date = 06/04/2014
| title = Comanche Peak [50-445; 50-446], Single Positive Test Form Collected on 01/20/2014
| title = Single Positive Test Form Collected on 01/20/2014
| author name =  
| author name =  
| author affiliation = Luminant Generation Co, LLC
| author affiliation = Luminant Generation Co, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC FFD Program Performance Data Reporting System Single Positive Test Form for the EIE General Submission Portal Select Facility Comanche Peak [50-445; 50-446]
{{#Wiki_filter:NRC FFD Program Performance Data Reporting System Single Positive Test Form for the EIE General Submission Portal Note:
Reason for Testing  
Submission Update                                                                              1) All fields are required except those marked 'optional'.
- 26.717(b)(5)
: 2) Entries in some form fields may result in information being auto-Unique Reference Number (Licensee Supplied)                                                        populated into other form fields.
Pre-Access Pre-Access Testing Reason (optional)
: 3) Use Adobe Reader 8 or later for this form to work properly.
Initial Authorization Please elaborate (optional)
CPNPP 14-01                                                                                        4) Hold your mouse over a form field to view additional information.
Employment Type
Select Facility Comanche Peak [50-445; 50-446]                                                                           Date of Collection (mm/dd/yyyy)        01/20/2014 Reason for Testing - 26.717(b)(5)             Pre-Access Testing Reason (optional)                         Please elaborate (optional)
- 26.717(b)(3)
Pre-Access                                    Initial Authorization Employment Type - 26.717(b)(3)
Contractor/Vendor Labor Category
Contractor/Vendor Labor Category - 26.717(b)(3)
- 26.717(b)(3)
Maintenance (Craft)
Maintenance (Craft)
Refusal - 26.717(b)(7) & 26.75 Was this collection refused (Yes / No)?
Refusal - 26.717(b)(7) & 26.75 Was this collection refused (Yes / No)?   No Test Results - 26.717(b)(4)
Test Results  
Test Validity Valid Test Type(s) for Result(s) Reported - 26.717(b)(2)                             Drug Testing Drug Only                                                                       Urine Was this collection observed (Yes / No)? - 26.717(b)(7) & 26.75       No Substance - 26.717(b)(2) & (b)(6)                       Additional Substance (as applicable)                     Additional Substance (as applicable)
- 26.717(b)(4)
Amphetamines                                            Please Select                                             Please Select Use NRC Cutoff (Yes / No)?       Yes                      Use NRC Cutoff (Yes / No)?     Yes                        Use NRC Cutoff (Yes / No)?           Yes Is this a 24-Hour Reporting Event (Yes/No)? - 26.719(b)      No Subversion Attempts - 26.717(b)(7) and 26.75(b)
Test Validity ValidTest Type(s) for Result(s) Reported - 26.717(b)(2)
Did this collection involve a subversion attempt (Yes/No)?   No Management Actions - 26.717(b)(8) & 26.75 Reason for the Action First drug or alcohol positive Sanction Applied (NRC Minimum or Licensee Administrated)
Drug Only Drug Testing UrineWas this collection observed (Yes / No)?
Licensee Administrated Specific Sanction Applied 5- Year Denial Person(s) Responsible for Information Provided Person 1 (required):
- 26.717(b)(7) & 26.75 Amphetamines Substance  
Bobby                                  Hammer                              Sr. Nuclear Analysr                        bobby.hammer@luminant.com First Name                           Last Name                            Position Title                             Company Email Address Person 2 (optional):
- 26.717(b)(2) & (b)(6)Additional Substance (as applicable)Additional Substance (as applicable)
First Name                            Last Name                            Position Title                            Company Email Address Final Step (Required) - NRC will consider this form authentic in accordance with 26.11 only when the Validate & Lock button has been selected and all errors (i.e., those highlighted in red) have been corrected. The Validate & Lock button will change to Locked after the data validation process has been successfully completed and the form is ready for submission.
Please Select Please Select Use NRC Cutoff (Yes / No)?
Locked            Form Locked On: Apr 30, 2014 at 7:10:07 AM                                                   Save to Local PC              Print this Report Single Positive Test Form version 1.4.0 - Oct 31, 2012}}
YesUse NRC Cutoff (Yes / No)?
YesUse NRC Cutoff (Yes / No)?
YesManagement Actions
- 26.717(b)(8) & 26.75 Specific Sanction Applied 5- Year Denial Save to Local PC Print this Report Unique Reference Number (Licensee Supplied)
CPNPP 14-01 Note: 1) All fields are required except those marked 'optional'.
: 2) Entries in some form fields may result in information being auto-populated into other form fields.
: 3) Use Adobe Reader 8 or later for this form to work properly.
: 4) Hold your mouse over a form field to view additional information.
Is this a 24-Hour Reporting Event (Yes/No)?  
- 26.719(b)
NoNoNoDate of Collection (mm/dd/yyyy) 01/20/2014 Submission Update Person(s) Responsible for Information Provided Company Email Address bobby.hammer@luminant.com First Name BobbyPosition Title Sr. Nuclear Analysr Position Title First Name Last Name Last Name HammerCompany Email Address Person 1 (required):
Person 2 (optional):
Single Positive Test Form version 1.4.0 - Oct 31, 2012 Final Step (Required) -
NRC will consider this form authentic in accordance with 26.11 only when the "Validate & Lock" button has been selected and all errors (i.e., those highlighted in red) have been corrected. The "Validate & Lock" button will change to "Locked" after the data valid ation process has been successfully completed and the form is ready for submission.
LockedForm Locked On:
Apr 30, 2014 at 7:10:07 AM Reason for the Action First drug or alcohol positive Did this collection involve a subversion attempt (Yes/No)?
NoSubversion Attempts
- 26.717(b)(7) and 26.75(b)
Sanction Applied (NRC Minimum or Licensee Administrated)
Licensee Administrated}}

