ML15084A346: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-15-083, Request to Change Cyber Security Implementation Plan Milestone 8 Completion Date]]
| number = ML15084A346
| issue date = 03/19/2015
| title = Beaver Valley, Units 1 and 2 - Request to Change Cyber Security Implementation Plan Milestone 8 Completion Date
| author name = Larson E A
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000334, 05000412
| license number = DPR-066, NPF-073
| contact person =
| case reference number = L-15-083
| package number = ML15084A344
| document type = Letter, Security Plan
| page count = 11
}}
 
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY - SECURIW-REI.ATED INFORMATIONWTHHOLD IN ACCORDANCE WITH 10 CFR 2.390FENOC^FirstEnergy Nuclaar Opentiry CompanyBe ave r V alley Power SfafionP.O. Box 4Shippingport, PA 1ffi77Eric A. LatsonSde Vice PresidentMarch 19, 2015L-l5-093ATTN: Document Control DeskU. S. Nuclear Regufatory CommissionWashington, DC 20555-0001
 
==SUBJECT:==
Beaver Valfey Power Station, Unit Nos. 1 andzDocket No. 50-334, License No. DPR-66Docket No. 50412, License No. NPF-73724-682-5234Fax: 724-643-806910 cFR 50.90Reouest to Ghange Cyber Securitv lmolementation Plan Milestone I Completion DatePursuant to 10 CFR 50.90, FirctEnergy Nuclear Operating Company (FENOC) isrequesting an amendment for the BeaverValley Power Station, Unit Nos. I and2,Operating Licenses.An evaluation of the proposed amendment is enclosed. FENOC is requesting NuclearRegulatory Commission (NRC) staff approval by January 2.2016 with an implementationperiod of 30 days following issuance of the amendment.FENOC requests that the enclosure, which contains security-related information, bewithheld from public disclosure in accordance with 10 CFR 2.390.There are no regulatory commitments contained in this submittal. lf there are anyquestions or if additional information is required, please contact Mr. Thomas A. LenE,Manager - Fleet Licensing, at (330) 315*810.The enclosure to this letter contains security-related information.Withhold from public disclosure under 10 CFR 2.390.Upon removal of the enclosure, this letter is uncontrolled.OFFICIAL USE ONLY - SECURITY.REISTED INFORMATION Beaver Valley Power Station, Unit Nos. 1 and2L-l5-093Page 2I declare under penalty of perjury that the foregoing is true and corect. Executed onMarch lcl ,2015.Sincerely,{cEric A. Larson
 
==Enclosure:==
Evaluation of Proposed Request for Licensing Actioncc: NRC Region lAdministratorNuclear Reactor Regufation Project ManagerNRC Resident InspectorDirector BRP/DEP (w/o encfosure)Site BRP/DEP Representative (w/o enclosure)
EnclosureL-15-093Evaluation of Proposed Request for Licensing Action(26 Pages Follow)
ATTACHMENT 2Proposed Unit 1 Facility Operating License Change(Mark-up)(1 Page Follows)
D.-7-PhvsicalPlobdionFENOC shallfufiy lmplement fid malntain In efled afl ptovi$ons of $e Commlssion-approved physicil *hurlty, fairiq and qualification, and safeguards oontingency plansIncluding amendmerG made pursuant to provlslons ol the Mlscellaneous Amendmentsand Search Requtranents EMslons to 10 CFR 73.55 (51 FR27817 and 27822) and bthe authority 10 CFR 50.90 and 10 CFR f0.54(p). The combinad set of phns. wttlcttcontains Srifeguards Inbrmatinn prdod*d under 10 CFR 73.21 is editled: BlaverValley Porver St*ion (BVPS) Physical Secudty Plan" submitled by letter September 9,2004, and supplemenied September 30,2fl04", October 14,2UJ/., and May 12, 2006.FENOC shdlfully implement and maintain ln ofrd all provisbns of the Commission-apppved cyUer seqrity plan (CSP), includlng changes made punuant to the authority o10 CFR 50.90 and 10 CFR 50.54(p). The Beaver Valley Po*tr Stdon CSP wasapproved by Llcense Amendment No.Allwotk and adlvlfles In connection wtth this ffiec{ shall be