{{#Wiki_filter:July 2, 2022
{{#Wiki_filter:Mr. Rod Penfield
Mr. Rod Penfield
Site Vice President  
Site Vice President
Energy Harbor Nuclear Corp.
Energy Harbor Nuclear Corp.
Perry Nuclear Power Plant
Perry Nuclear Power Plant
10 Center Road,
10 Center Road,
Perry, OH 44081
Perry, OH 44081
SUBJECT: PERRY NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL
SUBJECT: PERRY NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL  
            EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE  
            INSPECTION; INSPECTION REPORT 05000440/2022010
INSPECTION; INSPECTION REPORT 05000440/2022010
Dear Mr. Penfield:
Dear Mr. Penfield:
On September 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin
On September 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin  
a 50.59 Baseline Inspection at the Perry Nuclear Plant. This inspection will be performed in
a 50.59 Baseline Inspection at the Perry Nuclear Plant. This inspection will be performed in  
accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of the
accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of the  
inspection will take place during the week of September 19, 2022.
inspection will take place during the week of September 19, 2022.
Experience has shown that these baseline inspections are extremely resource intensive, both
Experience has shown that these baseline inspections are extremely resource intensive, both  
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the  
site and to ensure a productive inspection for both parties, we have enclosed a request for
site and to ensure a productive inspection for both parties, we have enclosed a request for  
documents needed for the inspection. These documents have been divided into three groups.
documents needed for the inspection. These documents have been divided into three groups.
      The first group of information is necessary to ensure that the inspection team is
        adequately prepared for the inspection. This information should be made available via a
        secure file sharing system (if available) no later than August 8, 2022. The inspection
        team will review this information and, by August 22, 2022, will request specific items that
        should be provided for review in the regional office by September 6, 2022.
      The second group of requested documents contains additional items that the team will
        review, or need access to, during the inspection. Certain documents contained within
        Group II (i.e., Item (1)), will be requested for review in the regional office prior to the
        inspection by September 6, 2022, as identified above. The remaining documents should
        be available by the first day of the onsite inspection, September 19, 2022.
      The third group lists information necessary to aid the inspection team in tracking issues
        identified as a result of the inspection. It is requested that this information be provided to
        the lead inspector as the information is generated during the inspection. It is important
        that all of these documents are up to date and complete in order to minimize the number
        of additional documents requested during the preparation and/or the onsite portions of
        the inspection.


R. Penfield                                     -2-
The first group of information is necessary to ensure that the inspection team is
The lead inspector for this inspection is Mr. J. V. Bozga. We understand that our licensing
adequately prepared for the inspection.  This information should be made available via a
contact for this inspection is Mr. G. Dujanovic of your organization. If there are any questions
secure file sharing system (if available) no later than August 8, 2022.  The inspection
about the inspection or the material requested in the enclosure, please contact the lead
team will review this information and, by August 22, 2022, will request specific items that
should be provided for review in the regional office by September 6, 2022.
 
The second group of requested documents contains additional items that the team will
review, or need access to, during the inspection.  Certain documents contained within
Group II (i.e., Item (1)), will be requested for review in the regional office prior to the
inspection by September 6, 2022, as identified above.  The remaining documents should
be available by the first day of the onsite inspection, September 19, 2022.
 
The third group lists information necessary to aid the inspection team in tracking issues
identified as a result of the inspection.  It is requested that this information be provided to
the lead inspector as the information is generated during the inspection.  It is important
that all of these documents are up to date and complete in order to minimize the number
of additional documents requested during the preparation and/or the onsite portions of
the inspection.
July 2, 2022
 