Latest revision as of 04:44, 4 November 2019

Single Positive Test Form Collected on 01/20/2014
ML14155A461
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/04/2014
From:
Luminant Generation Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
Paul Harris - 287-9294
References
Download: ML14155A461 (1)


Text

NRC FFD Program Performance Data Reporting System Single Positive Test Form for the EIE General Submission Portal Note:

Submission Update 1) All fields are required except those marked 'optional'.

2) Entries in some form fields may result in information being auto-Unique Reference Number (Licensee Supplied) populated into other form fields.
3) Use Adobe Reader 8 or later for this form to work properly.

CPNPP 14-01 4) Hold your mouse over a form field to view additional information.

Select Facility Comanche Peak [50-445; 50-446] Date of Collection (mm/dd/yyyy) 01/20/2014 Reason for Testing - 26.717(b)(5) Pre-Access Testing Reason (optional) Please elaborate (optional)

Pre-Access Initial Authorization Employment Type - 26.717(b)(3)

Contractor/Vendor Labor Category - 26.717(b)(3)

Maintenance (Craft)

Refusal - 26.717(b)(7) & 26.75 Was this collection refused (Yes / No)? No Test Results - 26.717(b)(4)

Test Validity Valid Test Type(s) for Result(s) Reported - 26.717(b)(2) Drug Testing Drug Only Urine Was this collection observed (Yes / No)? - 26.717(b)(7) & 26.75 No Substance - 26.717(b)(2) & (b)(6) Additional Substance (as applicable) Additional Substance (as applicable)

Amphetamines Please Select Please Select Use NRC Cutoff (Yes / No)? Yes Use NRC Cutoff (Yes / No)? Yes Use NRC Cutoff (Yes / No)? Yes Is this a 24-Hour Reporting Event (Yes/No)? - 26.719(b) No Subversion Attempts - 26.717(b)(7) and 26.75(b)

Did this collection involve a subversion attempt (Yes/No)? No Management Actions - 26.717(b)(8) & 26.75 Reason for the Action First drug or alcohol positive Sanction Applied (NRC Minimum or Licensee Administrated)

Licensee Administrated Specific Sanction Applied 5- Year Denial Person(s) Responsible for Information Provided Person 1 (required):

Bobby Hammer Sr. Nuclear Analysr bobby.hammer@luminant.com First Name Last Name Position Title Company Email Address Person 2 (optional):

First Name Last Name Position Title Company Email Address Final Step (Required) - NRC will consider this form authentic in accordance with 26.11 only when the Validate & Lock button has been selected and all errors (i.e., those highlighted in red) have been corrected. The Validate & Lock button will change to Locked after the data validation process has been successfully completed and the form is ready for submission.

Locked Form Locked On: Apr 30, 2014 at 7:10:07 AM Save to Local PC Print this Report Single Positive Test Form version 1.4.0 - Oct 31, 2012