ENS 58069: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 22: | Line 22: | ||
This actuation was not in response to an actual engineered safety feature (ESF) condition and does not meet the criteria for a valid ESF actuation. This event is being reported as a 60-day report in accordance with 10 CFR 50.73(a)(1) for an invalid actuation of the EFW System. | This actuation was not in response to an actual engineered safety feature (ESF) condition and does not meet the criteria for a valid ESF actuation. This event is being reported as a 60-day report in accordance with 10 CFR 50.73(a)(1) for an invalid actuation of the EFW System. | ||
The NRC Senior Resident Inspector has been notified. | The NRC Senior Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251205en.html#en58069 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 1 | | Unit = 1 | ||
Latest revision as of 07:20, 5 December 2025
| Where | |
|---|---|
| Summer South Carolina (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
| Time - Person (Reporting Time:+1460.63 h60.86 days <br />8.694 weeks <br />2.001 months <br />) | |
| Opened: | Justin Bouknight 12:26 Dec 3, 2025 |
| NRC Officer: | Karen Cotton |
| Last Updated: | Dec 3, 2025 |
| 58069 - NRC Website
| |