R. Penfield
- 2 -
The lead inspector for this inspection is Mr. J. V. Bozga. We understand that our licensing  
contact for this inspection is Mr. G. Dujanovic of your organization. If there are any questions  
about the inspection or the material requested in the enclosure, please contact the lead  
inspector at 630-829-9613.
inspector at 630-829-9613.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control
requesting document displays a currently valid Office of Management and Budget Control  
Number.
Number.
This letter and its enclosure will be made available for public inspection and copying at
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
Exemptions, Requests for Withholding.
Exemptions, Requests for Withholding.
                                              Sincerely,
Sincerely,
                                                                      Signed by Bozga, John
John V. Bozga, Senior Reactor Inspector
                                                                      on 07/02/22
Engineering Branch 1
                                              John V. Bozga, Senior Reactor Inspector
Division of Reactor Safety
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket No. 50-440
Docket No. 50-440
License No. NPF-58
License No. NPF-58
Line 80: Line 82:
Document Request for 50.59
Document Request for 50.59
   Inspection
   Inspection
cc: Distribution via LISTSERV
cc: Distribution via LISTSERV
Signed by Bozga, John
on 07/02/22


R. Penfield                                 -3-
R. Penfield
- 3 -
Letter to Rod Penfield from John V. Bozga dated July 2, 2022.
Letter to Rod Penfield from John V. Bozga dated July 2, 2022.
SUBJECT: PERRY NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL
SUBJECT: PERRY NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL  
            EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE  
            INSPECTION; INSPECTION REPORT 05000440/2022010
INSPECTION; INSPECTION REPORT 05000440/2022010
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 99: Line 104:
DRPIII
DRPIII
DRSIII
DRSIII
ADAMS Accession Number: ML22182A444
ADAMS Accession Number: ML22182A444
    Publicly Available       Non-Publicly Available       Sensitive Non-Sensitive
Publicly Available
OFFICE       RIII
Non-Publicly Available
NAME         JBozga:mb
Sensitive
DATE         07/02/2022
Non-Sensitive
                                  OFFICIAL RECORD COPY
OFFICE
RIII
NAME
JBozga:mb
DATE
07/02/2022
OFFICIAL RECORD COPY


                        DOCUMENT REQUEST FOR 50.59 INSPECTION
DOCUMENT REQUEST FOR 50.59 INSPECTION
Inspection Report:               05000440/2022010
Enclosure
Inspection Dates:               September 19-September 23, 2022
Inspection Report:
Inspection Procedures:           71111.17T, Evaluations of Changes, Tests, and Experiments
05000440/2022010
Lead Inspector:                 John V. Bozga
Inspection Dates:
                                630-829-9613
September 19-September 23, 2022
I.     Information Requested for In-Office Preparation Week
Inspection Procedures:
      The following information is requested by August 8, 2022, or sooner, to facilitate the
71111.17T, Evaluations of Changes, Tests, and Experiments
      selection of specific items that will be reviewed during the onsite inspection week. The
Lead Inspector:
      inspection team will select specific items from the information requested below and
John V. Bozga
      submit a list to your staff by August 22, 2022. We will request that certain items be
630-829-9613
      made available to the regional office prior to the inspection by September 6, 2022. We
I.
      request that the remaining items selected from the lists be available and ready for review
Information Requested for In-Office Preparation Week
      on the first day of inspection. All requested information should identify the associated
The following information is requested by August 8, 2022, or sooner, to facilitate the  
      system and cover the time frame from the receipt of information for the last MOD/50.59
selection of specific items that will be reviewed during the onsite inspection week. The  
      inspection to the present.
inspection team will select specific items from the information requested below and  
      The required information identified below should be provided via a secure file sharing
submit a list to your staff by August 22, 2022. We will request that certain items be  
      system (if available). Please provide each inspector access to the secure file sharing
made available to the regional office prior to the inspection by September 6, 2022. We  
      system (if available). The preferred file format is a searchable pdf file. The secure file
request that the remaining items selected from the lists be available and ready for review  
      sharing system (if available) should be indexed and hyper-linked to facilitate ease of use,
on the first day of inspection. All requested information should identify the associated  
      if possible. If you have any questions regarding this information, please call the
system and cover the time frame from the receipt of information for the last MOD/50.59  
      inspection team leader as soon as possible.
inspection to the present.
      (1)     List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59
The required information identified below should be provided via a secure file sharing  
              completed evaluations involving (a) calculations, (b) procedure revisions,
system (if available). Please provide each inspector access to the secure file sharing  
              (c) changes to the facility (modifications), (d) non-routine operating
system (if available). The preferred file format is a searchable pdf file. The secure file  
              configurations, or (e) departures in methods of analyses. This list should include
sharing system (if available) should be indexed and hyper-linked to facilitate ease of use,  
              50.59 evaluations for the following:
if possible. If you have any questions regarding this information, please call the  
              a.       Changes that have been made under the provisions of 10 CFR 50.59 that
inspection team leader as soon as possible.
                        have been updated in accordance with 10 CFR 50.71(e)(4) since the last
(1)
                        MOD/50.59 inspection;
List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59  
              b.       Modifications that are field work complete; and
completed evaluations involving (a) calculations, (b) procedure revisions,
              c.       Changes to calculations (or initiation of new calculations) that have been
(c) changes to the facility (modifications), (d) non-routine operating  
                        issued. The list should contain the number and title of each document, a
configurations, or (e) departures in methods of analyses. This list should include  
                        brief description of the change, and the corresponding number and type
50.59 evaluations for the following:
                        of the affected document (i.e., the modification or procedure to which the
a.
                        evaluation applies). The list should NOT include any evaluations in which
Changes that have been made under the provisions of 10 CFR 50.59 that  
                        prior U.S. Nuclear Regulatory Commission approval was sought and
have been updated in accordance with 10 CFR 50.71(e)(4) since the last  
                        obtained.
MOD/50.59 inspection;
                                                                                          Enclosure
b.
Modifications that are field work complete; and
c.
Changes to calculations (or initiation of new calculations) that have been  
issued. The list should contain the number and title of each document, a  
brief description of the change, and the corresponding number and type  
of the affected document (i.e., the modification or procedure to which the  
evaluation applies). The list should NOT include any evaluations in which  
prior U.S. Nuclear Regulatory Commission approval was sought and  
obtained.