perfomed pursuant b theprcvlslons d the Commonwealth ol Penns$vanla Clean Streams Acts d June 24, 1913,io amended and of June A2, $37 , as amonded, and In accordance u,lth all permltslssued bythe Departnent of Erwfronmental Resources of the Commonwealth ofPennsylvanla.License Rena ral Commitnenb - The UFSAR supplement, as revlsed, submlttodpursuant to 10 CFR il.21(dl, descrlbes ceilaln futule adlvltes to be comple*d ptlol tobnd/or during the period dextended opefiaton- FENOC drall conptete these ac{vi0esln accordarrce urur nppenOlx A of NUREG-1929, Safety Evalua[on Repofl Related tothe Beawr Valley Folier Sbtifi, Unlts 1 and 2, dated October 2fl19, and SupSement 1d NUREG-1929. dated Oclober 2009, and shall notfi the NRG In wriilng when activltiesto be compl*bd prior b 0te pdiod of elttended operatlon are oomplete and can beverilied by NRC inspsdion.UFSAR Supplement Changes - Thc lnfonnatlon In tlre UFSAR supdement, as rcvised,submitted pursuant b 10 CFR54.21(d), shall be Incoporabd lnto the UFSAR asrequlrcd by 10 CFR $.71(e) trlowittg the hsuance of this renewed opraling llcense.UnU nat ripO*e ls complete, FENOC may not make changes to ll1e inturmation In thesupplemeil. Follovtftg hcoporation lnto the UFSAR. he need fur pior Commissionapprovalof any changes will be governEd by 10 CFR 50.59.Capaule Wltrdnwd Sdpdult - Fq the mrpwed operating license tenn, all capsules inhe nactorvcssel tral an rumovsd and testsd must meetthe bstprocedures andreporting requlrements of Amerlcan Society for Testng and Materlals (ASTlr) E- 185*2to'the extenf praclicatrle br the conliguration of lhe specimens In the capule. Anydtanges to the capsule withdrarval schedule, including spare capzules, must beapprovad bythe NRC pnorto implqnentdion.Containmerl Llner Vdurn*ic Inspec{hn -a) lf degnadation (grealer tran 10 percent of the nominal thldmess nol attibuhble lofabdcation/ersc{ion practftns) b Henffi*d in the non-random areas examined usingulfasonlc bsffig (UT) as described ln Supplement I of NUREG-1929' UTexaminathns shall be perfomed at addltonaltun-random areas, b be selededbased on tlrls operatng erycrlence. Should addltlonaldegnadaton be ldeniifred,addltlonal nontandom arsas shall be UT oomined until no further degradalion(greatertran 10 porcont of ulo nomlnalhickneee) is ltlenfilled. Allareas withdegradation shali ba reexamined owr at least the next three Euc*ssive lnspectlonperiods lo ensure trat progrcsein of the degradalion b not oocuning.Amendment No. 287Renewed Operating License DPR-66F.G.H.Beaver Valley Unit 1 ATTACHMENT 3Proposed Unit 2 Facility Operating License Ghange(Mark-up)(1 Page Folfows)  (2) Thofacitity requfres an wrryfibn froilm the requilernmts of f0 CFR 5{I,App*rd[xJ, Sedirn l1LD.2{bXii0- The judinceton of thb orcnplkn iswltairpd ln Sectin 52.6 d gppbne*ffi 5l,o fire $afety Bnaf ualion Reporttrd tttodfied Ia lstbrdalsd.tdy26. lS5- Ths stds envirsrrnedalassmsnnnt was Wbffi on illay 12" 1987 (52 FR 17651) ard sn June 9,1!lS (tr FR 30611} Ttprefore, pursuentlo {0 CFR 5t}.12(afi1} and 10CfR 5ll-l2{ail2[il and fi}, Baaver Vatery Psenr Stak}n, lJnil 2 b exenqfiforn tn quded roqllelrnntsild irililed. is rquired to perfumtheovsail aL lod( bd( hC et prccam Pa bcbre est*Fshirry containmentinte$ity if ail lod( mrinlersrce has been perhrmed ftat ou,rH ffiect Otea[rb* sedng cryabiff. Locd ld( rab tesning at a pre$sure d]d lesshilt P3 ray be subotlhiled hr m ouwall air locfr hst nrhere fie desftpperntbFtrysical SecuriryFEltlm shafl tfy implerililt d ma-nah in efied all provisbrc sf tpOommissl@ ptrynicd secrtily, hft*rg and Walificatim, andssfqudswttirqencydils ittdudtrg ffi rnade prrsuantto prwisist$ oftlpM[smhpots A]rHdrEntB end Scarch Requirernents rwisims b 10 CFR 71.55t51 fR 27817 and Ti8flZland b fte afrnrly I0 CFR 5tl.Sl ard 