ML15324A257: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/20/2015
| issue date = 11/20/2015
| title = Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
| title = Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
| author name = Montgomery C K
| author name = Montgomery C
| author affiliation = NRC/NRR/DPR
| author affiliation = NRC/NRR/DPR
| addressee name = Adams A
| addressee name = Adams A
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCEWITHORDEREA 049ORDERCOMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTSEricEBowman Eric E. BowmanSpecial Advisor, Japan Lessons-Learned Division PurposeThe purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
{{#Wiki_filter:DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 ORDER COMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E Bowman Eric E. Bowman Special Advisor, Japan Lessons-Learned Division
1.Revisionreflectslessonslearnedfrom 1.Revision reflects lessons learned from reviews and acceptable alternative


approachesComments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
2 Availability for Comment*Federal Register Notice published November102015(80FR69703)
: 1. Revision reflects lessons learned from
November 10, 2015 (80 FR 69703)*JLD-ISG-2012-01, Draft Revision 1 at ML15294A078*Comment period through December 10, 2015*www.regulations.
: 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
govdocket ID: NRC-gg2012-0068 3
2
Endorsement of Industry Guidance ithClifitidAdditi with Clarifications and AdditionsNEI 12-06
, "Diverse and Flexible Co ping ,pgStrategies (FLEX) Implementation Guide,"
Revision 1A, dated October 2015, ML15279A426 4
Reformatted to Align with DG-13011.Development and Implementation Process2.Equipment Capacity3.Reasonable Protection4.Equipment Maintenance 5ConfigurationControl 5.Configuration Control6.Treatment of Reevaluated HazardsGidfAP1000Di 7.Guidance for AP1000 Design5 NEI 12-06 New Elements*Resolution of generic concerns from reviewsreviews*Appendix E validation process 6
Mitigating Strategies Assessments*Addressing reevaluated seismic and floodinghazardsunderMarch122012 flooding hazards under March 12, 2012 request for informationFLEXdMdifidFLEX
-FLEX and Modified FLEX-Alternative Mitigating Strategies
-Targeted Hazard Mitigating Strategies 7
Mitigating Strategies Assessments, CtidContinued*Flooding-NEI12-06,AppendixG Flooding NEI 1206, Appendix G*Seismic -placeholder in NEI 12-06 for AppendixHwithsubstantialelementsin Appendix H with substantial elements in ISG 6.1 to solicit comments 8
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCEWITHORDEREA 049ORDERCOMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTSEricEBowman Eric E. BowmanSpecial Advisor, Japan Lessons-Learned Division PurposeThe purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
1.Revisionreflectslessonslearnedfrom 1.Revision reflects lessons learned from reviews and acceptable alternative  


approachesComments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
Availability for Comment
2 Availability for Comment*Federal Register Notice published November102015(80FR69703)
* Federal Register Notice published November 10 2015 (80 FR 69703)
November 10, 2015 (80 FR 69703)*JLD-ISG-2012-01, Draft Revision 1 at ML15294A078*Comment period through December 10, 2015*www.regulations.
November 10, 2015 (80 FR 69703)
govdocket ID: NRC-gg2012-0068 3
* JLD-ISG-2012-01, Draft Revision 1 at ML15294A078
Endorsement of Industry Guidance ithClifitidAdditi with Clarifications and AdditionsNEI 12-06
* Comment period through December 10, 2015
, "Diverse and Flexible Co ping ,pgStrategies (FLEX) Implementation Guide,"
* www.regulations.gov docket ID: NRC-g g
Revision 1A, dated October 2015, ML15279A426 4
2012-0068 3
Reformatted to Align with DG-13011.Development and Implementation Process2.Equipment Capacity3.Reasonable Protection4.Equipment Maintenance 5ConfigurationControl 5.Configuration Control6.Treatment of Reevaluated HazardsGidfAP1000Di 7.Guidance for AP1000 Design5 NEI 12-06 New Elements*Resolution of generic concerns from reviewsreviews*Appendix E validation process 6
 
Mitigating Strategies Assessments*Addressing reevaluated seismic and floodinghazardsunderMarch122012 flooding hazards under March 12, 2012 request for informationFLEXdMdifidFLEX
Endorsement of Industry Guidance ith Cl ifi ti d Additi with Clarifications and Additions NEI 12-06, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4
-FLEX and Modified FLEX-Alternative Mitigating Strategies
 
-Targeted Hazard Mitigating Strategies 7
Reformatted to Align with DG-1301
Mitigating Strategies Assessments, CtidContinued*Flooding-NEI12-06,AppendixG Flooding NEI 1206, Appendix G*Seismic -placeholder in NEI 12-06 for AppendixHwithsubstantialelementsin Appendix H with substantial elements in ISG 6.1 to solicit comments 8}}
: 1. Development and Implementation Process
: 2. Equipment Capacity
: 3. Reasonable Protection
: 4. Equipment Maintenance 5 Configuration Control
: 5. Configuration Control
: 6. Treatment of Reevaluated Hazards G id f
AP1000 D i
: 7. Guidance for AP1000 Design 5
 
NEI 12-06 New Elements
* Resolution of generic concerns from reviews reviews
* Appendix E validation process 6
 
Mitigating Strategies Assessments
* Addressing reevaluated seismic and flooding hazards under March 12 2012 flooding hazards under March 12, 2012 request for information FLEX d M difi d FLEX
- FLEX and Modified FLEX
- Alternative Mitigating Strategies
- Targeted Hazard Mitigating Strategies 7
 
