VIltGINIA EI.ncraic Ann Powen COMPANY. | |||
HIcunown, VIMUINIA 23261 1 | HIcunown, VIMUINIA 23261 1 | ||
H.H.LetAmmuno JW'""l::,"L. | H.H.LetAmmuno JW'""l::,"L. | ||
l lir. Harold R. Denton Serial No. | |||
027 Office of Nuclear Reactor Regulation PSE&C/RRC Attention: Mr. Stephen A. Yarga, Chief Operating Reactors Branch No.1 Docket llos. | |||
50-338 Division of Licensing 50-339 U. S. Iluclear Regulatory Cor.nission License Nos. NPF-4 Washington, D. C. | |||
20555 NPF-7 | |||
==Dear fir. Denton:== | ==Dear fir. Denton:== | ||
REQUEST FOR ADDITIONAL INFORf!ATION ENVIRONfENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT NORTH ANNA POWER STATION UNITS 1 AND 2 In a {{letter dated|date=January 12, 1982|text=letter dated January 12, 1982}}, the NRC requested that Yepco supply copics of the docuacntation referenced in the I.E. Bulletin 79-01B and NUREG 0588 90 Day Review to the Franklin Research Center. | |||
REQUEST FOR ADDITIONAL INFORf!ATION ENVIRONfENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT NORTH ANNA POWER STATION UNITS 1 AND 2 In a {{letter dated|date=January 12, 1982|text=letter dated January 12, 1982}}, the NRC requested that Yepco supply copics of the docuacntation referenced in the I.E. Bulletin 79-01B and NUREG 0588 90 Day Review to the Franklin Research Center. In response to this request Vepco is supplying in separate correspondence to Franklin Research Center (dated 6/25/82) copies of Qualification Docunentation Review (QDR) packages. These documents are intended to provide'a couplete record of the Vepco/ Gilbert Associates review of the equipment listed on the equipnent qualification "aaster list". These packages will contain all the necessary docuuentation to support the qualification of the equipaent for which a particular QDR was issued. | In response to this request Vepco is supplying in separate correspondence to Franklin Research Center (dated 6/25/82) copies of Qualification Docunentation Review (QDR) packages. These documents are intended to provide'a couplete record of the Vepco/ Gilbert Associates review of the equipment listed on the equipnent qualification "aaster list". These packages will contain all the necessary docuuentation to support the qualification of the equipaent for which a particular QDR was issued. | ||
It is our opinion that the review of qualification of itens listed on the naster list should be based on information contained in the QDRs r5ther than on isolated test reports or correspondence. However, some references contained in the I.E. Bulletin 79-01B 90 Day Review and flVREG 0588 90 Day Revieu were not required for qualification of equipment or for other reasons were not used to support the findings of the qualification review. | |||
Attacinents 1 and 2 provide a listing of the references requested and the status of these references with regard to this submittal. | Attacinents 1 and 2 provide a listing of the references requested and the status of these references with regard to this submittal. | ||
The document support requested in Section A, "FRC Review of the Licensee's 90 Day Response to the NRC EEQ SER," of the Franklin Research Center attachuent to your letter of January 12, 1982 is being forwarded under i | The document support requested in Section A, "FRC Review of the Licensee's 90 Day Response to the NRC EEQ SER," of the Franklin Research Center attachuent to your letter of January 12, 1982 is being forwarded under i | ||
separate cover to the Franklin Research Center (FRC). A copy of the tranmittal letter util be sent to you. | |||
l OYS 8207010183 820625 DRADOCK05000g | |||
Vinosw A Es.tctnIC AND roWEN COMPANY 70 lr. herold R. Denton The document support "FRC Review of installed Till Action Plan Iteas", | |||
requested in Section B of the FRC attachaent to your letter of January 12, 1982 will be sent upon completion no later than July 26, 1982. | requested in Section B of the FRC attachaent to your letter of January 12, 1982 will be sent upon completion no later than July 26, 1982. | ||
