| {{#Wiki_filter:B/B-UFSAR 9.5-35 REVISION 9 - DECEMBER 2002 TABLE 9.5-1 COMMUNICATION SYSTEMS TURBINE PEDESTAL AREAS LOCATION UNIT 1 Type - Public Address System E-12, K-15 Telephone K-12 Sound Powered Phone E-10 Turbine Building 451 ft UNIT 2 Type - Public Address System E-24 Telephone K-24 Sound Powered (Jack) E-26 Turbine Building 451 ft | | {{#Wiki_filter:B/B-UFSAR 9.5-35 REVISION 9 - DECEMBER 2002 TABLE 9.5-1 COMMUNICATION SYSTEMS |
|
| |
|
| MANUAL EMERGENCY BORATION VALVES UNIT 1 (1CV8439) Type - Public Address System Q-17 Telephone U-17 Sound Powered (Jack) S-17 Aux. Bldg. Mezz. | | TURBINE PEDESTAL AREAS LOCATION UNIT 1 Type - Public Address System E-12, K-15 Telephone K-12 Sound Powered Phone E-10 Turbine Building 451 ft UNIT 2 Type - Public Address System E-24 Telephone K-24 Sound Powered (Jack) E-26 Turbine Building 451 ft |
| 426 ft and 439 ft UNIT 2 (2CV8439) Type - Public Address System U-19 Telephone Q-19, U-19 Sound Powered (Jack) S21 Aux. Bldg. Mezz. | | |
| | MANUAL EMERGENCY BORATION VALVES UNIT 1 (1CV8439) |
| | Type - Public Address System Q-17 Telephone U-17 Sound Powered (Jack) S-17 Aux. Bldg. Mezz. |
| | 426 ft and 439 ft UNIT 2 (2CV8439) |
| | Type - Public Address System U-19 Telephone Q-19, U-19 Sound Powered (Jack) S21 Aux. Bldg. Mezz. |
| 426 ft and 439 ft | | 426 ft and 439 ft |
|
| |
|
| SPENT FUEL POOL AREA Type - Public Address System Y21 Telephone Y21, Y15 Sound Powered (Jack) Y21 Fuel Handling Bldg. 426 ft. DIESEL GENERATORS Type - Unit 1 - A P7 Telephone P7 Sound Powered (Jack) | | SPENT FUEL POOL AREA Type - Public Address System Y21 Telephone Y21, Y15 Sound Powered (Jack) Y21 Fuel Handling Bldg. 426 ft. DIESEL GENERATORS Type - Unit 1 - A P7 Telephone P7 Sound Powered (Jack) |
|
| |
|
| Type - Unit 1 - B N10 Telephone P10 Sound Powered (Jack) | | Type - Unit 1 - B N10 Telephone P10 Sound Powered (Jack) |
| Type - Unit 2 - A N26 Telephone N26 Sound Powered (Jack) | | Type - Unit 2 - A N26 Telephone N26 Sound Powered (Jack) |
| B/B-UFSAR 9.5-36 TABLE 9.5-1 (Cont'd) TURBINE PEDESTAL AREAS LOCATION Type - Unit 2 - B N29 Telephone N29 Sound Powered (Jack) Aux. Bldg. 401 ft AUXILIARY ELECTRICAL EQUIPMENT ROOMS UNIT 1 Type - Telephone P11 Sound Powered (Jack) N11 UNIT 2 Type - Public Address System N23 Sound Powered (Jack) N23 Aux. Bldg. 451 ft 4-kV (ESF) SWITCHGEAR ROOMS UNIT 1 Type - Telephone L6, L8, P7, Sound Powered (Jack) P9, P6, P8 UNIT 2 Type - Telephone P29, P27, L30, Sound Powered (Jack) L28, N28, N26 Aux. Bldg. Mezz. 426 ft & 439 ft RADWASTE EVAPORATOR CONTROL PANEL Type - Public Address System N25 Telephone N25 Sound Powered (Jack) N24 Aux. Bldg. 383 ft | | B/B-UFSAR 9.5-36 TABLE 9.5-1 (Cont'd) |
| | TURBINE PEDESTAL AREAS LOCATION Type - Unit 2 - B N29 Telephone N29 Sound Powered (Jack) |
| | Aux. Bldg. 401 ft AUXILIARY ELECTR ICAL EQUIPMENT ROOMS UNIT 1 Type - Telephone P11 Sound Powered (Jack) |
| | N11 UNIT 2 Type - Public A ddress System N23 Sound Powered (Jack) |
