ML14247A152: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 3: Line 3:
| issue date = 09/04/2014
| issue date = 09/04/2014
| title = FOIA/PA-2014-0467-r - Copy of a Preliminary Numerical Study of the Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)
| title = FOIA/PA-2014-0467-r - Copy of a Preliminary Numerical Study of the Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)
| author name = Budnitz R J
| author name = Budnitz R
| author affiliation = Diablo Canyon Independent Safety Committee
| author affiliation = Diablo Canyon Independent Safety Committee
| addressee name = Graff M H
| addressee name = Graff M
| addressee affiliation = NRC/OIS/CSD/FPIB
| addressee affiliation = NRC/OIS/CSD/FPIB
| docket = 05000275, 05000323
| docket = 05000275, 05000323

Latest revision as of 08:33, 21 June 2019

FOIA/PA-2014-0467-r - Copy of a Preliminary Numerical Study of the Hazard from Local Landslide Tsunami Scenarios at the Diablo Canyon Site in Central California, Summary Report (Draft)
ML14247A152
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/04/2014
From: Budnitz R
Diablo Canyon Independent Safety Committee
To: Graff M
NRC/OIS/CSD/FPIB
References
FOIA/PA-2014-0467
Download: ML14247A152 (1)


Text