{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward x
{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward x
March 30, 2023
March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch


Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch Overall Plan & Path Forward
2 Completed Tabletops at facilities Dec 2022 Conduct public meeting Workshop with Tabletop sites/Industry Stakeholders Mar 2023 Developed Working Group recommendations for near-term path forward Feb 2023 Obtained Alignment with NRC Mgt. on PCC Proposal Feb/Mar 2023 Overall Plan & Path Forward Develop near-term oversight guidance Summer 2023 Develop Enf./SDP strategy and Regional Panel Guidance Fall 2023 Issue Public Report on Tabletops April/May 2023 Gather feedback from near-term oversight, update as necessary 2024-2026 Develop long-term oversight process 2026


Completed Obtained Issue Public Develop Enf./SDP Develop Tabletops Alignment with Report on strategy and long-term at facilities NRC Mgt. on Tabletops Regional Panel oversight process Dec 2022PCC Proposal April/May 2023 Guidance 2026 Feb/Mar 2023 Fall 2023
3 Proposal:
 
Developed Conduct public Gather feedback Working Group meeting Develop from near-term recommendations Workshop with near-term oversight, update as for near-term Tabletop oversight necessary path forward sites/Industry guidance 2024-2026 Feb 2023 Stakeholders Summer 2023 Mar 2023
 
2 Proposal:
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.


3 Evaluated Options
4 Evaluated Options Four options considered:
 
Four options considered:
* Option 1 - Comprehensive Engineering Team Inspection (CETI)
* Option 1 - Comprehensive Engineering Team Inspection (CETI)
(Internal Events, Flooding & Other Approved Hazards)
(Internal Events, Flooding & Other Approved Hazards)
Line 40: Line 34:
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).


4 WGs Recommended Inspection Enhancement
5 WGs Recommended Inspection Enhancement
* Step 1 (Near-term): OpE Smart Sample (OpESS+)
* Step 1 (Near-term): OpE Smart Sample (OpESS+)
PROPOSED Inspection Procedures:
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) 71111.13, Maintenance Risk Assessments and Emergent Work Control 71111.18, Plant Modifications 71151, Performance Indicator Verification 71152, Problem Identification and Resolution (PI&R) 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
Step 1.A: Evolve/Update OpESS+ as needed.


.PROPOSED Inspection Procedures:
6 OpESS+
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD)
SFCP NFPA 805 RICT 50.69 Proposed OpESS+
* 71111.13, Maintenance Risk Assessments and Emergent W ork Control
applicable and flexible to the Risk-Informed Initiatives in place.
* 71111.18, Plant Modifications
Balanced and graded approach.
* 71151, Performance Indicator Verification
* 71152, Problem Identification and Resolution (PI&R)
* 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
* Step 1.A: Evolve/Update OpESS+ as needed.
 
5 Proposed OpESS+
applicable and flexible to SFCP the Risk-InformedBalanced and graded approach.
Initiatives in place.


50.69 OpESS+ NFPA 805
7 Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
 
RIC T
 
6 Near-term Actions - OpESS
 
Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
Obtain and address Industry and Public Feedback (Ongoing)
Obtain and address Industry and Public Feedback (Ongoing)
Internal Communication/Awareness (Ongoing)
Internal Communication/Awareness (Ongoing)
* Training and Communication with Inspectors (Ongoing)
Training and Communication with Inspectors (Ongoing)
Finalize OpESS guidance (Ongoing)
Finalize OpESS guidance (Ongoing)
Enforcement / Significance Determination Process
Enforcement / Significance Determination Process
Line 72: Line 55:
* More-than-Minor/Green Threshold criteria (Ongoing)
* More-than-Minor/Green Threshold criteria (Ongoing)


7 Long-term Actions - ROP Update
8 Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
 
Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
Update SDP/Enforcement of PCC issues
Update SDP/Enforcement of PCC issues


8 Planned Outreach Efforts
9 Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry ROP Bi-Monthly public meetings Public workshops Industry meetings/interactions
 
Issue publicly available report on insights from Tabletops
 
Continue to engage with public and industry
* R O P B i-Monthly public meetings
* Public workshops
* Industry meetings/interactions
 
9 Questions


10}}
10 Questions}}

Latest revision as of 07:40, 27 November 2024

Pcc - Workshop - Path Forward - March 30, 2023 - Final
ML23088A076
Person / Time
Issue date: 03/30/2023
From: Lundy Pressley
NRC/NRR/DRA/APOB
To:
References
Download: ML23088A076 (1)


Text

PRA Configuration Control Workshop Proposed Path Forward x

March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch

2 Completed Tabletops at facilities Dec 2022 Conduct public meeting Workshop with Tabletop sites/Industry Stakeholders Mar 2023 Developed Working Group recommendations for near-term path forward Feb 2023 Obtained Alignment with NRC Mgt. on PCC Proposal Feb/Mar 2023 Overall Plan & Path Forward Develop near-term oversight guidance Summer 2023 Develop Enf./SDP strategy and Regional Panel Guidance Fall 2023 Issue Public Report on Tabletops April/May 2023 Gather feedback from near-term oversight, update as necessary 2024-2026 Develop long-term oversight process 2026

3 Proposal:

  • Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
  • Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
  • The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.

4 Evaluated Options Four options considered:

  • Option 1 - Comprehensive Engineering Team Inspection (CETI)

(Internal Events, Flooding & Other Approved Hazards)

Focused Engineering Inspection (FEI) / (71111.21N)

  • Option 2 - Resident Inspector Baseline Procedures. All hazards.
  • Option 4 - OpE Smart Sample (OpESS)

Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).

5 WGs Recommended Inspection Enhancement

  • Step 1 (Near-term): OpE Smart Sample (OpESS+)

PROPOSED Inspection Procedures:

71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) 71111.13, Maintenance Risk Assessments and Emergent Work Control 71111.18, Plant Modifications 71151, Performance Indicator Verification 71152, Problem Identification and Resolution (PI&R) 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)

Step 1.A: Evolve/Update OpESS+ as needed.

6 OpESS+

SFCP NFPA 805 RICT 50.69 Proposed OpESS+

applicable and flexible to the Risk-Informed Initiatives in place.

Balanced and graded approach.

7 Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)

Obtain and address Industry and Public Feedback (Ongoing)

Internal Communication/Awareness (Ongoing)

Training and Communication with Inspectors (Ongoing)

Finalize OpESS guidance (Ongoing)

Enforcement / Significance Determination Process

  • Initiate Cross Regional Panel Process (Ongoing)
  • Develop Screening Guidance (Ongoing)
  • More-than-Minor/Green Threshold criteria (Ongoing)

8 Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)

Update SDP/Enforcement of PCC issues

9 Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry ROP Bi-Monthly public meetings Public workshops Industry meetings/interactions

10 Questions