We are available at your earliest convenience should additional | We are available at your earliest convenience should additional information be required. | ||
Very truly yours, | Very truly yours, b-R. H. Leasburg Attachaents RRC:cdk cc: fir. R. C. DeYoung, Director llRC Office of Inspection and Enforcement Division of Reactor Operations Inspection liashington, D. C. | ||
b- | 20555 (8 copies w/attachaents) fir. Zoltan R. Rosztoczy, Branch Chief IIRC Equipaent Qualification Branch Division of Engineering Washington, D. C. | ||
R. H. Leasburg Attachaents RRC:cdk cc: fir. R. C. DeYoung, Director llRC Office of Inspection and Enforcement Division of Reactor Operations Inspection liashington, D. C. 20555 | 20555 (1 copy w/attachaents) fir. Jaacs P. O'Reilly, Regional Adainistrator Region II 101 liarietta Street, Suite 3100 Atlanta, Georgia 30303 (1 copy w/attachaents) ilr. Cyril J. Crane l | ||
Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 (1 copy w/attachaents) l l | |||
l | l | ||
ATTACHMENT 1 NORTH ANNA POWER STATION UNIT 1 1 | ATTACHMENT 1 NORTH ANNA POWER STATION UNIT 1 1 | ||
6 | A. | ||
8 | General References Vepco Franklin Reference Reference Number Number Status / Comments 1 | ||
9 | a This reference is included in QDR 36. | ||
10 | 6 b | ||
11 | This reference is included in QDR 23. | ||
15 | 8 c | ||
18 | This reference is included in QDR 24. | ||
21 | 9 d | ||
31 | This reference is included in QDR 22. | ||
32 | 10 e | ||
33 | This reference is included in QDR 23 and 25. | ||
39 | 11 f | ||
40 | This reference is included in QDR 22. | ||
41 | 15 g | ||
46 | This reference is included in QDR 23 and 25. | ||
51 | 18 h | ||
52 | This reference is included in QDR 28. | ||
53 | 21 i | ||
This reference is included in QDR 80. | |||
31 j | |||
This reference is included in QDR 18 and 19. | |||
32 k | |||
This reference is included in QDR 18 and 19. | |||
33 1 | |||
This reference is included in QDR 18 and 19. | |||
39 m | |||
This reference is included in QDR 37. | |||
40 n | |||
This reference is included in QDR 37. | |||
41 o | |||
This reference is included in QDR 28. | |||
46 p | |||
This reference is included in QDR 44. | |||
51 q | |||
This reference is included in QDR 68. | |||
52 r | |||
This reference is included in QDR 69. | |||
53 s | |||
This reference is included in QDR 38. | |||
cdk/2621A/l | cdk/2621A/l | ||
.s_ | |||
Vepco | 1.__as.4 Vepco Franklin Reference Reference Number Number Status / Comments 56 t | ||
Number | This reference is included in QDR 45, 47, 48, 49, 50, 51, 52, 54, 57, 58, 58A, 59, and 60A. | ||
58A, 59, and 60A. | I 60 u | ||
61 | The reference has been deleted. | ||
62 | 61 v | ||
73 | This reference is included in QDR 68. | ||
80 | 62 w | ||
82 | This reference is included in QDR 44. | ||
83 | 73 x | ||
89 | This reference is included in QDR 63. | ||
97 | 80 y | ||
89 | This reference is included in QDR 45, 46, 47, 48, 49, 50, 52, 58, and 59. | ||
99 | 81 z | ||
100 | This reference is included in QDR 46 and 59. | ||
101 | 82 aa This reference is included in QDR 57. | ||
105 | 83 bb This reference is included in QDR 33. | ||
106 | i 84 cc This reference is included in QDR 33. | ||
107 | 89 dd This reference is included in QDR 64. | ||
112 | 97 ee This reference is included in QDR 24. | ||
89 ff This reference is included in QDR 83, and 84. | |||
99 gg This reference is included in QDR 63, 65, 62 and 66. | |||
100 hh This reference is included in QDR 83 and 84. | |||
101 ii This reference is included in QDR 83 104 jj This reference is included in QDR 83 and 84. | |||
105 kk This reference is included in QDR 37. | |||
106 11 This reference is included in QDR 27. | |||
107 mm | |||
'This reference is included in QDR 27. | |||
112 nn This reference is included in QDR 28. | |||
cdk/2621A/2 | cdk/2621A/2 | ||
.~ | |||
: 1. _ u _. _ _.s. - | ~ | ||
: 1. _ u _. _ _.s. - | |||
.. ~ | |||
Vepco | Vepco Franklin Reference Reference Number Number Status / Comments 116 oo This reference is included in QDR 65 and 66. | ||
117 | 117 pp This reference is included in QDR 28. | ||
