{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward | {{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward x | ||
March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch | |||
Overall Plan & Path Forward | 2 Completed Tabletops at facilities Dec 2022 Conduct public meeting Workshop with Tabletop sites/Industry Stakeholders Mar 2023 Developed Working Group recommendations for near-term path forward Feb 2023 Obtained Alignment with NRC Mgt. on PCC Proposal Feb/Mar 2023 Overall Plan & Path Forward Develop near-term oversight guidance Summer 2023 Develop Enf./SDP strategy and Regional Panel Guidance Fall 2023 Issue Public Report on Tabletops April/May 2023 Gather feedback from near-term oversight, update as necessary 2024-2026 Develop long-term oversight process 2026 | ||
Proposal: | 3 Proposal: | ||
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. | * Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant. | ||
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making. | * Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making. | ||
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework. | * The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework. | ||
Evaluated Options Four options considered: | 4 Evaluated Options Four options considered: | ||
* Option 1 - Comprehensive Engineering Team Inspection (CETI) | * Option 1 - Comprehensive Engineering Team Inspection (CETI) | ||
(Internal Events, Flooding & Other Approved Hazards) | (Internal Events, Flooding & Other Approved Hazards) | ||
| Line 33: | Line 33: | ||
* Option 4 - OpE Smart Sample (OpESS) | * Option 4 - OpE Smart Sample (OpESS) | ||
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.). | Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.). | ||
WGs Recommended Inspection Enhancement | 5 WGs Recommended Inspection Enhancement | ||
* Step 1 (Near-term): OpE Smart Sample (OpESS+) | * Step 1 (Near-term): OpE Smart Sample (OpESS+) | ||
PROPOSED Inspection Procedures: | PROPOSED Inspection Procedures: | ||
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) | 71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) 71111.13, Maintenance Risk Assessments and Emergent Work Control 71111.18, Plant Modifications 71151, Performance Indicator Verification 71152, Problem Identification and Resolution (PI&R) 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026) | ||
Step 1.A: Evolve/Update OpESS+ as needed. | |||
Proposed OpESS+ | 6 OpESS+ | ||
applicable and flexible to the Risk-Informed | SFCP NFPA 805 RICT 50.69 Proposed OpESS+ | ||
Initiatives in place. | applicable and flexible to the Risk-Informed Initiatives in place. | ||
Balanced and graded approach. | |||
Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete) | 7 Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete) | ||
Obtain and address Industry and Public Feedback (Ongoing) | Obtain and address Industry and Public Feedback (Ongoing) | ||
Internal Communication/Awareness (Ongoing) | Internal Communication/Awareness (Ongoing) | ||
Training and Communication with Inspectors (Ongoing) | |||
Finalize OpESS guidance (Ongoing) | Finalize OpESS guidance (Ongoing) | ||
Enforcement / Significance Determination Process | Enforcement / Significance Determination Process | ||
* Initiate Cross Regional Panel Process (Ongoing) | * Initiate Cross Regional Panel Process (Ongoing) | ||
* Develop Screening Guidance (Ongoing) | * Develop Screening Guidance (Ongoing) | ||
* More-than-Minor/Green Threshold criteria (Ongoing) | * More-than-Minor/Green Threshold criteria (Ongoing) | ||
Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027) | 8 Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027) | ||
Update SDP/Enforcement of PCC issues | Update SDP/Enforcement of PCC issues | ||
Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry | 9 Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry ROP Bi-Monthly public meetings Public workshops Industry meetings/interactions | ||
Questions | 10 Questions}} | ||
Latest revision as of 07:40, 27 November 2024
| ML23088A076 | |
| Person / Time | |
|---|---|
| Issue date: | 03/30/2023 |
| From: | Lundy Pressley NRC/NRR/DRA/APOB |
| To: | |
| References | |
| Download: ML23088A076 (1) | |
Text
PRA Configuration Control Workshop Proposed Path Forward x
March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch
2 Completed Tabletops at facilities Dec 2022 Conduct public meeting Workshop with Tabletop sites/Industry Stakeholders Mar 2023 Developed Working Group recommendations for near-term path forward Feb 2023 Obtained Alignment with NRC Mgt. on PCC Proposal Feb/Mar 2023 Overall Plan & Path Forward Develop near-term oversight guidance Summer 2023 Develop Enf./SDP strategy and Regional Panel Guidance Fall 2023 Issue Public Report on Tabletops April/May 2023 Gather feedback from near-term oversight, update as necessary 2024-2026 Develop long-term oversight process 2026
3 Proposal:
- Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
- Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
- The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
4 Evaluated Options Four options considered:
- Option 1 - Comprehensive Engineering Team Inspection (CETI)
(Internal Events, Flooding & Other Approved Hazards)
Focused Engineering Inspection (FEI) / (71111.21N)
- Option 2 - Resident Inspector Baseline Procedures. All hazards.
- Option 3 - IMC 2515 Appendix C, Infrequent Inspection.
- Option 4 - OpE Smart Sample (OpESS)
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
5 WGs Recommended Inspection Enhancement
- Step 1 (Near-term): OpE Smart Sample (OpESS+)
PROPOSED Inspection Procedures:
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) 71111.13, Maintenance Risk Assessments and Emergent Work Control 71111.18, Plant Modifications 71151, Performance Indicator Verification 71152, Problem Identification and Resolution (PI&R) 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
Step 1.A: Evolve/Update OpESS+ as needed.
6 OpESS+
SFCP NFPA 805 RICT 50.69 Proposed OpESS+
applicable and flexible to the Risk-Informed Initiatives in place.
Balanced and graded approach.
7 Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
Obtain and address Industry and Public Feedback (Ongoing)
Internal Communication/Awareness (Ongoing)
Training and Communication with Inspectors (Ongoing)
Finalize OpESS guidance (Ongoing)
Enforcement / Significance Determination Process
- Initiate Cross Regional Panel Process (Ongoing)
- Develop Screening Guidance (Ongoing)
- More-than-Minor/Green Threshold criteria (Ongoing)
8 Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
Update SDP/Enforcement of PCC issues
9 Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry ROP Bi-Monthly public meetings Public workshops Industry meetings/interactions
10 Questions