                                        NOV 0 31986
.
    Docket No. 50-424
NOV 0 31986
    License No. CPPR-108
Docket No. 50-424
              Power Company
License No. CPPR-108
    Georgia,Mr.
Georgia,Mr. J. H. - Miller, Jr.
    ATTN: V
_
          _
Power Company
                    J. H. - Miller, Jr.
ATTN: V
              President
President
    P. O. Box 4545
P. O. Box 4545
    Atlanta, GA 30302
Atlanta, GA 30302
    Gentlemen:
Gentlemen:
    SUBJECT:   NRC INSPECTION REPORT N0. 50-424/86-92
SUBJECT:
    This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
NRC INSPECTION REPORT N0. 50-424/86-92
    W. J. Ross on September 29 - October 3,1986. The inspection included a review
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
    of activities authorized for your Vogtle facility.       At the conclusion of the
W. J. Ross on September 29 - October 3,1986.
    inspection, the findings were discussed with those members of your staff.-
The inspection included a review
    identified in the enclosed inspection report.
of activities authorized for your Vogtle facility.
    Areas examined during the inspection are identified in the report. Within these
At the conclusion of the
    areas, the inspection consisted of selective examinations of procedures and
inspection, the findings were discussed with those members of your staff.-
    representative records, interviews with personnel, and observation of activities
identified in the enclosed inspection report.
    in progress.
Areas examined during the inspection are identified in the report. Within these
    Within the scope of the inspection, no violations or deviations were identified.
areas, the inspection consisted of selective examinations of procedures and
    In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
representative records, interviews with personnel, and observation of activities
    Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
in progress.
    will be placed in the NRC Public Document Room.
Within the scope of the inspection, no violations or deviations were identified.
    Should you have any questions concerning this letter, please contact us.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
                                                Sincerely,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
    86g11[Q Q $ bbOS24         poa
will be placed in the NRC Public Document Room.
    gD                                        Virgil L. Brownlee, Chief
Should you have any questions concerning this letter, please contact us.
                                              Reactor Projects Branch 3
Sincerely,
                                              DivisionofReactorProjects
86g11[Q Q $ bbOS24
    Enclosure:
gD
    NRC Inspection Report
poa
    cc w/ encl:   (see page 2)
Virgil L. Brownlee, Chief
                .   _ . _ - -                   . .-                       -
Reactor Projects Branch 3
                                                                                  gb( lj I
DivisionofReactorProjects
Enclosure:
NRC Inspection Report
cc w/ encl:
(see page 2)
I
gb(
lj
.
_ . _ - -
.
.-
-
_. _-
-


                                                    i
i
  .     .
.
        Georgia Power Company                   2
.
        cf/ w/ enc 1:
Georgia Power Company
    \/J       P. O'Reilly, Senior Vice President
2
            Nuclear Operations
/
            . E. Conway, Senior Vice President &
cf w/ enc 1:
        f roject
\\/J
            P       Director
P. O'Reilly, Senior Vice President
      W. O. Foster, Vice President, Project
Nuclear Operations
            Support
. E. Conway, Senior Vice President &
    /P.D. Rice,VicePresident, Project'
f roject Director
            Engineering
P
            . H. Pinson, Vice President, Project
W. O. Foster, Vice President, Project
        A onstruction
Support
    vJ. T. Beckham, Vice President &               >
/P.D. Rice,VicePresident, Project'
        j General Manager - Operations
Engineering
      VR. A. Thomas, Vice President,
. H. Pinson, Vice President, Project
        / Licensing
A onstruction
      A). S. Read, General Manager,
vJ. T. Beckham, Vice President &
            Quality Assurance
>
    /C.W. Hayes,VogtleQuality
j General Manager - Operations
    d.AssuranceManager
VR. A. Thomas, Vice President,
              C. Ramsey, Manager -
/ Licensing
        f Readiness Review
A). S. Read, General Manager,
    v fG. B. Bockhold, General Manager,
Quality Assurance
        / Nuclear Operations
/C.W. Hayes,VogtleQuality
    VL. Gucwa, Manager, Nuclear Safety
d.AssuranceManager
    / .and
C. Ramsey, Manager -
        M H.Licensing
f Readiness Review
                  Googe, Project
v G. B. Bockhold, General Manager,
      / Construction Manager
f
    JE.' D. Groover, Quality
/ Nuclear Operations
            Assurance Site Manager -
VL. Gucwa, Manager, Nuclear Safety
      / Construction
/ .and Licensing
              A. Bailey, Project Licensing
M
            Manager
H. Googe, Project
.
/ Construction Manager
        G. F. Trowbridge, Esq., Shaw,
JE.' D. Groover, Quality
t            Pittman, Potts and Trowbridge
Assurance Site Manager -
              W. Churchill, Esq., Shaw,
/ Construction
            Pittman, Potts and Trowbridge
A. Bailey, Project Licensing
          . L. Blake, Jr. , Esq. , Shaw,
Manager
l           Pittman, Potts and Trowbridge
.
              E. Joiner, Troutman, Sanders,
G. F. Trowbridge, Esq., Shaw,
l           Lockerman and Ashmore
Pittman, Potts and Trowbridge
i         . G. Ledbetter, Commissioner,
t
l           Department of Human Resources
W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
. L. Blake, Jr. , Esq. , Shaw,
l
Pittman, Potts and Trowbridge
E. Joiner, Troutman, Sanders,
l
Lockerman and Ashmore
i
. G. Ledbetter, Commissioner,
l
Department of Human Resources
t
t
.H. Badger, Office of Planning
t
t
            .H.  Badger, Office of Planning
and Budget
            and Budget
l
l         . Kirkland, III, Counsel,
. Kirkland, III, Counsel,
;           Office of the Consumer's Utility
;
i'      / Council
Office of the Consumer's Utility
    v'D. Feig, Georgians Against
i
            Nuclear Energy
/ Council
'
v'D. Feig, Georgians Against
Nuclear Energy
,
,
        (cc w/ encl cont'd - see page 3)
(cc w/ encl cont'd - see page 3)
l
l
!
!
!
!