                    DOCUMENT REQUEST FOR 50.59 INSPECTION
DOCUMENT REQUEST FOR 50.59 INSPECTION
    (2)   A list of all 10 CFR 50.59 changes that have been screened out as not requiring
2
          a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
(2)
          to the facility (modifications); (d) non-routine operating configurations; or
A list of all 10 CFR 50.59 changes that have been screened out as not requiring  
          (e) departures in methods of analyses.
a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes  
          The list should contain the number and title of each document, and the
to the facility (modifications); (d) non-routine operating configurations; or  
          corresponding number and type of the affected document (i.e., the modification
(e) departures in methods of analyses.
          or procedure to which the evaluation applies).
The list should contain the number and title of each document, and the  
    (3)   A list of any modifications, procedure revisions, or Updated Final Safety Analysis
corresponding number and type of the affected document (i.e., the modification  
          Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
or procedure to which the evaluation applies).
          apply.
(3)
    (4)   A list of calculation changes that have been issued for use.
A list of any modifications, procedure revisions, or Updated Final Safety Analysis  
    (5)   A list of corrective action documents (open and closed) that address
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not  
          10 CFR 50.59 issues, concerns, or processes. These documents should also
apply.
          include the corrective action documents associated with the modification and the
(4)
          50.59 change implementation.
A list of calculation changes that have been issued for use.
          The list should contain the number, title and revision (or date) of each document,
(5)
          the affected system and corresponding documentation (if applicable), and should
A list of corrective action documents (open and closed) that address
          be sorted in order of significance.
10 CFR 50.59 issues, concerns, or processes. These documents should also  
    (6)   Copies of procedures addressing the following: modifications, design changes,
include the corrective action documents associated with the modification and the
          set point changes, equivalency evaluations or suitability analyses, commercial
50.59 change implementation.
          grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
The list should contain the number, title and revision (or date) of each document,  
          screenings, and UFSAR updates.
the affected system and corresponding documentation (if applicable), and should  
    (7)   UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
be sorted in order of significance.
          copies of the complete submittal.
(6)
    (8)   Copy of the UFSAR change log or a synopsis of the changes. This should
Copies of procedures addressing the following: modifications, design changes,  
          include all of the changes made to the UFSAR that were incorporated in the last
set point changes, equivalency evaluations or suitability analyses, commercial  
          10 CFR 50.71(e)(4) submittal.
grade dedications, post-modification testing, 10 CFR 50.59 evaluations and  
    (9)   Electronic copy of the UFSAR and technical specifications, if available.
screenings, and UFSAR updates.
    (10)   Name(s) and phone numbers for the regulatory and technical contacts.
(7)
    (11)   Current management and engineering organizational chart.
UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide  
II. Information Requested to be Available Prior to Inspection. Requests will be Made
copies of the complete submittal.
    for Specific Item (1) Documents by August 22, 2022, for Availability of Requested
(8)
    Item (1) Documents in Regional Office by September 6, 2022, and Items (2), (3) and
Copy of the UFSAR change log or a synopsis of the changes. This should  
    (4) Documents on First Day of Inspection (September 19, 2022).
include all of the changes made to the UFSAR that were incorporated in the last  
    (1)   Copies of all selected items from Section I. This includes copies of associated
10 CFR 50.71(e)(4) submittal.
          documents such as calculations, modification packages (including description),
(9)
          10 CFR 50.59 evaluations or screenings, and any corrective action documents.
Electronic copy of the UFSAR and technical specifications, if available.
                                                2
(10)
Name(s) and phone numbers for the regulatory and technical contacts.
(11)
Current management and engineering organizational chart.
II.
Information Requested to be Available Prior to Inspection. Requests will be Made  
for Specific Item (1) Documents by August 22, 2022, for Availability of Requested  
Item (1) Documents in Regional Office by September 6, 2022, and Items (2), (3) and  
(4) Documents on First Day of Inspection (September 19, 2022).
(1)
Copies of all selected items from Section I. This includes copies of associated  
documents such as calculations, modification packages (including description),  
10 CFR 50.59 evaluations or screenings, and any corrective action documents.


