TXX-6773, Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
{{#Wiki_filter:.
{{#Wiki_filter:.
(-
(-
e l                                                                           ==
e l
Log # TXX-6773 1                                                                           -                        2               File #~10068
 
                                                                            .-T                     C'
==
                                                                                                    ,_                      10010 clo 1UELECTRIC g                                   ,
Log # TXX-6773 1
wmism c. counsit Executive Vice President September 23, 1987 i'
2 File #~10068
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C. 20555
.-T C'
10010 clo 1UELECTRIC g
wmism c. counsit September 23, 1987 Executive Vice President i'
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C.
20555 I-


==SUBJECT:==
==SUBJECT:==
  'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)
  'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)
I-                                        DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA
DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA
                ' Gentlemen:
' Gentlemen:
Attached are 15 copies of the {{letter dated|date=September 23, 1987|text=letter dated September 23, 1987}},;from W. G.
Attached are 15 copies of the {{letter dated|date=September 23, 1987|text=letter dated September 23, 1987}},;from W. G.
!                  Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.
Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.
The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.
The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.
L Very truly yours,
L Very truly yours, 1d W. G. Counsil By:
                                                                                                                    ,        1d W. G. Counsil By:   .s_- r b,      #  '
b,
G. S. Keeley       &                      i Manager, Nuclear Lics ing JDS/mgt Attachmen; c-       Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b 8709290233 870923                                                                                           /
.s_-
PDR A
r G. S. Keeley i
ADOCK 05000445 PDR I jp l
Manager, Nuclear Lics ing JDS/mgt Attachmen; c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b
400 North Olive Street LB 8I Dallas. Texas 75201                                             l
/
8709290233 870923 PDR ADOCK 05000445 I
A PDR jp l
400 North Olive Street LB 8I Dallas. Texas 75201 l


4 M
4 M
lllllllll' ':lllllllll                 Log # TXX-6772
lllllllll' ':lllllllll Log # TXX-6772 File # 2260 10068 clo it/ ELECTRIC
:-                :                  File # 2260
["j' [l"j, September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.
:-                                            10068 clo it/ ELECTRIC
Suite 390 Walnut Creek, CA 94596
["j' [l"j,                                                                                                             September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.
Suite 390 Walnut Creek, CA 94596 i


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA
TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA


==Dear Ms. Williams:==
==Dear Ms. Williams:==
Enclosed please find three copies of the following documents:
Enclosed please find three copies of the following documents:
Impell Document                                                               Related Generic Issue Calculation B-04 Rev. O                                                                   Issue 4 B Calculation M-12 Rev. 3                                                                     Issue 7 Calculation M-27 Rev. 2                                                                     Issue 19 Calculation M-39 Rev. 2                                                                     Issue 21 D Calculation M-59 Rev. 2                                                                   Issue 16 G Calculation M-65 Rev. 2                                                                   Issue 9 Position Paper IM-P-011,                                                                   Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012,                                                                   Issue 26 B
Impell Document Related Generic Issue Calculation B-04 Rev. O Issue 4 B Calculation M-12 Rev. 3 Issue 7 Calculation M-27 Rev. 2 Issue 19 Calculation M-39 Rev. 2 Issue 21 D Calculation M-59 Rev. 2 Issue 16 G Calculation M-65 Rev. 2 Issue 9 Position Paper IM-P-011, Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012, Issue 26 B
                                                                            " Stress Evaluation of Angles" Position Paper IM-P-013,                                                                   Issue 18
" Stress Evaluation of Angles" Position Paper IM-P-013, Issue 18
                                                                            " Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201
" Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201
____ _ _ _ _ _____                                                                  - - - . - - - - - - - - - - - - - - - - - - -          - -- ------ -                      -              ~
~