  i
i
    "
"
                -
      .      .
<
            Georgia-Power Ccmpany                    3
        -_  fecw/ enc 1 cont'd)
        v'M. B. Margulies, Esq. , Chairman,
                Atomic Safety and Licensing Board
        -/ Dr.
            Panel  O. H. Paris, Administrative Judge
                Atomic Safety and Licensing Board
              . Panel-
            G. A. Linenberger, Jr. , Administrative Judge
                Atomic Safety and Licensing Board
            / Panel
          vt P. Garde, Citizens Clinic, Director
                Government Accountability Project
                c w/ enc 1:
              . Reis, GS0                                                l
                                                                          '
              . M. Hill, IE
-
-
              . Miller, NRR
.
              . Brach, G50
.
              . Sinkule, RII
Georgia-Power Ccmpany
                  Christnot, RII
3
          ' RC Resident Inspector
<
            Document Control Desk-
fecw/ enc 1 cont'd)
            State of Georgia
-_
                                                                          1
v'M. B. Margulies, Esq. , Chairman,
                                                              .-
Atomic Safety and Licensing Board
                                                                          l
/ Panel
- Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
. Panel-
G. A. Linenberger, Jr. , Administrative Judge
Atomic Safety and Licensing Board
/ Panel
vt P. Garde, Citizens Clinic, Director
Government Accountability Project
c w/ enc 1:
. Reis, GS0
l
. M. Hill, IE
'
. Miller, NRR
-
. Brach, G50
. Sinkule, RII
Christnot, RII
' RC Resident Inspector
Document Control Desk-
State of Georgia
1
.-
l
t
t
                  1/, k                                 4         AAL$
1/, k
            WJRo s:er               DMCollins         JPStohr   MVSinkule
4
AAL$
WJRo s:er
DMCollins
JPStohr
MVSinkule
10//0/86
10/J7/86
10/zf'/86
10
/86
,
,
            10//0/86                10/J7/86          10/zf'/86  10  /86
}}
}}

Latest revision as of 22:58, 5 December 2024

Forwards Insp Rept 50-424/86-92 on 860929-1003.No Violations or Deviations Noted
ML20211J501
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/03/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20211J506 List:
References
NUDOCS 8611110148
Download: ML20211J501 (3)


See also: IR 05000424/1986092

Text

.

.

.

NOV 0 31986

Docket No. 50-424

License No. CPPR-108

Georgia,Mr. J. H. - Miller, Jr.

_

Power Company

ATTN: V

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT N0. 50-424/86-92

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. J. Ross on September 29 - October 3,1986.

The inspection included a review

of activities authorized for your Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff.-

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

86g11[Q Q $ bbOS24

gD

poa

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

DivisionofReactorProjects

Enclosure:

NRC Inspection Report

cc w/ encl:

(see page 2)

I

gb(

lj

.

_ . _ - -

.

.-

-

_. _-

-

i

.

.

Georgia Power Company

2

/

cf w/ enc 1:

\\/J

P. O'Reilly, Senior Vice President

Nuclear Operations

. E. Conway, Senior Vice President &

f roject Director

P

W. O. Foster, Vice President, Project

Support

/P.D. Rice,VicePresident, Project'

Engineering

. H. Pinson, Vice President, Project

A onstruction

vJ. T. Beckham, Vice President &

>

j General Manager - Operations

VR. A. Thomas, Vice President,

/ Licensing

A). S. Read, General Manager,

Quality Assurance

/C.W. Hayes,VogtleQuality

d.AssuranceManager

C. Ramsey, Manager -

f Readiness Review

v G. B. Bockhold, General Manager,

f

/ Nuclear Operations

VL. Gucwa, Manager, Nuclear Safety

/ .and Licensing

M

H. Googe, Project

/ Construction Manager

JE.' D. Groover, Quality

Assurance Site Manager -

/ Construction

A. Bailey, Project Licensing

Manager

.

G. F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

t

W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

. L. Blake, Jr. , Esq. , Shaw,

l

Pittman, Potts and Trowbridge

E. Joiner, Troutman, Sanders,

l

Lockerman and Ashmore

i

. G. Ledbetter, Commissioner,

l

Department of Human Resources

t

.H. Badger, Office of Planning

t

and Budget

l

. Kirkland, III, Counsel,

Office of the Consumer's Utility

i

/ Council

'

v'D. Feig, Georgians Against

Nuclear Energy

,

(cc w/ encl cont'd - see page 3)

l

!

!

i

"

-

.

.

Georgia-Power Ccmpany

3

<

fecw/ enc 1 cont'd)

-_

v'M. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

/ Panel

- Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

. Panel-

G. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

/ Panel

vt P. Garde, Citizens Clinic, Director

Government Accountability Project

c w/ enc 1:

. Reis, GS0

l

. M. Hill, IE

'

. Miller, NRR

-

. Brach, G50

. Sinkule, RII

Christnot, RII

' RC Resident Inspector

Document Control Desk-

State of Georgia

1

.-

l

t

1/, k

4

AAL$

WJRo s:er

DMCollins

JPStohr

MVSinkule

10//0/86

10/J7/86

10/zf'/86

10

/86

,