120 | 120 qq This reference is included in QDR 37. | ||
122 | 122 rr This reference is included in QDR 44. | ||
123 | 123 ss This reference is included in QDR 67. | ||
128 | 128 tt This reference is included in QDR 62 and 63. | ||
129 | 129 uu This reference is included in QDR 38. | ||
131 | 131 vv This reference is-included in QDR 68. | ||
132 | 132 ww This reference is included in QDR 47, 49, 51, 54 and 60. | ||
133 | 133 xx This reference is included in QDR 68. | ||
135 | 135 yy This reference is included in QDR 35. | ||
137 | 137 zz This reference is included in QDR 35. | ||
a.a.a. | |||
This reference is for equipment which is being replaced. | |||
* Note: This reference was not listed in the reference section of the 79-01B l | A QDR will is being prepared for this equipnent. | ||
l | * Note: This reference was not listed in the reference section of the 79-01B l | ||
22 | Report. | ||
l B. | |||
The QDR's which are referenced above and included in this submittal are as follows: | |||
22 23 24 25 27 28 32 33 36 37 38 44 45 46 47 48 49 50 51 52 54 55 57 58 58A 59 60A 62 63 64 65 66 67 68 80 83 84 1 | |||
2 Most of the QDR's for limitorque motor operated valves have been included in this submittal. They should provide the information requested. | |||
Further requests for information should include a QDR number, worksheet number, or device mark number. | |||
l cdk/2621A/3 | l cdk/2621A/3 | ||
.....a.. | |||
.w... | |||
l ATTACHMENT 2 NORTH ANNA POWER STATION UNIT 2 1 | c l | ||
6 | ATTACHMENT 2 NORTH ANNA POWER STATION UNIT 2 1 | ||
8 | A. | ||
9 | General References Vepco Franklin Reference Reference Number Number Status / Comments 1 | ||
15 | a This reference is included in QDR 14. | ||
16 | 6 b | ||
17 | This reference is included in QDR 7 and 8. | ||
19 | 8 c | ||
20 | This reference is included in QDR 7. | ||
25 | 9 d | ||
28 | This reference is included in QDR 9. | ||
30 | 15 e | ||
31 | This reference is included in QDR 7, 8 and 13. | ||
32 | 16 f | ||
33 | This reference is included in QDR 6,11 and 12. | ||
17 g | |||
This reference is included in QDR W-20. | |||
19 h | |||
This reference is included in QDR W-13 and W-20. | |||
20 i | |||
This reference is included in QDR 11 and 12 21 j | |||
This reference is included in QDR 32. | |||
25 k | |||
This reference is included in QDR 26, 28 and 29. | |||
28 1 | |||
This reference is included in QDR 28. | |||
30 m | |||
This reference is included in QDR 75. | |||
31 n | |||
This reference is for equipment which is being replaced. | |||
A QDR is being developed for this equipment. | |||
32 o | |||
This reference is for equipment which is being replaced. A QDR is being developed for this equipment. | |||
33 p | |||
This reference is for equipment which is being replaced. A QDR is being developed for this equipment. | |||
cdk/2621A/4 | cdk/2621A/4 | ||
Vepco | Vepco Franklin Reference Reference Number Number Status / Comments 36 q | ||
37 | This reference is included in QDR 24 and 25. | ||
39 | 37 r | ||
40 | This reference is included in QDR 24 and 25. | ||
46 | 39 s | ||
51 | This reference is included in QDR 26, 28 and 29. | ||
52 | 40 t | ||
53 | This reference is included in QDR's 50, 52, 53, 57, W-5, W-8, W-ll, W-14, W-16, W-18, W-19, W-20, W-21, W-22, W-24, W-25, W-29, W-34, W-35, W-38 and W-39. | ||
61 | 46 u | ||
66 | This reference is included in QDR W-6. | ||
66 | 51 v | ||
66 | This reference is included in QDR 39. | ||
67 | 52 w | ||
This reference is included in QDR W-13 and W-20. | |||
70 | 53 x | ||
71 | This reference is included in QDR 44. | ||
71 | 61 y | ||
71 | This reference is included in QDR 39. | ||
71 | 66 z | ||
71 | This reference is included in QDR 43. | ||
71 | 66 aa This reference is included in QDR 43. | ||
l l | 66 bb This reference is included in QDR 43. | ||
67 cc This reference is included in QDR W-13 and W-20. | |||
A 69 dd This reference is included in QDR 6,11 and 12. | |||
70 ee This reference is included in QDR W-16, W-38 and W-39. | |||
71 ff This reference is included in QDR 43. | |||
71 gg This reference is included in QDR 43. | |||