                        DOCUMENT REQUEST FOR 50.59 INSPECTION
DOCUMENT REQUEST FOR 50.59 INSPECTION
        (2)   Copies of these documents do not need to be solely available to the inspection
3
              team as long as the inspectors have easy and unrestrained access to them.
(2)
              a.     UFSAR, if not previously provided;
Copies of these documents do not need to be solely available to the inspection  
              b.     Original Final Safety Analysis Report (FSAR) Volumes;
team as long as the inspectors have easy and unrestrained access to them.
              c.     Original Safety Evaluation Report and Supplements;
a.
              d.     FSAR Question and Answers;
UFSAR, if not previously provided;
              e.     Quality Assurance (QA) Plan;
b.
              f.     Technical Specifications, if not previously provided;
Original Final Safety Analysis Report (FSAR) Volumes;
              g.     Latest Individual Plant Examination and Probabilistic Risk Assessment
c.
                      Report;
Original Safety Evaluation Report and Supplements;
              h.     Vendor Manuals; and
d.
              i.     The latest 10 CFR 50.59 UFSAR Update Submittal.
FSAR Question and Answers;
        (3)   Please ensure that other supporting documents for the selected items have been
e.
              located and are readily retrievable as the inspection team will likely be requesting
Quality Assurance (QA) Plan;
              these documents during the inspection. Examples of supporting documents are:
f.
              a.     Drawings supporting the modifications;
Technical Specifications, if not previously provided;
              b.     Procedures affected by the modifications; and
g.
              c.     UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
Latest Individual Plant Examination and Probabilistic Risk Assessment  
        (4)   Assessment and Corrective Actions:
Report;
              a.     The most recent 50.59 QA audit and/or self-assessment; and
h.
              b.     Corrective action documents (e.g., condition reports, including status of
Vendor Manuals; and
                      corrective actions) generated as a result of the most recent 50.59 QA
i.
                      audit and/or self-assessment.
The latest 10 CFR 50.59 UFSAR Update Submittal.
III.   Information Requested to be Provided Throughout the Inspection
(3)
        (1)   Copies of any corrective action documents generated as a result of the
Please ensure that other supporting documents for the selected items have been  
              inspection teams questions or queries during this inspection.
located and are readily retrievable as the inspection team will likely be requesting  
        (2)   Copies of the list of questions submitted by the inspection team members and
these documents during the inspection. Examples of supporting documents are:
              the status/resolution of the information requested (provide daily during the
a.
              inspection to each inspection team member).
Drawings supporting the modifications;
If you have any questions regarding the information requested, please contact the inspection
b.
Procedures affected by the modifications; and
c.
UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4)
Assessment and Corrective Actions:
a.
The most recent 50.59 QA audit and/or self-assessment; and
b.
Corrective action documents (e.g., condition reports, including status of  
corrective actions) generated as a result of the most recent 50.59 QA  
audit and/or self-assessment.
III.
Information Requested to be Provided Throughout the Inspection
(1)
Copies of any corrective action documents generated as a result of the  
inspection teams questions or queries during this inspection.
(2)
Copies of the list of questions submitted by the inspection team members and  
the status/resolution of the information requested (provide daily during the  
inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection  
team leader.
team leader.
                                                  3
}}
}}

