ML17114A035: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = Emergency Preparedness-Review of Emergency Plan Changes, Letter | | document type = Emergency Preparedness-Review of Emergency Plan Changes, Letter | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:*~- | |||
~-,DUKE | |||
~ ENERGY(; | |||
CNS-17-013 April 19, 2017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 | |||
==Subject:== | |||
Duke Energy Carolinas, LLC Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414 Emergency Plan, Revision 17-1 Tom Simril Vice President Catawba Nuclear Station Duke Energy CN01VP 14800 Concord Road York, SC 29745 o: 803.701.3340 f: 803. 701.3221 tom.simril@duke-energy.com 10CFR 50.54(q) | |||
Enclosed for NRC Staff use is Revision 17-1 to the Catawba Nuclear Station Emergency Plan. All changes have been specifically highlighted (side-barred). This revision is effective on March 20, 2017. | |||
This revision is being submitted in accordance with 10CFR 50.54(q) and is not a reduction in the effectiveness of the Emergency Plan. The 1 OCFR 50.54( q) Evaluations are provided as Attachment 1. | |||
By copy of this letter, two copies of these documents are being provided to the NRC, Region II. | |||
If there are any questions, please contact Tom Arlow at 803-701-4027. | |||
Sincerely, | |||
~~ | |||
Tom Simril Vice President, Catawba Nuclear Station Attachments: | |||
: 1. 1 O.CFR50.54 (q) Evaluation | |||
: 2. Plan update instructions | |||
: 3. Emergency Plan, Revision 17-1 www.duke-energy.com | |||
~ | |||
Catawba Nuclear Station April 19, 2017 Page 2 xc (w/attachments): | |||
Catherine Haney, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 xc (w/o attachments): | |||
Michael Mahoney NRC Project Manager (CNS) | |||
U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 0-8H4A 11555 Rockville Pike Rockville, MD 20852-2738 Joseph D. Austin NRC Senior Resident Inspector (CNS)}} | |||
Latest revision as of 10:21, 9 January 2025
| ML17114A035 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/19/2017 |
| From: | Simril T Duke Energy Carolinas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17114A032 | List: |
| References | |
| CNS-17-013 | |
| Download: ML17114A035 (2) | |
Text
- ~-
~-,DUKE
~ ENERGY(;
CNS-17-013 April 19, 2017 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Duke Energy Carolinas, LLC Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414 Emergency Plan, Revision 17-1 Tom Simril Vice President Catawba Nuclear Station Duke Energy CN01VP 14800 Concord Road York, SC 29745 o: 803.701.3340 f: 803. 701.3221 tom.simril@duke-energy.com 10CFR 50.54(q)
Enclosed for NRC Staff use is Revision 17-1 to the Catawba Nuclear Station Emergency Plan. All changes have been specifically highlighted (side-barred). This revision is effective on March 20, 2017.
This revision is being submitted in accordance with 10CFR 50.54(q) and is not a reduction in the effectiveness of the Emergency Plan. The 1 OCFR 50.54( q) Evaluations are provided as Attachment 1.
By copy of this letter, two copies of these documents are being provided to the NRC, Region II.
If there are any questions, please contact Tom Arlow at 803-701-4027.
Sincerely,
~~
Tom Simril Vice President, Catawba Nuclear Station Attachments:
- 1. 1 O.CFR50.54 (q) Evaluation
- 2. Plan update instructions
- 3. Emergency Plan, Revision 17-1 www.duke-energy.com
~
Catawba Nuclear Station April 19, 2017 Page 2 xc (w/attachments):
Catherine Haney, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 xc (w/o attachments):
Michael Mahoney NRC Project Manager (CNS)
U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 0-8H4A 11555 Rockville Pike Rockville, MD 20852-2738 Joseph D. Austin NRC Senior Resident Inspector (CNS)