ENS 57174: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 15: | Line 15: | ||
| NRC officer = Josue Ramirez | | NRC officer = Josue Ramirez | ||
| event date = 06/14/2024 11:00 CDT | | event date = 06/14/2024 11:00 CDT | ||
| last update date = 06/ | | last update date = 06/25/2024 | ||
| title = Technical Specification Reportable Occurrence | | title = Technical Specification Reportable Occurrence | ||
| event text = The following information was provided by the licensee via email: | | event text = The following information was provided by the licensee via email: | ||
Line 26: | Line 26: | ||
The reactor was not operating at the time of the event. | The reactor was not operating at the time of the event. | ||
NRC Project Manager has been notified. | NRC Project Manager has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/ | * * * UPDATE ON 6/25/2024 AT 1537 EDT FROM JERE JENKINS TO SAMUEL COLVARD * * * | ||
The following information was provided by the licensee via email: | |||
During the Technical Specification (TS) 4.1.5.2 required inspection of the entire core resulting from the finding detailed above, an additional element [SN 11391] failed to pass the inspection for transverse bend on Friday, June 21, 2024, requiring that element to be declared as 'damaged' in accordance with TS 3.1.5.2 (same as above). As this meets the definition of a 'reportable occurrence' under the definitions in TS 1.3. In accordance with the requirements of TS 6.6.2 and 6.7.2, we have hereby notified the HOO [Headquarters Operations Officer] by a revision or update of the previous report of damaged fuel, Event Number 57174. | |||
Additional details: | |||
1. Visual inspection of the pin prior to placement in the test rig did not indicate any obvious degradation that would be exceptional for a pin with seventeen years of burnup history. | |||
2. There have been no indications of cladding failure on routine primary coolant analyses. | |||
3. The pin (SN 11391) has been removed from service and will be replaced with a spare element. | |||
4. We have also informed our project managers. | |||
5. The inspection of the remaining uninspected elements is almost complete, as of this writing no further "damaged" elements have been identified. | |||
Notified NRR PM (Boyle), NPR Event Coordinator (Waugh) | |||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240626en.html#en57174 | |||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 06:20, 26 June 2024
Where | |
---|---|
Texas A&Amp;M University (Tamn) College Station, Texas (NRC Region 0) | |
License number: | R-83 |
Reporting | |
Non | |
Time - Person (Reporting Time:+-0.42 h-0.0175 days <br />-0.0025 weeks <br />-5.75316e-4 months <br />) | |
Opened: | Jere Jenkins 15:35 Jun 14, 2024 |
NRC Officer: | Josue Ramirez |
Last Updated: | Jun 25, 2024 |
57174 - NRC Website | |