Latest revision as of 16:35, 27 November 2024

Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection Report 05000440/2022010
ML22182A444
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/02/2022
From: John Bozga
NRC/RGN-III/DRS/EB1
To: Penfield R
Energy Harbor Nuclear Corp
References
IR 2022010
Download: ML22182A444 (6)


See also: IR 05000440/2022010

Text

Mr. Rod Penfield

Site Vice President

Energy Harbor Nuclear Corp.

Perry Nuclear Power Plant

10 Center Road,

Perry, OH 44081

SUBJECT: PERRY NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE

INSPECTION; INSPECTION REPORT 05000440/2022010

Dear Mr. Penfield:

On September 19, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin

a 50.59 Baseline Inspection at the Perry Nuclear Plant. This inspection will be performed in

accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of the

inspection will take place during the week of September 19, 2022.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

The first group of information is necessary to ensure that the inspection team is

adequately prepared for the inspection. This information should be made available via a

secure file sharing system (if available) no later than August 8, 2022. The inspection

team will review this information and, by August 22, 2022, will request specific items that

should be provided for review in the regional office by September 6, 2022.

The second group of requested documents contains additional items that the team will

review, or need access to, during the inspection. Certain documents contained within

Group II (i.e., Item (1)), will be requested for review in the regional office prior to the

inspection by September 6, 2022, as identified above. The remaining documents should

be available by the first day of the onsite inspection, September 19, 2022.

The third group lists information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

July 2, 2022

R. Penfield

- 2 -

The lead inspector for this inspection is Mr. J. V. Bozga. We understand that our licensing

contact for this inspection is Mr. G. Dujanovic of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9613.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

John V. Bozga, Senior Reactor Inspector

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-440

License No. NPF-58

Enclosure:

Document Request for 50.59

Inspection

cc: Distribution via LISTSERV

Signed by Bozga, John

on 07/02/22

R. Penfield

- 3 -

Letter to Rod Penfield from John V. Bozga dated July 2, 2022.

SUBJECT: PERRY NUCLEAR PLANTINFORMATION REQUEST FOR NRC TRIENNIAL

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE

INSPECTION; INSPECTION REPORT 05000440/2022010

DISTRIBUTION:

Jessie Quichocho

Robert Orlikowski

RidsNrrPMPerry Resource

RidsNrrDorlLpl3

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Shelbie Lewman

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML22182A444

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JBozga:mb

DATE

07/02/2022

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR 50.59 INSPECTION

Enclosure

Inspection Report: 05000440/2022010

Inspection Dates:

September 19-September 23, 2022

Inspection Procedures:

71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector:

John V. Bozga

630-829-9613

I.