71 hh This reference is included in QDR 43. | |||
71 ii This reference is included in QDR 43. | |||
71 jj This reference is included in QDR 43. | |||
71 kk This reference is included in QDR 43. | |||
l l | |||
cdk/2621A/S | |||
,......m.__.. | |||
.z- - - - ----- - - -- - - - - - | |||
Vepco | Vepco Franklin Reference Reference Number Number Status / Comments 71 11 This reference is included in QDR 43. | ||
71 | 71 mm This reference is included in QDR 43. | ||
72 | 72 nn This reference is included in QDR 43. | ||
74 | 74 oo This reference is included in QDR 22. | ||
75 | 75 pp This reference is included in QDR 43. | ||
81 | 81 qq This reference is included in QDR 48. | ||
82 | 82 rr This reference is included in QDR 19, 24 and 25 85 ss This reference is included in QDR 23 and 74. | ||
86 | 86 tt This reference is included in QDR 11. | ||
92 | 92 uu This reference is included in QDR 19. | ||
93 | 93 vv This reference is included in QDR 16. | ||
96 | 96 ww This reference is included in QDR 37. | ||
97 | 97 xx This ref erence is included in QDR 44. | ||
99 | 99 yy This reference has been deleted. | ||
102 | 102 zz This reference has been deleted. | ||
103 | 103 aaa This reference is included in QDR W-17 and W-36. | ||
104 | 104 bbb This reference is included in QDR 19 and 24. | ||
106 | 106 ccc This reference is included in QDR 22. | ||
107 | 107 ddd This reference is included in QDR 22. | ||
112 | 112 eee This reference is included in QDR W-13. | ||
113 | 113 fff This reference is included in QDR 22. | ||
114 | 114 ggg This reference is included in QDR 34 and 39 118 hhh This reference is included in QDR 12. | ||
119 | 119 iii This reference is included in QDR 44. | ||
cdk/2621A/6 | cdk/2621A/6 1 | ||
/ | |||
= | |||
*/ | |||
r, Vepco Franklin Reference Reference Number Number | |||
Reference | $tatus'/ Comments | ||
's 121 jjj This reference.is included in QDR 39. | |||
121 | ~ | ||
This reference.is included in QDR 39. | 122 kkk This reference 1s included in QDR W-6, | ||
,W-17, W-36 and W-37. | |||
122 | 123 111 This reference is included in QDR 39. | ||
125 mmm This reference is. included in QDR 10. | |||
123 | 126 nnn This reference is included.in QDR 26. | ||
125 | c 000 This reference is included in QDR 24. | ||
126 | ppp This reference is included in QDR 24. | ||
c | This reference is in'cl.uderf,f n QDR 33. | ||
qqq J-rrr This reference is incitided in QDR 75. | |||
i sss This reference is included in QDR 23. | |||
ttt This reference is included in QDR 33. | |||
J- | uuu This reference is neluded in QDR W-5. | ||
vvv This reference,is includad'in QDR W-4 2. | |||
i | This -reference is'in the process of being conole,t,ed. | ||
* Note: | |||
These references were not listed in the NUREG'0588 90 Day Review. | |||
* Note: | |||
The following QDR's which are referenced above'and. included in this submittal are as follows: | The following QDR's which are referenced above'and. included in this submittal are as follows: | ||
6 7 | |||
6 | 8 9 | ||
V-17 W-18 | 10 | ||
They should provide the information requested. Further requests for information should include a QDR number, worksheet number, or device mark number. | ~ | ||
cdk/2621A/7 | 11 12 13 14 16 19 22 23 24 25 26 28 29 32 33 | ||
, 44 34 37 39 43 48 50 52 53 57 74 75 W-5 W-6 W-8 W-ll W-13 W-14 W-16 V-17 I | |||
W-18 W-19 W-20 W-21 W-22 W-24 W-25 W-29 W-34 W-35 W-36 W-37 W-38 W-39 2 | |||
QDR's covering limitorque motor operators are included in this submittal. | |||
They should provide the information requested. | |||
Further requests for information should include a QDR number, worksheet number, or device mark number. | |||
cdk/2621A/7 | |||
.1}} | |||
Latest revision as of 22:04, 16 December 2024
| ML20063D039 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 06/25/1982 |
| From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Varga S Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0588, RTR-NUREG-588 027, 27, IEB-79-01B, IEB-79-1B, NUDOCS 8207010183 | |
| Download: ML20063D039 (9) | |
Text
_
VIltGINIA EI.ncraic Ann Powen COMPANY.