Mitigating Strategies Assessments, C
ti d
Continued
* Flooding - NEI 12-06, Appendix G Flooding NEI 12 06, Appendix G
* Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in Appendix H with substantial elements in ISG §6.1 to solicit comments 8
 
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 ORDER COMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E Bowman Eric E. Bowman Special Advisor, Japan Lessons-Learned Division
 
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
: 1. Revision reflects lessons learned from
: 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
2
 
Availability for Comment
* Federal Register Notice published November 10 2015 (80 FR 69703)
November 10, 2015 (80 FR 69703)
* JLD-ISG-2012-01, Draft Revision 1 at ML15294A078
* Comment period through December 10, 2015
* www.regulations.gov docket ID: NRC-g g
2012-0068 3
 
Endorsement of Industry Guidance ith Cl ifi ti d Additi with Clarifications and Additions NEI 12-06, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4
 
Reformatted to Align with DG-1301
: 1. Development and Implementation Process
: 2. Equipment Capacity
: 3. Reasonable Protection
: 4. Equipment Maintenance 5 Configuration Control
: 5. Configuration Control
: 6. Treatment of Reevaluated Hazards G id f
AP1000 D i
: 7. Guidance for AP1000 Design 5
 
NEI 12-06 New Elements
* Resolution of generic concerns from reviews reviews
* Appendix E validation process 6
 
Mitigating Strategies Assessments
* Addressing reevaluated seismic and flooding hazards under March 12 2012 flooding hazards under March 12, 2012 request for information FLEX d M difi d FLEX
- FLEX and Modified FLEX
- Alternative Mitigating Strategies
- Targeted Hazard Mitigating Strategies 7
 
Mitigating Strategies Assessments, C
ti d
Continued
* Flooding - NEI 12-06, Appendix G Flooding NEI 12 06, Appendix G
* Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in Appendix H with substantial elements in ISG §6.1 to solicit comments 8}}

Latest revision as of 07:24, 10 January 2025

Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events
ML15324A257
Person / Time
Site: Purdue University
Issue date: 11/20/2015
From: Cindy Montgomery
Division of Policy and Rulemaking
To: Alexander Adams
Division of Policy and Rulemaking
Uribe, Juan, NRR/JLD 415-3809
References
Download: ML15324A257 (8)


Text

DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 ORDER COMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E Bowman Eric E. Bowman Special Advisor, Japan Lessons-Learned Division

Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.

1. Revision reflects lessons learned from
1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.

2

Availability for Comment

  • Federal Register Notice published November 10 2015 (80 FR 69703)

November 10, 2015 (80 FR 69703)

  • Comment period through December 10, 2015
  • www.regulations.gov docket ID: NRC-g g

2012-0068 3

Endorsement of Industry Guidance ith Cl ifi ti d Additi with Clarifications and Additions NEI 12-06, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4

Reformatted to Align with DG-1301

1. Development and Implementation Process
2. Equipment Capacity
3. Reasonable Protection
4. Equipment Maintenance 5 Configuration Control
5. Configuration Control
6. Treatment of Reevaluated Hazards G id f

AP1000 D i

7. Guidance for AP1000 Design 5

NEI 12-06 New Elements

  • Resolution of generic concerns from reviews reviews
  • Appendix E validation process 6

Mitigating Strategies Assessments

  • Addressing reevaluated seismic and flooding hazards under March 12 2012 flooding hazards under March 12, 2012 request for information FLEX d M difi d FLEX

- FLEX and Modified FLEX

- Alternative Mitigating Strategies

- Targeted Hazard Mitigating Strategies 7

Mitigating Strategies Assessments, C

ti d

Continued

  • Flooding - NEI 12-06, Appendix G Flooding NEI 12 06, Appendix G
  • Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in Appendix H with substantial elements in ISG §6.1 to solicit comments 8

DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 ORDER COMPLIANCE WITH ORDER EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E Bowman Eric E. Bowman Special Advisor, Japan Lessons-Learned Division

Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.

1. Revision reflects lessons learned from
1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.

2

Availability for Comment

  • Federal Register Notice published November 10 2015 (80 FR 69703)

November 10, 2015 (80 FR 69703)

  • Comment period through December 10, 2015
  • www.regulations.gov docket ID: NRC-g g

2012-0068 3

Endorsement of Industry Guidance ith Cl ifi ti d Additi with Clarifications and Additions NEI 12-06, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4

Reformatted to Align with DG-1301

1. Development and Implementation Process
2. Equipment Capacity
3. Reasonable Protection
4. Equipment Maintenance 5 Configuration Control
5. Configuration Control
6. Treatment of Reevaluated Hazards G id f

AP1000 D i

7. Guidance for AP1000 Design 5

NEI 12-06 New Elements

  • Resolution of generic concerns from reviews reviews
  • Appendix E validation process 6

Mitigating Strategies Assessments

  • Addressing reevaluated seismic and flooding hazards under March 12 2012 flooding hazards under March 12, 2012 request for information FLEX d M difi d FLEX

- FLEX and Modified FLEX

- Alternative Mitigating Strategies

- Targeted Hazard Mitigating Strategies 7

Mitigating Strategies Assessments, C

ti d

Continued

  • Flooding - NEI 12-06, Appendix G Flooding NEI 12 06, Appendix G
  • Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in Appendix H with substantial elements in ISG §6.1 to solicit comments 8