| | N23 Aux. Bldg. 451 ft 4-kV (ESF) SWITCHGEAR ROOMS UNIT 1 Type - Telephone L6, L8, P7, Sound Powered (Jack) P9, P6, P8 UNIT 2 Type - Telephone P29, P27, L30, Sound Powered (Jack) |
| | L28, N28, N26 Aux. Bldg. Mezz. 426 ft & 439 ft RADWASTE EVAPORATOR CONTROL PANEL Type - Public Address System N25 Telephone N25 Sound Powered (Jack) N24 Aux. Bldg. 383 ft |
|
| |
|
| SECONDARY SAMPLE ROOM Type - Public Address System D18 Telephone D18 Turb. Bldg. 401 ft PRIMARY SAMPLE ROOM Type - Public Address System L14 Sound Powered (Jack) M13 Telephone L14 Aux Bldg 401 ft | | SECONDARY SAMPLE ROOM Type - Public Address System D18 Telephone D18 Turb. Bldg. 401 ft PRIMARY SAMPLE ROOM Type - Public Address System L14 Sound Powered (Jack) M13 Telephone L14 Aux Bldg 401 ft |
|
| |
|
| HYDROGEN AND STATOR COOLING PANELS UNIT 1 Type - Public Address System F4 Telephone E4 Sound Powered (Jack) E4 B/B-UFSAR 9.5-37 REVISION 1 - DECEMBER 1989 TABLE 9.5-1 (Cont'd) TURBINE PEDESTAL AREAS LOCATION UNIT 2 Type - Public Address System F32 Telephone E32 Sound Powered (Jack) E32 Turb. Bldg. Mezz. | | HYDROGEN AND STATOR COOLING PANELS UNIT 1 Type - Public A ddress System F4 Telephone E4 Sound Powered (Jack) |
| | E4 B/B-UFSAR 9.5-37 REVISION 1 - DECEMBER 1989 TABLE 9.5-1 (Cont'd) |
| | TURBINE PEDESTAL AREAS LOCATION UNIT 2 Type - Public Address System F32 Telephone E32 Sound Powered (Jack) E32 Turb. Bldg. Mezz. |
| 426 ft | | 426 ft |
|
| |
|
| RELAY HOUSE Type - Public Address System Switchyard Telephone | | RELAY HOUSE Type - Public Address System Switchyard Telephone |
| | |
| | B/B-UFSAR 9.5-38 REVISION 1 - DECEMBER 1989 TABLE 9.5-2 VITAL AREA LIGHTING NORMAL LIGHTING BACKUP LIGHTING 125-VDC LIGHTING REGULAR AC ESS. AND/OR LIGHTING LIGHTING BATTERY PACK Turbine Pedestal Areas Units 1 and 2 Yes No Yes Manual Emergency Boration Valves 1CV8439 and 2CV8439 Yes No No Spent Fuel Pool Areas Yes Yes No Diesel Generators Units 1 and 2 Yes Yes Yes Relay House Yes No No Auxiliary Electrical Equipment Room Units 1 and 2 Yes Yes Yes 4-kV (ESF) Switchgear Room Units 1 and 2 Yes Yes Yes Radwaste Evaporator Control Panel Area Yes Yes Yes Primary Sample Room (401') Yes Yes No Secondary Sample Panel (426') Yes No No H2 and Stator Cooling Panel Units 1 and 2 Yes No 1No |
|
| |
|
| B/B-UFSAR 9.5-38 REVISION 1 - DECEMBER 1989 TABLE 9.5-2 VITAL AREA LIGHTING NORMAL LIGHTING BACKUP LIGHTING 125-VDC LIGHTING REGULAR AC ESS. AND/OR LIGHTING LIGHTING BATTERY PACK Turbine Pedestal Areas Units 1 and 2 Yes No Yes Manual Emergency Boration Valves 1CV8439 and 2CV8439 Yes No No Spent Fuel Pool Areas Yes Yes No Diesel Generators Units 1 and 2 Yes Yes Yes Relay House Yes No No Auxiliary Electrical Equipment Room Units 1 and 2 Yes Yes Yes 4-kV (ESF) Switchgear Room Units 1 and 2 Yes Yes Yes Radwaste Evaporator Control Panel Area Yes Yes Yes Primary Sample Room (401') Yes Yes No Secondary Sample Panel (426') Yes No No H2 and Stator Cooling Panel Units 1 and 2 Yes No 1No 1 Battery pack located within 100 feet.
