TXX-6789, Advises That Completion Date for Environ Qualification Verification Program Revised to Be No Later than 880301,per Response to App B,Item I.B.5 of Enforcement Action EA-86-009: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:_ ___ _ -
{{#Wiki_filter:_ ___ _ -
9                           Log #.TXX-6789
9 Log #.TXX-6789 Fi1e # 10118
                                                                -_.    .--                        Fi1e # 10118
=
                                                                =       =                         Ref. # 10CFR2.201 nlELECTRIC September 30, 1987
=
          . William G. Counsil Executive Vice hesident U. S. Nuclear Regulatory Commission ATTN:       Document Control Desk Washington, DC 20555
Ref. # 10CFR2.201 nlELECTRIC September 30, 1987
. William G. Counsil Executive Vice hesident U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Line 33: Line 35:
The completion of the Unit 1 EQ Verification Program is hereby revised to be no later than March 1, 1988.
The completion of the Unit 1 EQ Verification Program is hereby revised to be no later than March 1, 1988.
Very truly yours, W
Very truly yours, W
W. G. Counsil                   i
W. G. Counsil i
                        $[3kOOgg [                   D                                                         /
$[3kOOgg [
A                                                           By , ,
D
G. S. Keeley Manager, Nuclear     ensing c - Mr. R. D. Martin, Region IV
/
                                    .                                                                                    i ResidentInspectors,CPSES(3) o/
A By,,
                                              .soo nns ouve senvi   a si   vanas. rexas mot                           Il0
G. S. Keeley Manager, Nuclear ensing c - Mr. R. D. Martin, Region IV i
                                                                                                                          ,}}
ResidentInspectors,CPSES(3) o/
Il0
.soo nns ouve senvi a si vanas. rexas mot
,}}

Latest revision as of 04:59, 3 December 2024

Advises That Completion Date for Environ Qualification Verification Program Revised to Be No Later than 880301,per Response to App B,Item I.B.5 of Enforcement Action EA-86-009
ML20235L570
Person / Time
Site: Comanche Peak  
Issue date: 09/30/1987
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
EA-86-009, EA-86-9, TXX-6789, NUDOCS 8710050516
Download: ML20235L570 (1)


Text

_ ___ _ -

9 Log #.TXX-6789 Fi1e # 10118

=

=

Ref. # 10CFR2.201 nlELECTRIC September 30, 1987

. William G. Counsil Executive Vice hesident U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES).

DOCKET NOS. 50-445 AND 50-446 ENFORCEMENT ACTION (EA) NO. 86-09, APPENDIX B, ITEM I.B.5

REFERENCE:

(1) TUGCo Letter TXX-4946 from W. G. Counsil to J. M. Taylor dated August 4,1986 (2) TV Electric Letter TXX-6262 from W. G. Counsil to the NRC dated February 27, 1987 (3) TV Electric Letter TXX-6477 from W. G. Counsil to the NRC dated May 29, 1987 Gentlemen:

Reference (3) provided an update to a portion of our response to EA 86-09, Appendix B, Item I.B.5, in which it was stated that the Environmental Qualification (EQ) Verification Program for Unit I would be completed by October 1,1987. We have found it necessary to redefine the environment in a significant number of plant areas and our effort has increased accordingly.

The completion of the Unit 1 EQ Verification Program is hereby revised to be no later than March 1, 1988.

Very truly yours, W

W. G. Counsil i

$[3kOOgg [

D

/

A By,,

G. S. Keeley Manager, Nuclear ensing c - Mr. R. D. Martin, Region IV i

ResidentInspectors,CPSES(3) o/

Il0

.soo nns ouve senvi a si vanas. rexas mot

,