HIcunown, VIMUINIA 23261 1
H.H.LetAmmuno JW'""l::,"L.
l lir. Harold R. Denton Serial No.
027 Office of Nuclear Reactor Regulation PSE&C/RRC Attention: Mr. Stephen A. Yarga, Chief Operating Reactors Branch No.1 Docket llos.
50-338 Division of Licensing 50-339 U. S. Iluclear Regulatory Cor.nission License Nos. NPF-4 Washington, D. C.
20555 NPF-7
Dear fir. Denton:
REQUEST FOR ADDITIONAL INFORf!ATION ENVIRONfENTAL QUALIFICATION OF SAFETY RELATED ELECTRICAL EQUIPMENT NORTH ANNA POWER STATION UNITS 1 AND 2 In a letter dated January 12, 1982, the NRC requested that Yepco supply copics of the docuacntation referenced in the I.E. Bulletin 79-01B and NUREG 0588 90 Day Review to the Franklin Research Center.
In response to this request Vepco is supplying in separate correspondence to Franklin Research Center (dated 6/25/82) copies of Qualification Docunentation Review (QDR) packages. These documents are intended to provide'a couplete record of the Vepco/ Gilbert Associates review of the equipment listed on the equipnent qualification "aaster list". These packages will contain all the necessary docuuentation to support the qualification of the equipaent for which a particular QDR was issued.
It is our opinion that the review of qualification of itens listed on the naster list should be based on information contained in the QDRs r5ther than on isolated test reports or correspondence. However, some references contained in the I.E. Bulletin 79-01B 90 Day Review and flVREG 0588 90 Day Revieu were not required for qualification of equipment or for other reasons were not used to support the findings of the qualification review.
Attacinents 1 and 2 provide a listing of the references requested and the status of these references with regard to this submittal.
The document support requested in Section A, "FRC Review of the Licensee's 90 Day Response to the NRC EEQ SER," of the Franklin Research Center attachuent to your letter of January 12, 1982 is being forwarded under i
separate cover to the Franklin Research Center (FRC). A copy of the tranmittal letter util be sent to you.
l OYS 8207010183 820625 DRADOCK05000g
Vinosw A Es.tctnIC AND roWEN COMPANY 70 lr. herold R. Denton The document support "FRC Review of installed Till Action Plan Iteas",
requested in Section B of the FRC attachaent to your letter of January 12, 1982 will be sent upon completion no later than July 26, 1982.
We are available at your earliest convenience should additional information be required.
Very truly yours, b-R. H. Leasburg Attachaents RRC:cdk cc: fir. R. C. DeYoung, Director llRC Office of Inspection and Enforcement Division of Reactor Operations Inspection liashington, D. C.
20555 (8 copies w/attachaents) fir. Zoltan R. Rosztoczy, Branch Chief IIRC Equipaent Qualification Branch Division of Engineering Washington, D. C.
20555 (1 copy w/attachaents) fir. Jaacs P. O'Reilly, Regional Adainistrator Region II 101 liarietta Street, Suite 3100 Atlanta, Georgia 30303 (1 copy w/attachaents) ilr. Cyril J. Crane l
Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 (1 copy w/attachaents) l l
l
ATTACHMENT 1 NORTH ANNA POWER STATION UNIT 1 1
A.
General References Vepco Franklin Reference Reference Number Number Status / Comments 1
a This reference is included in QDR 36.
6 b
This reference is included in QDR 23.
8 c
This reference is included in QDR 24.
9 d
This reference is included in QDR 22.