10CFR50-54b1- Tho mnttned sdd phr, uilich $*elns S@uads Infonnaliongilecbd-urder l0 CFR 7321b srtidcd: "Be*erVdley Pmur Stalion (BVPSIPttyulcd Seflrily Plm'srbritled by fdbr Septenrber , erd srrylernmtedSepternhr S,4n04, October IA,TJ0!., and lilny lld flffi-FENOC she[ frfyitnpfement md ruilah in efuctall pruuishm of treCommission.appouuA cper senrly Can tSP), incLding *arqie$ mderurwant b fttB authorityof 10 CFR 50gt ard 10 CFR 50-5{p)- Ihe BesverValley Pmrer$alim CSPrffi apprord by Uense Arrwrffir{ hb- 17{,,*F- Fire ftoleFligr Proornn (Sedrtn 9-5"'l of SER Supgennnt 3)FENOC sha[ inphnwrt and mdntain ln ffi all pouisftnsof the appwed fteprcileclhn prqgrnn n ffid in the Firnl Safdy Armlysb RWrt duoqghAmendnrent No, 17, and subrni[ds trd iiry 18, lulsyZ{l, May2t, Jme24 andJgU!, 1987, and as descrbed h fire S#y Euafuation Report dated Otuhr1S5, ard W 1 ttrougtr6, $fiedlothe illoruiry prmision:FENOC mabt nnke drarryss to the +proved fire prolection prugnam rnithnil piraptrovuf of tre Connision uty iltrm dangm urudd nat *ersly ffieot Spabiny to acfiioye and mfibin safu shrrlddnn i-n ttre erront o,f a fre- 'Beever Va$ey Unit 2Arnendnrent Na 174Rernmpd Openatirg Llcense tfPFfgE.
ATTACHMENT4Proposed Unit 1 Facility Operating License Change(Re-typed)(1 Page Follows)
D.-7-Physical ProbctionFENOC shall fully implement and maintaln in effect all provisions of the Commission-appoved physlcal securlty, talnlng and guallflcaton, and safeguards conlingency plansincluding amendmenb made pusuant to prwisions of the Miscelhneous Arnendments andSearch Requlrements revlsions to 10 GFR 73.55 (51 FR27817 and27822l and b theauthodty 10 CFR 50.90 antl 10 CFR 50.54(p). The comblned set of plans, wlrlcfr contalnsSaEguards Informatlon protecbd under 10 CFR 73.21 is enlitled: "BeaverValley PorverShtion (BVPS) Physical Secudg Plan" submitted by lefrer September 9, 20(X, andsupplemented September30,2qt4, October 14,2trl/., and May 12,2006.FENOC shallfirlly implement and malntaln In eflect all provlslons of the Gommission-aprwed cyber secudty plan (CSP), induding changes made pursuant to the authodty of10 CFR 50.9t1 and 10 CFR 50.54(p). The Bsaver Valley Power Station GSP wasapprwed by Licensa Amendmenihio- 287, and amend6d by License Amendment No. IAll uork and ac{ivities in connedion with thls prciect shall be perbrmed pursuant b theprovisions of the Gommonvealth of Pennsylvanla Clean Streams Acts of June 24. 1913, asamendod and otJunc 22,1987, as amended, and In accordance wlth allpermlts lssued bythe Departnent of Environmental Resources of the Commonweallh of Pennsylvrania-Llcense Renewal Comml0nents - The UFSAR supplemant, as revlsed. submltted pursuantto 10 CFR 54.21(d). desqibes ceilain future activilies b be completed prior to and/orduring fre pefiod of extended opentlon. FENOC shall complete these activities inacordance wlth Appendlx A of NUREG-1929, Safety Evaluation Repoil Related to lheBeaver Valley Porer Shtion, UniF I and 2, dated Octo0er 2009, and Supplement 1 ofNUREG-1929, dabd Odober 2009, and shall notify he NRC in writing when actlvities to becompleted prlorto the perlod of extended operation are complete and can be verified byNRC inspection-UFSAR Supplement Changos - The Information In the UFSAR supplement, as revised,submitEd pusuantto 10 CFR54.21(d), shal be inoorporated Into the UFSAR as requitedby 10 CFR 50.71(e) blloring the bsuance of thls renalad oparatlng license. Unlil thatupdate is compbte, FENOC may not make dranges to the Inbrmatlon In the supplement.Folloring Incorporation into the UFSAR, the need for prior Commlssion apprwal of anychanges wlll be govemed by 10 CFR 50.59.Capsule Wlthdrawal Schedule - Forthe renewed operating license term, all capsules In thereactor vessel that are removed and tested must meet the test procedures