FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-95 Figure 2.3-1. TPGW-1 Water Elevations.
Figure 2.3-2. TPGW-2 Water Elevations.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
FPL-024C-00-BD01 1/4/2016 1/4/2016 FPL-024C
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-96 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-97 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-98 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-99 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-100 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-101 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-102 Figure 2.3-15.
Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-13S TPGW-5S TPGW-7S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-103 Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-9S TPGW-4S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-104 Figure 2.3-17.
Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-3S TPGW-13S TPGW-12S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-105 Figure 2.3-18.
Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
-2.5
-1.5
-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-10S TPGW-11S TPGW-13S TPGW-14S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-106 Figure 2.3-19.
Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-13S TPSWCCS-2B
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-107 Figure 2.3-20.
Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-108 Figure 2.3-21.
Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-11S TPBBSW-3B
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-109 Figure 2.3-22. TPBBSW-10 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-110 Figure 2.3-23. TPBBSW-3 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-111 Figure 2.3-24. TPBBSW-14 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-95 Figure 2.3-1. TPGW-1 Water Elevations.
Figure 2.3-2. TPGW-2 Water Elevations.
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating, Units 3 and 4)
ASLBP #: 15-935-02-LA-BD01 Docket #: 05000250 & 05000251 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
FPL-024C-00-BD01 1/4/2016 1/4/2016 FPL-024C
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-96 Figure 2.3-3. TPGW-3 Water Elevations.
Figure 2.3-4. TPGW-4 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-97 Figure 2.3-5. TPGW-5 Water Elevations.
Figure 2.3-6. TPGW-6 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-98 Figure 2.3-7. TPGW-7 Water Elevations.
Figure 2.3-8. TPGW-8 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-99 Figure 2.3-9. TPGW-9 Water Elevations.
Figure 2.3-10. TPGW-10 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-100 Figure 2.3-11. TPGW-11 Water Elevations.
Figure 2.3-12. TPGW-12 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-101 Figure 2.3-13. TPGW-13 Water Elevations.
Figure 2.3-14. TPGW-14 Water Elevations.
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-102 Figure 2.3-15.
Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-13, TPGW-5 and TPGW-7.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-13S TPGW-5S TPGW-7S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-103 Figure 2.3-16. Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-14, TPGW-9 and TPGW-4.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-14S TPGW-9S TPGW-4S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-104 Figure 2.3-17.
Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-3, TPGW-13, and TPGW-12.
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-3S TPGW-13S TPGW-12S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-105 Figure 2.3-18.
Comparison of Time Series Groundwater Water Elevations across the Landscape at TPGW-10, TPGW-11, TPGW-13, and TPGW-14.
-2.5
-1.5
-0.5 0.5 1.5 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-10S TPGW-11S TPGW-13S TPGW-14S
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-106 Figure 2.3-19.
Comparison of Time Series Groundwater Water Elevations at TPGW-13 and TPSWCCS-2.
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-13S TPSWCCS-2B
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-107 Figure 2.3-20.
Comparison of Time Series Groundwater Water Elevations at TPGW-1 andTPGW-2, and CCS Surface Water Stations TPSWCCS-1, TPSWCCS-3, and TPSWCCS-7.
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-1S TPGW-2S TPSWCCS-1B TPSWCCS-3B TPSWCCS-7B
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-108 Figure 2.3-21.
Comparison of Daily Average Time Series Groundwater Water Elevations in Biscayne Bay Well TPGW-11 and Biscayne Bay Surface Water Station TPBBSW-3.
-2.0
-1.0 0.0 1.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
TPGW-11S TPBBSW-3B
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-109 Figure 2.3-22. TPBBSW-10 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-110 Figure 2.3-23. TPBBSW-3 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)
FPL Turkey Point Annual Post-Uprate Monitoring Report for Units 3 & 4 Uprate Project - August 2014 Section 2 2-111 Figure 2.3-24. TPBBSW-14 Water Elevations.
-3.0
-2.0
-1.0 0.0 1.0 2.0 6/15/10 9/5/10 11/27/10 2/18/11 5/12/11 8/3/11 10/25/11 1/16/12 4/8/12 6/30/12 Water Elevation (ft, NAVD 88)