| | 1 Battery pack located within 100 feet. |
|
| |
|
| B/B-UFSAR REVISION 15 - DECEMBER 2014 Figures 9.1-7c through 9.1-11 have been deleted intentionally. | | B/B-UFSAR REVISION 15 - DECEMBER 2014 Figures 9.1-7c through 9 |
| | .1-11 have been dele ted intentionally. |
|
| |
|
| B/B-UFSAR REVISION 9 - DECEMBER 2002 Figure 9.1-22 has been deleted intentionally. | | B/B-UFSAR REVISION 9 - DECEMBER 2002 Figure 9.1-22 has been deleted inten tionally. |
|
| |
|
| B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.2-1 through 9.2-6 have been deleted intentionally. | | B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.2-1 through 9.2-6 have been deleted intentionally. |
|
| |
|
| B/B-UFSAR REVISION 16 - DECEMBER 2016 Figures 9.2-10 thru 9.2-14 have been deleted intentionally. | | B/B-UFSAR REVISION 16 - DECEMBER 2016 Figures 9.2-10 thru 9.2-14 have been deleted intentionally. |
| B/B-UFSAR REVISION 9 - DECEMBER 2002 | | B/B-UFSAR REVISION 9 - DECEMBER 2002 |
|
| |
|
| Figures 9.2-15 through 9.2-27a have been deleted intentionally. | | Figures 9.2-15 through 9.2-27a have been deleted intentionally. |
|
| |
|
| B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.3-1 through 9.3-9 have been deleted intentionally. | | B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.3-1 through 9.3-9 have been de leted intentionally. |
|
| |
|
| B/B-UFSAR REVISION 9 - DECEMBER 2002 | | B/B-UFSAR REVISION 9 - DECEMBER 2002 |
|
| |
|
| Figures 9.4-1 through 9.4-14 have been deleted intentionally. | | Figures 9.4-1 through 9.4-14 have been deleted intentionally. |
| B/B-UFSAR REVISION 9 - DECEMBER 2002 | | B/B-UFSAR REVISION 9 - DECEMBER 2002 |
|
| |
|
| Figures 9.5-1 have been deleted intentionally. | | Figures 9.5-1 ha ve been deleted intentionally. |
|
| |
|
| B/B-UFSAR REVISION 9 - DECEMBER 2002 | | B/B-UFSAR REVISION 9 - DECEMBER 2002 |
|
| |
|
| Figure 9.5-3 has been deleted intentionally. | | Figure 9.5-3 has been deleted intentionally. |
|
| |
|
| B/B-UFSAR REVISION 9 - DECEMBER 2002 | | B/B-UFSAR REVISION 9 - DECEMBER 2002 |
|
| |
|
| Figures 9.5-5 through 9.5-7 have been deleted intentionally.}} | | Figures 9.5-5 through 9.5-7 have been delete d intentionally.}} |
|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML21137A2212021-05-17017 May 2021 Byron/Braidwood Stations - Amendment 29 to Fire Protection Report, Chapter 2.3, Figures, Part 2 of 2-Redacted ML21137A2382021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features-Redacted ML21137A2462021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 8, Electric Power-Redacted ML21137A2512021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection-Redacted ML21137A2532021-05-17017 May 2021 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses-Redacted ML21008A3972020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix F, Updated Final Safety Analysis Report Supplement (License Renewal) ML21008A3802020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report ML21008A3862020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix D, Computer Programs ML21008A3872020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix E, Requirements Resulting from TMI-2 Accident ML21008A3882020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Plant Description ML21008A3892020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML21008A3922020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML21008A3942020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML21008A3992020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix B, Construction Material Standards and Quality Control Procedures ML21008A4012020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML21008A4022020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML21008A4042020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Cover and Page Index ML21008A4052020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML21008A4062020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML21008A4082020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21008A4092020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix C, Deleted