10 e
This reference is included in QDR 23 and 25.
11 f
This reference is included in QDR 22.
15 g
This reference is included in QDR 23 and 25.
18 h
This reference is included in QDR 28.
21 i
This reference is included in QDR 80.
31 j
This reference is included in QDR 18 and 19.
32 k
This reference is included in QDR 18 and 19.
33 1
This reference is included in QDR 18 and 19.
39 m
This reference is included in QDR 37.
40 n
This reference is included in QDR 37.
41 o
This reference is included in QDR 28.
46 p
This reference is included in QDR 44.
51 q
This reference is included in QDR 68.
52 r
This reference is included in QDR 69.
53 s
This reference is included in QDR 38.
cdk/2621A/l
.s_
1.__as.4 Vepco Franklin Reference Reference Number Number Status / Comments 56 t
This reference is included in QDR 45, 47, 48, 49, 50, 51, 52, 54, 57, 58, 58A, 59, and 60A.
I 60 u
The reference has been deleted.
61 v
This reference is included in QDR 68.
62 w
This reference is included in QDR 44.
73 x
This reference is included in QDR 63.
80 y
This reference is included in QDR 45, 46, 47, 48, 49, 50, 52, 58, and 59.
81 z
This reference is included in QDR 46 and 59.
82 aa This reference is included in QDR 57.
83 bb This reference is included in QDR 33.
i 84 cc This reference is included in QDR 33.
89 dd This reference is included in QDR 64.
97 ee This reference is included in QDR 24.
89 ff This reference is included in QDR 83, and 84.
99 gg This reference is included in QDR 63, 65, 62 and 66.
100 hh This reference is included in QDR 83 and 84.
101 ii This reference is included in QDR 83 104 jj This reference is included in QDR 83 and 84.
105 kk This reference is included in QDR 37.
106 11 This reference is included in QDR 27.
107 mm
'This reference is included in QDR 27.
112 nn This reference is included in QDR 28.
cdk/2621A/2
.~
~
- 1. _ u _. _ _.s. -
.. ~
Vepco Franklin Reference Reference Number Number Status / Comments 116 oo This reference is included in QDR 65 and 66.
117 pp This reference is included in QDR 28.
120 qq This reference is included in QDR 37.
122 rr This reference is included in QDR 44.
123 ss This reference is included in QDR 67.
128 tt This reference is included in QDR 62 and 63.
129 uu This reference is included in QDR 38.
131 vv This reference is-included in QDR 68.
132 ww This reference is included in QDR 47, 49, 51, 54 and 60.
133 xx This reference is included in QDR 68.
135 yy This reference is included in QDR 35.
137 zz This reference is included in QDR 35.
a.a.a.
This reference is for equipment which is being replaced.
A QDR will is being prepared for this equipnent.
- Note: This reference was not listed in the reference section of the 79-01B l
Report.
l B.
The QDR's which are referenced above and included in this submittal are as follows:
22 23 24 25 27 28 32 33 36 37 38 44 45 46 47 48 49 50 51 52 54 55 57 58 58A 59 60A 62 63 64 65 66 67 68 80 83 84 1
2 Most of the QDR's for limitorque motor operated valves have been included in this submittal. They should provide the information requested.
Further requests for information should include a QDR number, worksheet number, or device mark number.
l cdk/2621A/3
.....a..
.w...
c l
ATTACHMENT 2 NORTH ANNA POWER STATION UNIT 2 1
A.
General References Vepco Franklin Reference Reference Number Number Status / Comments 1
a This reference is included in QDR 14.
6 b
This reference is included in QDR 7 and 8.
8 c
This reference is included in QDR 7.
9 d
This reference is included in QDR 9.
15 e
This reference is included in QDR 7, 8 and 13.
16 f
This reference is included in QDR 6,11 and 12.
17 g
This reference is included in QDR W-20.
19 h
This reference is included in QDR W-13 and W-20.
20 i
This reference is included in QDR 11 and 12 21 j
This reference is included in QDR 32.
25 k
This reference is included in QDR 26, 28 and 29.
28 1
This reference is included in QDR 28.
30 m
This reference is included in QDR 75.
31 n
This reference is for equipment which is being replaced.
A QDR is being developed for this equipment.