D t
D t
Calculation M-15 Rev. 3                                   Issue 26 B Calculation M-28 Rev. 3                                       *
Calculation M-15 Rev. 3 Issue 26 B Calculation M-28 Rev. 3
                                                                                  *This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)
*This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)
Very truly yours, W. G. Counsil GY
Very truly yours, GY W. G. Counsil l
                                                                                                                                                        ^
^
l
By:
'                                                                                                                                          By:             z .
z.
G. S. Keeley &     -/-
G. S. Keeley &
-/-
Manager, Nuclear Lfgsnsing JDS/mgt Enclosures
Manager, Nuclear Lfgsnsing JDS/mgt Enclosures
_ _ _ _ _ _ _ _ _ _ - - - - _ _ _ . _ _ - . _ _ - - - _ _ .                                            - - -  - - ~ ~ ~ ~ ' - ' ~ ~ ~   '~}}
- ~ ~ ~ ~ ' - ' ~ ~ ~
'~}}

Latest revision as of 05:45, 3 December 2024

Forwards Wg Counsil 870923 Cover Ltr & Impell Calculations & Position Papers,Including Rev 0 to IM-P-011, Unbraced Lengths Used to Evaluate Lateral Torsional Buckling of Trapeze Support Post Members, as Requested by Cygna
ML20235F610
Person / Time
Site: Comanche Peak  
Issue date: 09/23/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235F613 List:
References
TXX-6773, NUDOCS 8709290233
Download: ML20235F610 (3)


Text

.

(-

e l

==

Log # TXX-6773 1

2 File #~10068

.-T C'

10010 clo 1UELECTRIC g

wmism c. counsit September 23, 1987 Executive Vice President i'

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.'C.

20555 I-

SUBJECT:

'COMANCllE PEAVs STEAM ELECTRIC STATION.(CPSES)

DOCKET N05. 50-445 AND 50-446 DOCUMENTS REQUESTED BY CYGNA

' Gentlemen:

Attached are 15 copies of the letter dated September 23, 1987,;from W. G.

Counsil to N. II. Williams (with enclosures), transmitting information requested by CYGNA.

The Atomic Safety and Licensing Board will be notified of the transmittal by a separate letter from our attorney.

L Very truly yours, 1d W. G. Counsil By:

b,

.s_-

r G. S. Keeley i

Manager, Nuclear Lics ing JDS/mgt Attachmen; c-Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) b

/

8709290233 870923 PDR ADOCK 05000445 I

A PDR jp l

400 North Olive Street LB 8I Dallas. Texas 75201 l

4 M

lllllllll' ':lllllllll Log # TXX-6772 File # 2260 10068 clo it/ ELECTRIC

["j' [l"j, September 23, 1987 CYGNA Energy Services AlTN: Ms. N. H. Williams, Project Manager Comanche Peak Project 2121 N. California Blvd.

Suite 390 Walnut Creek, CA 94596

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) i TRANSMITTAL OF DOCUMENTS REQUESTED BY CYGNA

Dear Ms. Williams:

Enclosed please find three copies of the following documents:

Impell Document Related Generic Issue Calculation B-04 Rev. O Issue 4 B Calculation M-12 Rev. 3 Issue 7 Calculation M-27 Rev. 2 Issue 19 Calculation M-39 Rev. 2 Issue 21 D Calculation M-59 Rev. 2 Issue 16 G Calculation M-65 Rev. 2 Issue 9 Position Paper IM-P-011, Issue 14 B "Unbraced Lengths Used to Evaluate Buckling of Trapeze Support Post Members" Position Paper IM-P-012, Issue 26 B

" Stress Evaluation of Angles" Position Paper IM-P-013, Issue 18

" Justification for Use of Rigid Clamp Stiffnesses" 400 North Ohve Street LB 81 Dntlas. Tens 75201

~

D t

Calculation M-15 Rev. 3 Issue 26 B Calculation M-28 Rev. 3

  • This document was requested by CYGNA during an audit at the Impell office in Walnut Creek. (8/4/87 - 8/6/87)

Very truly yours, GY W. G. Counsil l

^

By:

z.

G. S. Keeley &

-/-

Manager, Nuclear Lfgsnsing JDS/mgt Enclosures

- ~ ~ ~ ~ ' - ' ~ ~ ~

'~