ML21008A4102020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Appendix a, Application of NRC Regulatory Guides ML21008A4112020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML21008A4032020-12-17017 December 2020 Byron/Braidwood Stations - Revision 18 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML19170A3472019-06-20020 June 2019 Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis ML19170A0072019-06-19019 June 2019 Redacted Revision 17 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML19170A0122019-06-19019 June 2019 Redacted Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 - Revision 17 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML19170A3362019-06-19019 June 2019 Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML19170A3872019-06-19019 June 2019 Redacted Braidwood Station, Units 1 & 2 and Byron Station, Unit 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML19170A3842019-06-19019 June 2019 Revision 17 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML19169A1132019-06-18018 June 2019 Redacted Braidwood Station, Units 1 & 2 and Byron Station, Units 1 & 2, Revision 17 to Updated Final Safety Analysis Report, Appendix E - Requirements Resulting from TMI-2 Accident (Public Version Pages 1-173 and 258-277) RS-17-032, Response to Request for Additional Information Regarding the License Amendment Request to Utilize the TORMIS Computer Code Methodology2017-03-20020 March 2017 Response to Request for Additional Information Regarding the License Amendment Request to Utilize the TORMIS Computer Code Methodology ML17061A1252017-02-0808 February 2017 B/B - FSAR Question 010.4 ML17061A1262017-02-0808 February 2017 B/B-UFSAR 3.6 Protection Against Dynamic Effects Associated with the Postulated Break of Piping ML17061A1242017-02-0808 February 2017 B/B - UFSAR Attachment C3.6 Main Steamline Break in Main Steam Tunnel ML17040A3022017-02-0808 February 2017 OEDO-17-00104 - Barry Quigley, Citizen, Email 2.206 Petition for Byron and Braidwood Units 1 & 2 High Energy Line Break ML17040A3032017-02-0808 February 2017 OEDO-17-00104 - Barry Quigley, Citizen, Email 2.206 Petition for Byron and Braidwood Units 1 & 2 High Energy Line Break ML17040A3042017-02-0808 February 2017 OEDO-17-00104 - Barry Quigley, Citizen, Email 2.206 Petition for Byron and Braidwood Units 1 & 2 High Energy Line Break ML17034A3552017-02-0202 February 2017 Braidwood/Byron UFSAR Excerpt ML17034A1812017-02-0202 February 2017 Braidwood/Byron UFSAR Excerpt RS-16-248, Redacted Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix E - Requirements Resulting from TMI-2 Accident2016-12-15015 December 2016 Redacted Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix E - Requirements Resulting from TMI-2 Accident ML17086A5952016-12-15015 December 2016 Redacted Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 8, Electric Power2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 8, Electric Power RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls RS-16-248, Byron/Braidwood Nuclear Stations, Submittal of Revision 16 to Updated Final Safety Analysis Report and Updated Fire Protection Report (Fpr), Amendment 272016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Submittal of Revision 16 to Updated Final Safety Analysis Report and Updated Fire Protection Report (Fpr), Amendment 27 RS-16-248, Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory Guides2016-12-15015 December 2016 Byron/Braidwood Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Appendix a - Application of NRC Regulatory Guides 2021-05-17
[Table view] |
Text
B/B-UFSAR 9.5-35 REVISION 9 - DECEMBER 2002 TABLE 9.5-1 COMMUNICATION SYSTEMS
TURBINE PEDESTAL AREAS LOCATION UNIT 1 Type - Public Address System E-12, K-15 Telephone K-12 Sound Powered Phone E-10 Turbine Building 451 ft UNIT 2 Type - Public Address System E-24 Telephone K-24 Sound Powered (Jack) E-26 Turbine Building 451 ft
MANUAL EMERGENCY BORATION VALVES UNIT 1 (1CV8439)
Type - Public Address System Q-17 Telephone U-17 Sound Powered (Jack) S-17 Aux. Bldg. Mezz.
426 ft and 439 ft UNIT 2 (2CV8439)
Type - Public Address System U-19 Telephone Q-19, U-19 Sound Powered (Jack) S21 Aux. Bldg. Mezz.
