ML16015A186: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4) | ||
FPL-024C ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #: FPL-024C-00-BD01 Identified: 1/4/2016 Admitted: 1/4/2016 Withdrawn: | |||
Section 2 Rejected: Stricken: | |||
Other: | |||
2-95 FPL Turkey Point Annual Post-Uprate Monitoring Report Figure 2.3-1. TPGW-1 Water Elevations. Figure 2.3-2. TPGW-2 Water Elevations. | |||
for Units 3 & 4 Uprate Project - August 2014 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-3. TPGW-3 Water Elevations. | |||
Figure 2.3-4. TPGW-4 Water Elevations. | |||
2-96 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-5. TPGW-5 Water Elevations. | |||
Figure 2.3-6. TPGW-6 Water Elevations. | |||
2-97 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-7. TPGW-7 Water Elevations. | |||
Figure 2.3-8. TPGW-8 Water Elevations. | |||
2-98 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-9. TPGW-9 Water Elevations. | |||
Figure 2.3-10. TPGW-10 Water Elevations. | |||
2-99 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-11. TPGW-11 Water Elevations. | |||
Figure 2.3-12. TPGW-12 Water Elevations. | |||
2-100 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-13. TPGW-13 Water Elevations. | |||
Figure 2.3-14. TPGW-14 Water Elevations. | |||
2-101 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7. | |||
2-102 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4. | |||
2-103 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12. | |||
2-104 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5 | |||
-0.5 | |||
-1.5 | |||
-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14. | |||
2-105 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2. | |||
2-106 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7. | |||
2-107 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3. | |||
2-108 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 | |||
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations. | |||
2-109 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 | |||
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations. | |||
2-110 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 | |||
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations. | |||
2-111 | |||
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4) | |||
FPL-024C ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #: FPL-024C-00-BD01 Identified: 1/4/2016 Admitted: 1/4/2016 Withdrawn: | |||
Section 2 Rejected: Stricken: | |||
Other: | |||
2-95 FPL Turkey Point Annual Post-Uprate Monitoring Report Figure 2.3-1. TPGW-1 Water Elevations. Figure 2.3-2. TPGW-2 Water Elevations. | |||
for Units 3 & 4 Uprate Project - August 2014 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-3. TPGW-3 Water Elevations. | |||
Figure 2.3-4. TPGW-4 Water Elevations. | |||
2-96 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-5. TPGW-5 Water Elevations. | |||
Figure 2.3-6. TPGW-6 Water Elevations. | |||
2-97 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-7. TPGW-7 Water Elevations. | |||
Figure 2.3-8. TPGW-8 Water Elevations. | |||
2-98 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-9. TPGW-9 Water Elevations. | |||
Figure 2.3-10. TPGW-10 Water Elevations. | |||
2-99 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-11. TPGW-11 Water Elevations. | |||
Figure 2.3-12. TPGW-12 Water Elevations. | |||
2-100 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-13. TPGW-13 Water Elevations. | |||
Figure 2.3-14. TPGW-14 Water Elevations. | |||
2-101 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7. | |||
2-102 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4. | |||
2-103 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12. | |||
2-104 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5 | |||
-0.5 | |||
-1.5 | |||
-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14. | |||
2-105 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2. | |||
2-106 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7. | |||
2-107 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3. | |||
2-108 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 | |||
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations. | |||
2-109 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 | |||
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations. | |||
2-110 | |||
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0 | |||
-1.0 | |||
-2.0 | |||
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations. | |||
2-111}} |
Latest revision as of 02:11, 31 October 2019
ML16015A186 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 08/31/2014 |
From: | Florida Power & Light Co |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, RAS 28503 | |
Download: ML16015A186 (17) | |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
FPL-024C ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #: FPL-024C-00-BD01 Identified: 1/4/2016 Admitted: 1/4/2016 Withdrawn:
Section 2 Rejected: Stricken:
Other:
2-95 FPL Turkey Point Annual Post-Uprate Monitoring Report Figure 2.3-1. TPGW-1 Water Elevations. Figure 2.3-2. TPGW-2 Water Elevations.
for Units 3 & 4 Uprate Project - August 2014
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
2-96
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
2-97
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
2-98
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
2-99
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
2-100
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
2-101
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
2-102
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
2-103
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
2-104
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5
-0.5
-1.5
-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
2-105
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
2-106
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
2-107
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
2-108
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.
2-109
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.
2-110
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.
2-111
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
FPL-024C ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #: FPL-024C-00-BD01 Identified: 1/4/2016 Admitted: 1/4/2016 Withdrawn:
Section 2 Rejected: Stricken:
Other:
2-95 FPL Turkey Point Annual Post-Uprate Monitoring Report Figure 2.3-1. TPGW-1 Water Elevations. Figure 2.3-2. TPGW-2 Water Elevations.
for Units 3 & 4 Uprate Project - August 2014
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
2-96
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
2-97
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
2-98
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
2-99
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
2-100
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
2-101
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-13S TPGW-5S TPGW-7S Figure 2.3-15. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
2-102
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-14S TPGW-9S TPGW-4S Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
2-103
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 Water Elevation (ft, NAVD 88) 1.0 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-3S TPGW-13S TPGW-12S Figure 2.3-17. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
2-104
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.5 Water Elevation (ft, NAVD 88) 0.5
-0.5
-1.5
-2.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-10S TPGW-11S TPGW-13S TPGW-14S Figure 2.3-18. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
2-105
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-13S TPSWCCS-2B Figure 2.3-19. Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
2-106
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B Figure 2.3-20. Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
2-107
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 TPGW-11S TPBBSW-3B Figure 2.3-21. Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
2-108
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-22. TPBBSW-10 Water Elevations.
2-109
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-23. TPBBSW-3 Water Elevations.
2-110
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2.0 1.0 Water Elevation (ft, NAVD 88) 0.0
-1.0
-2.0
-3.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Figure 2.3-24. TPBBSW-14 Water Elevations.
2-111