32 o
This reference is for equipment which is being replaced. A QDR is being developed for this equipment.
33 p
This reference is for equipment which is being replaced. A QDR is being developed for this equipment.
cdk/2621A/4
Vepco Franklin Reference Reference Number Number Status / Comments 36 q
This reference is included in QDR 24 and 25.
37 r
This reference is included in QDR 24 and 25.
39 s
This reference is included in QDR 26, 28 and 29.
40 t
This reference is included in QDR's 50, 52, 53, 57, W-5, W-8, W-ll, W-14, W-16, W-18, W-19, W-20, W-21, W-22, W-24, W-25, W-29, W-34, W-35, W-38 and W-39.
46 u
This reference is included in QDR W-6.
51 v
This reference is included in QDR 39.
52 w
This reference is included in QDR W-13 and W-20.
53 x
This reference is included in QDR 44.
61 y
This reference is included in QDR 39.
66 z
This reference is included in QDR 43.
66 aa This reference is included in QDR 43.
66 bb This reference is included in QDR 43.
67 cc This reference is included in QDR W-13 and W-20.
A 69 dd This reference is included in QDR 6,11 and 12.
70 ee This reference is included in QDR W-16, W-38 and W-39.
71 ff This reference is included in QDR 43.
71 gg This reference is included in QDR 43.
71 hh This reference is included in QDR 43.
71 ii This reference is included in QDR 43.
71 jj This reference is included in QDR 43.
71 kk This reference is included in QDR 43.
l l
cdk/2621A/S
,......m.__..
.z- - - - ----- - - -- - - - - -
Vepco Franklin Reference Reference Number Number Status / Comments 71 11 This reference is included in QDR 43.
71 mm This reference is included in QDR 43.
72 nn This reference is included in QDR 43.
74 oo This reference is included in QDR 22.
75 pp This reference is included in QDR 43.
81 qq This reference is included in QDR 48.
82 rr This reference is included in QDR 19, 24 and 25 85 ss This reference is included in QDR 23 and 74.
86 tt This reference is included in QDR 11.
92 uu This reference is included in QDR 19.
93 vv This reference is included in QDR 16.
96 ww This reference is included in QDR 37.
97 xx This ref erence is included in QDR 44.
99 yy This reference has been deleted.
102 zz This reference has been deleted.
103 aaa This reference is included in QDR W-17 and W-36.
104 bbb This reference is included in QDR 19 and 24.
106 ccc This reference is included in QDR 22.
107 ddd This reference is included in QDR 22.
112 eee This reference is included in QDR W-13.
113 fff This reference is included in QDR 22.
114 ggg This reference is included in QDR 34 and 39 118 hhh This reference is included in QDR 12.
119 iii This reference is included in QDR 44.
cdk/2621A/6 1
/
=
- /
r, Vepco Franklin Reference Reference Number Number
$tatus'/ Comments
's 121 jjj This reference.is included in QDR 39.
~
122 kkk This reference 1s included in QDR W-6,
,W-17, W-36 and W-37.
123 111 This reference is included in QDR 39.
125 mmm This reference is. included in QDR 10.
126 nnn This reference is included.in QDR 26.
c 000 This reference is included in QDR 24.
ppp This reference is included in QDR 24.
This reference is in'cl.uderf,f n QDR 33.
qqq J-rrr This reference is incitided in QDR 75.
i sss This reference is included in QDR 23.
ttt This reference is included in QDR 33.
uuu This reference is neluded in QDR W-5.
vvv This reference,is includad'in QDR W-4 2.
This -reference is'in the process of being conole,t,ed.
- Note:
These references were not listed in the NUREG'0588 90 Day Review.
The following QDR's which are referenced above'and. included in this submittal are as follows:
6 7
8 9
10
~
11 12 13 14 16 19 22 23 24 25 26 28 29 32 33
, 44 34 37 39 43 48 50 52 53 57 74 75 W-5 W-6 W-8 W-ll W-13 W-14 W-16 V-17 I
W-18 W-19 W-20 W-21 W-22 W-24 W-25 W-29 W-34 W-35 W-36 W-37 W-38 W-39 2
QDR's covering limitorque motor operators are included in this submittal.
They should provide the information requested.
Further requests for information should include a QDR number, worksheet number, or device mark number.
cdk/2621A/7
.1