426 ft and 439 ft
SPENT FUEL POOL AREA Type - Public Address System Y21 Telephone Y21, Y15 Sound Powered (Jack) Y21 Fuel Handling Bldg. 426 ft. DIESEL GENERATORS Type - Unit 1 - A P7 Telephone P7 Sound Powered (Jack)
Type - Unit 1 - B N10 Telephone P10 Sound Powered (Jack)
Type - Unit 2 - A N26 Telephone N26 Sound Powered (Jack)
B/B-UFSAR 9.5-36 TABLE 9.5-1 (Cont'd)
TURBINE PEDESTAL AREAS LOCATION Type - Unit 2 - B N29 Telephone N29 Sound Powered (Jack)
Aux. Bldg. 401 ft AUXILIARY ELECTR ICAL EQUIPMENT ROOMS UNIT 1 Type - Telephone P11 Sound Powered (Jack)
N11 UNIT 2 Type - Public A ddress System N23 Sound Powered (Jack)
N23 Aux. Bldg. 451 ft 4-kV (ESF) SWITCHGEAR ROOMS UNIT 1 Type - Telephone L6, L8, P7, Sound Powered (Jack) P9, P6, P8 UNIT 2 Type - Telephone P29, P27, L30, Sound Powered (Jack)
L28, N28, N26 Aux. Bldg. Mezz. 426 ft & 439 ft RADWASTE EVAPORATOR CONTROL PANEL Type - Public Address System N25 Telephone N25 Sound Powered (Jack) N24 Aux. Bldg. 383 ft
SECONDARY SAMPLE ROOM Type - Public Address System D18 Telephone D18 Turb. Bldg. 401 ft PRIMARY SAMPLE ROOM Type - Public Address System L14 Sound Powered (Jack) M13 Telephone L14 Aux Bldg 401 ft
HYDROGEN AND STATOR COOLING PANELS UNIT 1 Type - Public A ddress System F4 Telephone E4 Sound Powered (Jack)
E4 B/B-UFSAR 9.5-37 REVISION 1 - DECEMBER 1989 TABLE 9.5-1 (Cont'd)
TURBINE PEDESTAL AREAS LOCATION UNIT 2 Type - Public Address System F32 Telephone E32 Sound Powered (Jack) E32 Turb. Bldg. Mezz.
426 ft
RELAY HOUSE Type - Public Address System Switchyard Telephone
B/B-UFSAR 9.5-38 REVISION 1 - DECEMBER 1989 TABLE 9.5-2 VITAL AREA LIGHTING NORMAL LIGHTING BACKUP LIGHTING 125-VDC LIGHTING REGULAR AC ESS. AND/OR LIGHTING LIGHTING BATTERY PACK Turbine Pedestal Areas Units 1 and 2 Yes No Yes Manual Emergency Boration Valves 1CV8439 and 2CV8439 Yes No No Spent Fuel Pool Areas Yes Yes No Diesel Generators Units 1 and 2 Yes Yes Yes Relay House Yes No No Auxiliary Electrical Equipment Room Units 1 and 2 Yes Yes Yes 4-kV (ESF) Switchgear Room Units 1 and 2 Yes Yes Yes Radwaste Evaporator Control Panel Area Yes Yes Yes Primary Sample Room (401') Yes Yes No Secondary Sample Panel (426') Yes No No H2 and Stator Cooling Panel Units 1 and 2 Yes No 1No
1 Battery pack located within 100 feet.
B/B-UFSAR REVISION 15 - DECEMBER 2014 Figures 9.1-7c through 9
.1-11 have been dele ted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002 Figure 9.1-22 has been deleted inten tionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.2-1 through 9.2-6 have been deleted intentionally.
B/B-UFSAR REVISION 16 - DECEMBER 2016 Figures 9.2-10 thru 9.2-14 have been deleted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002
Figures 9.2-15 through 9.2-27a have been deleted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002 Figures 9.3-1 through 9.3-9 have been de leted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002
Figures 9.4-1 through 9.4-14 have been deleted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002
Figures 9.5-1 ha ve been deleted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002
Figure 9.5-3 has been deleted intentionally.
B/B-UFSAR REVISION 9 - DECEMBER 2002
Figures 9.5-5 through 9.5-7 have been delete d intentionally.