and repoilingrequlrements of Amerlcan Soclety for Testlrg and Materials (ASTM) E 18542 to the extentpracticable for the configuraton of the spocimens in the capsule. Any changes to thecapsule withdrawal schedule, includlng spare capsules. musl be approved by the NRC fiorto lmplemenhtlon.Containment Liner Volumetlc Inspection -a) lf degradation (greater than 10 perccnt of the nominal hickness not attibutable tofabricaton/erection pracdces) is ldentlfed In he non-nndom areas examined uslngultrasonic testing (UT) as descdbed In Supplement 1 of NUREG-1929, UTexamlnatlons shall be perbrmed at additional non-random areas, to be selectedbased on this operatlng experlence. ShouH additionaldegradation be identilied,addltional non+andom areas shall be UT examined until no fuiher degradation(greater than 10 percent of the nominal thidrness) ls identified. All areas withdegradation shall be reexamlned over at least the noxt ftree successlve Inryectlonperiods to ensure that progression of the degradatlon ls not occunlng.Amendment No.Renewed Operating License DPR-66E.F.G.H.Beaver Valfey Unit 1 ATTACHMENT 5Proposed Unit 2 Facility Operating License Change(Re-typed)(1 Page Follows)
E.-8-(21 The facility requires an excmplion ffom the requirements of 10 CFR 50,Appendix J, Section lll.D.2(bxii). The juslillcation of this exemplion iscontalned In Sectlcn 6.2.6 of Supplement 5 to the Safety Evalualion Reportand modilied by a letbr dalecl July 26, 1995. The staffs envirortmentalassessnentwas publlshed on May 12,1987 (52 FR 176511 and on Jun* 9,1995 (60 FR 30611). Therefore, pursuant to 10 CFR 50.12(aX1) and 10CFR 50.12(ax2xll) and (lil), Bearor Valley Power Statbn, Unit 2 is exemptfom the quoted requirements and instead, is required to perbrm theoverall alr lock leak test at pressure Ps before establlshing contrainmentinlegfity if air lod< maintenancc has been performed that could afiect thealr lock sealing cryablllty. Local leak rate tes0ng at a pressure of not less. than Ps may be substifuted br an overall air lodt test where the designpermib.Phlaical SecurltyFENOC shallfully implement and malnbin in effect all provisions of tpCommission-approved phynielseorri$, haining and qualification, and safeguardscontingency plans Includlng amcndments made purcuant to provlslonq of theMlscellaneous Amendmentrs and Search Requirements revisions to 10 CFR 73.55(51 FR 27817 arfr27822land to the authority 10 CFR 50.90 and 10 CFR50.54(p). The combined set of plans, whictr contains $afeguards Informationprotected under 10 CFR 73.21 ls entiUed: "BeaverValley Powcr Stttktn (BVPS)Physlcal Secunty Plan" submltbd by letter September 9, 2(X14. and suppbmentedSeptember30,2004, October 14,20fl/', and May 12,20ffi.FENOC shalf tully implement and mahtaln In effect allprovisions of 0reCommission-approved cyber searity plan (CSP), including changes madepursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). TtE BeaverValley Power Sbtion CSP was approved by License Amendment No. 174,and amended by Llcense Amendment No.Fire Proteclion Proonam (Secton 9.5.1 of $ER Supplement 3)FENOC shall implement aM maintain in efiect aT povisions of the approved fireprotec'tion program as descrlbed In the Final Safety Analysis ReporthrwghAmendment No. 17, and submlttals dated May 18, May 20, May 21, June 24 ardJuly 6, 1987, and as described In the Sabty Evaluation Repod dated Oc{oher1985, and Supplements 1 through 6, sublect to the follotving provlslon:FENOC may make changes to the approved fire protection program without prlorapprcval of the Commission onty if those changes wouH not advsrcely affect theabllity to adtieve and malntaln safe shutdown in the event of a fire-Amendment No.Renewed Operating License NPF-73F.Beaver Valley Unit 2}}

Latest revision as of 14:20, 7 April 2019