ML12124A269: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[CP-201200331, Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)]]
| number = ML12124A269
| issue date = 04/16/2012
| title = Comanche Peak, Unit 2, Clarification to Relief Request No. A-2 for the Unit 2 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Geometric Limitations (Second Interval Start Date: August 03, 2004)
| author name = Flores R, Madden F W
| author affiliation = Luminant Power, Luminant Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000446
| license number =
| contact person =
| case reference number = CP-201200331, TXX-12056
| document type = Letter
| page count = 2
}}

Latest revision as of 09:41, 12 April 2019