Information Requested for In-Office Preparation Week

The following information is requested by August 8, 2022, or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspection team will select specific items from the information requested below and

submit a list to your staff by August 22, 2022. We will request that certain items be

made available to the regional office prior to the inspection by September 6, 2022. We

request that the remaining items selected from the lists be available and ready for review

on the first day of inspection. All requested information should identify the associated

system and cover the time frame from the receipt of information for the last MOD/50.59

inspection to the present.

The required information identified below should be provided via a secure file sharing

system (if available). Please provide each inspector access to the secure file sharing

system (if available). The preferred file format is a searchable pdf file. The secure file

sharing system (if available) should be indexed and hyper-linked to facilitate ease of use,

if possible. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

(1)

List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59

completed evaluations involving (a) calculations, (b) procedure revisions,

(c) changes to the facility (modifications), (d) non-routine operating

configurations, or (e) departures in methods of analyses. This list should include

50.59 evaluations for the following:

a.

Changes that have been made under the provisions of 10 CFR 50.59 that

have been updated in accordance with 10 CFR 50.71(e)(4) since the last

MOD/50.59 inspection;

b.

Modifications that are field work complete; and

c.

Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a

brief description of the change, and the corresponding number and type

of the affected document (i.e., the modification or procedure to which the

evaluation applies). The list should NOT include any evaluations in which

prior U.S. Nuclear Regulatory Commission approval was sought and

obtained.

DOCUMENT REQUEST FOR 50.59 INSPECTION

2

(2)

A list of all 10 CFR 50.59 changes that have been screened out as not requiring

a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes

to the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and title of each document, and the

corresponding number and type of the affected document (i.e., the modification

or procedure to which the evaluation applies).

(3)

A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not

apply.

(4)

A list of calculation changes that have been issued for use.

(5)

A list of corrective action documents (open and closed) that address

10 CFR 50.59 issues, concerns, or processes. These documents should also

include the corrective action documents associated with the modification and the

50.59 change implementation.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(6)

Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, post-modification testing, 10 CFR 50.59 evaluations and

screenings, and UFSAR updates.

(7)

UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide

copies of the complete submittal.

(8)

Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(9)

Electronic copy of the UFSAR and technical specifications, if available.

(10)

Name(s) and phone numbers for the regulatory and technical contacts.

(11)

Current management and engineering organizational chart.

II.

Information Requested to be Available Prior to Inspection. Requests will be Made

for Specific Item (1) Documents by August 22, 2022, for Availability of Requested

Item (1) Documents in Regional Office by September 6, 2022, and Items (2), (3) and

(4) Documents on First Day of Inspection (September 19, 2022).

(1)

Copies of all selected items from Section I. This includes copies of associated

documents such as calculations, modification packages (including description),

10 CFR 50.59 evaluations or screenings, and any corrective action documents.

DOCUMENT REQUEST FOR 50.59 INSPECTION

3

(2)

Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a.

UFSAR, if not previously provided;

b.

Original Final Safety Analysis Report (FSAR) Volumes;

c.

Original Safety Evaluation Report and Supplements;

d.

FSAR Question and Answers;

e.

Quality Assurance (QA) Plan;

f.

Technical Specifications, if not previously provided;

g.

Latest Individual Plant Examination and Probabilistic Risk Assessment

Report;

h.

Vendor Manuals; and

i.

The latest 10 CFR 50.59 UFSAR Update Submittal.

(3)

Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

a.

Drawings supporting the modifications;

b.

Procedures affected by the modifications; and

c.

UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4)

Assessment and Corrective Actions:

a.

The most recent 50.59 QA audit and/or self-assessment; and

b.

Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent 50.59 QA

audit and/or self-assessment.

III.

Information Requested to be Provided Throughout the Inspection

(1)

Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

(2)

Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provide daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.