{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward   x March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch
{{#Wiki_filter:PRA Configuration Control Workshop Proposed Path Forward x
March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch


Overall Plan & Path Forward Obtained                                    Develop Enf./SDP               Develop Completed                                    Issue Public Alignment with                                  strategy and                long-term Tabletops                                    Report on NRC Mgt. on                                    Regional Panel            oversight process at facilities                                  Tabletops PCC Proposal                                      Guidance Dec 2022                                  April/May 2023                                         2026 Feb/Mar 2023                                      Fall 2023 Conduct public                                    Gather feedback Developed meeting                  Develop                from near-term Working Group Workshop with              near-term            oversight, update as recommendations Tabletop                oversight                  necessary for near-term sites/Industry            guidance path forward                                                                2024-2026 Stakeholders            Summer 2023 Feb 2023 Mar 2023 2
2 Completed Tabletops at facilities Dec 2022 Conduct public meeting Workshop with Tabletop sites/Industry Stakeholders Mar 2023 Developed Working Group recommendations for near-term path forward Feb 2023 Obtained Alignment with NRC Mgt. on PCC Proposal Feb/Mar 2023 Overall Plan & Path Forward Develop near-term oversight guidance Summer 2023 Develop Enf./SDP strategy and Regional Panel Guidance Fall 2023 Issue Public Report on Tabletops April/May 2023 Gather feedback from near-term oversight, update as necessary 2024-2026 Develop long-term oversight process 2026


Proposal:
3 Proposal:
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
* Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
* Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
* The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.
3


Evaluated Options Four options considered:
4 Evaluated Options Four options considered:
* Option 1 - Comprehensive Engineering Team Inspection (CETI)
* Option 1 - Comprehensive Engineering Team Inspection (CETI)
(Internal Events, Flooding & Other Approved Hazards)
(Internal Events, Flooding & Other Approved Hazards)
Line 33: Line 33:
* Option 4 - OpE Smart Sample (OpESS)
* Option 4 - OpE Smart Sample (OpESS)
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).
4


WGs Recommended Inspection Enhancement
5 WGs Recommended Inspection Enhancement
* Step 1 (Near-term): OpE Smart Sample (OpESS+)
* Step 1 (Near-term): OpE Smart Sample (OpESS+)
PROPOSED Inspection Procedures:
PROPOSED Inspection Procedures:
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD)
71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) 71111.13, Maintenance Risk Assessments and Emergent Work Control 71111.18, Plant Modifications 71151, Performance Indicator Verification 71152, Problem Identification and Resolution (PI&R) 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
* 71111.13, Maintenance Risk Assessments and Emergent Work Control
Step 1.A: Evolve/Update OpESS+ as needed.  
* 71111.18, Plant Modifications
* 71151, Performance Indicator Verification
* 71152, Problem Identification and Resolution (PI&R)
* 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)
* Step 1.A: Evolve/Update OpESS+ as needed.
5


Proposed OpESS+
6 OpESS+
applicable and flexible to the Risk-Informed SFCP  Balanced and graded approach.
SFCP NFPA 805 RICT 50.69 Proposed OpESS+
Initiatives in place.
applicable and flexible to the Risk-Informed Initiatives in place.
50.69    OpESS+ NFPA 805 RICT 6
Balanced and graded approach.


Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
7 Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)
Obtain and address Industry and Public Feedback (Ongoing)
Obtain and address Industry and Public Feedback (Ongoing)
Internal Communication/Awareness (Ongoing)
Internal Communication/Awareness (Ongoing)
* Training and Communication with Inspectors (Ongoing)
Training and Communication with Inspectors (Ongoing)
Finalize OpESS guidance (Ongoing)
Finalize OpESS guidance (Ongoing)
Enforcement / Significance Determination Process
Enforcement / Significance Determination Process
* Initiate Cross Regional Panel Process (Ongoing)
* Initiate Cross Regional Panel Process (Ongoing)
* Develop Screening Guidance (Ongoing)
* Develop Screening Guidance (Ongoing)
* More-than-Minor/Green Threshold criteria (Ongoing) 7
* More-than-Minor/Green Threshold criteria (Ongoing)


Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
8 Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)
Update SDP/Enforcement of PCC issues 8
Update SDP/Enforcement of PCC issues


Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry
9 Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry ROP Bi-Monthly public meetings Public workshops Industry meetings/interactions
* ROP Bi-Monthly public meetings
* Public workshops
* Industry meetings/interactions 9


Questions 10}}
10 Questions}}

Latest revision as of 07:40, 27 November 2024

Pcc - Workshop - Path Forward - March 30, 2023 - Final
ML23088A076
Person / Time
Issue date: 03/30/2023
From: Lundy Pressley
NRC/NRR/DRA/APOB
To:
References
Download: ML23088A076 (1)


Text

PRA Configuration Control Workshop Proposed Path Forward x

March 30, 2023 Lundy Pressley Reliability and Risk Analyst Office of Nuclear Reactor Regulation Division of Risk Assessment PRA Oversight Branch

2 Completed Tabletops at facilities Dec 2022 Conduct public meeting Workshop with Tabletop sites/Industry Stakeholders Mar 2023 Developed Working Group recommendations for near-term path forward Feb 2023 Obtained Alignment with NRC Mgt. on PCC Proposal Feb/Mar 2023 Overall Plan & Path Forward Develop near-term oversight guidance Summer 2023 Develop Enf./SDP strategy and Regional Panel Guidance Fall 2023 Issue Public Report on Tabletops April/May 2023 Gather feedback from near-term oversight, update as necessary 2024-2026 Develop long-term oversight process 2026

3 Proposal:

  • Some level of oversight is appropriate to ensure the PRA is maintained over the life of the plant.
  • Balanced approach of focused inspections within the existing ROP to monitor Plant/PRA changes and ensure appropriate implementation of PRA Configuration Control (PCC) programs for licensee PRA models that support risk-informed decision-making.
  • The NRC Working Group has leveraged insights from the information gathered from the voluntarily performed tabletops, as well as interactions with industry and public meetings, to develop options and a draft recommendation for the PRA CC framework.

4 Evaluated Options Four options considered:

  • Option 1 - Comprehensive Engineering Team Inspection (CETI)

(Internal Events, Flooding & Other Approved Hazards)

Focused Engineering Inspection (FEI) / (71111.21N)

  • Option 2 - Resident Inspector Baseline Procedures. All hazards.
  • Option 4 - OpE Smart Sample (OpESS)

Added to current CETI/FEI/Fire/and Others as applicable (i.e., IP 37060, 71151, etc.).

5 WGs Recommended Inspection Enhancement

  • Step 1 (Near-term): OpE Smart Sample (OpESS+)

PROPOSED Inspection Procedures:

71111.21M, Comprehensive Engineering Team Inspection, (CETI) 71111.21N.05, Fire Protection Team Inspection (FTPI) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment SSC Resident Baseline: 71111 as appropriate (TBD) 71111.13, Maintenance Risk Assessments and Emergent Work Control 71111.18, Plant Modifications 71151, Performance Indicator Verification 71152, Problem Identification and Resolution (PI&R) 71153, Follow up of Events and Notices of Enforcement Discretion Focused Engineering Inspection (FEI) - None Current, Future TBD (2024-2026)

Step 1.A: Evolve/Update OpESS+ as needed.

6 OpESS+

SFCP NFPA 805 RICT 50.69 Proposed OpESS+

applicable and flexible to the Risk-Informed Initiatives in place.

Balanced and graded approach.

7 Near-term Actions - OpESS Obtained preliminary NRC Management endorsement of the WG recommendation (Complete)

Obtain and address Industry and Public Feedback (Ongoing)

Internal Communication/Awareness (Ongoing)

Training and Communication with Inspectors (Ongoing)

Finalize OpESS guidance (Ongoing)

Enforcement / Significance Determination Process

  • Initiate Cross Regional Panel Process (Ongoing)
  • Develop Screening Guidance (Ongoing)
  • More-than-Minor/Green Threshold criteria (Ongoing)

8 Long-term Actions - ROP Update Based upon Feedback from OpESS institutionalize changes to ROP (Target 2026-2027)

Update SDP/Enforcement of PCC issues

9 Planned Outreach Efforts Issue publicly available report on insights from Tabletops Continue to engage with public and industry ROP Bi-Monthly public meetings Public workshops Industry meetings/interactions

10 Questions