ML17334A462: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 02/25/1983 | | issue date = 02/25/1983 | ||
| title = Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment | | title = Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment | ||
| author name = | | author name = Alexich M | ||
| author affiliation = AMERICAN ELECTRIC POWER SERVICE CORP. | | author affiliation = AMERICAN ELECTRIC POWER SERVICE CORP. | ||
| addressee name = | | addressee name = Denton H | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000315, 05000316 | | docket = 05000315, 05000316 | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:AMER1CAN-ELECTRIC | {{#Wiki_filter:AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos. | ||
1 and 2 | |||
Docket Nos. 50-315 and 50-316 License Nos. | |||
DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
== | ==Dear Mr. Denton:== | ||
In our letter No. AEP:NRC:0631A, dated September 29, | |||
However, | : 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737. | ||
However, by way of his {{letter dated|date=February 3, 1983|text=February 3, 1983, letter}} to Mr. | |||
Furthermore, | John E. Dolan, Mr. William O. Miller requested the remittance of | ||
Mr.Eisenhut.'s | $4,400 to cover the NRC review expenses. | ||
We wish to bring to your attention that on February 15, | |||
Consequently, | : 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal. | ||
Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr. | |||
Carl Walske of the Atomic Industrial Forum, dated January 28, | |||
: 1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6. | |||
Mr. | |||
Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal. | |||
The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public. | |||
By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment. | |||
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737. | |||
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned. | |||
Very truly yours, Nil n P. | |||
exich Assistant Vice President Nuclear Engineering MPA/md cc: | |||
John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman | |||
A | |||
~ | |||
"l | |||
'I | |||
(}} | |||
Latest revision as of 13:43, 7 January 2025
| ML17334A462 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/25/1983 |
| From: | Alexich M AMERICAN ELECTRIC POWER SERVICE CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323 | |
| Download: ML17334A462 (3) | |
Text
AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Denton:
In our letter No. AEP:NRC:0631A, dated September 29,
- 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.
However, by way of his February 3, 1983, letter to Mr.
John E. Dolan, Mr. William O. Miller requested the remittance of
$4,400 to cover the NRC review expenses.
We wish to bring to your attention that on February 15,
- 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.
Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.
Carl Walske of the Atomic Industrial Forum, dated January 28,
- 1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.
Mr.
Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.
The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.
By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Nil n P.
exich Assistant Vice President Nuclear Engineering MPA/md cc:
John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman
A
~
"l
'I
(