ML21050A367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML21050A367
| number = ML21050A367
| issue date = 01/01/2021
| issue date = 01/01/2021
| title = imc2201-app-a
| title = Imc2201-app-a
| author name = Keene J
| author name = Keene J
| author affiliation = NRC/NSIR/DSO/SOSB
| author affiliation = NRC/NSIR/DSO/SOSB
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC INSPECTION MANUAL                                               NSIR/DSO INSPECTION MANUAL CHAPTER 2201 APPENDIX A SECURITY BASELINE INSPECTION PROGRAM Effective Date: 01/01/2021 2201-01         PURPOSE This baseline inspection program is part of the U.S. Nuclear Regulatory Commissions (NRC) security inspection program to assess the security performance of operating nuclear power reactor licensees subject to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, 10 CFR Part 26, and NRC imposed requirements, such as orders.
{{#Wiki_filter:Issue Date: 04/22/21 1
2201-02         OBJECTIVES The objectives of the security baseline inspection program are:
2201 Appendix A NRC INSPECTION MANUAL NSIR/DSO INSPECTION MANUAL CHAPTER 2201 APPENDIX A SECURITY BASELINE INSPECTION PROGRAM Effective Date: 01/01/2021 2201-01 PURPOSE This baseline inspection program is part of the U.S. Nuclear Regulatory Commissions (NRC) security inspection program to assess the security performance of operating nuclear power reactor licensees subject to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, 10 CFR Part 26, and NRC imposed requirements, such as orders.
: a. To gather sufficient, factual inspection information to determine whether a licensee is meeting the objective of the security cornerstone, which is to provide assurance that the licensees security programs and protective strategy can protect against the design basis threat of radiological sabotage consistent with the general performance objective of 10 CFR 73.55(b); and that the licensees material control and accounting (MC&A) program includes processes for the control and accountability of special nuclear material to include the identification and notification of theft or loss consistent with 10 CFR Part 74.
2201-02 OBJECTIVES The objectives of the security baseline inspection program are:
: b. To determine the licensees ability to identify, assess the significance of, and effectively correct security issues commensurate with the significance of the issue.
: a.
: c. To verify the accuracy and completeness of performance indicator (PI) data used in conjunction with inspection findings to assess the security performance of power reactor licensees.
To gather sufficient, factual inspection information to determine whether a licensee is meeting the objective of the security cornerstone, which is to provide assurance that the licensees security programs and protective strategy can protect against the design basis threat of radiological sabotage consistent with the general performance objective of 10 CFR 73.55(b); and that the licensees material control and accounting (MC&A) program includes processes for the control and accountability of special nuclear material to include the identification and notification of theft or loss consistent with 10 CFR Part 74.
: d. To provide a mechanism for the NRC to remain cognizant of security status and conditions.
: b.
: e. To identify those significant issues that may have generic applicability or cross-cutting applicability to the safe and secure operation of licensee facilities subject to the requirements of 10 CFR Part 73.
To determine the licensees ability to identify, assess the significance of, and effectively correct security issues commensurate with the significance of the issue.
Issue Date: 04/22/21                              1                                2201 Appendix A
: c.
To verify the accuracy and completeness of performance indicator (PI) data used in conjunction with inspection findings to assess the security performance of power reactor licensees.
: d.
To provide a mechanism for the NRC to remain cognizant of security status and conditions.
: e.
To identify those significant issues that may have generic applicability or cross-cutting applicability to the safe and secure operation of licensee facilities subject to the requirements of 10 CFR Part 73.  


2201-03           APPLICABILITY This inspection manual chapter (IMC) appendix is applicable to all operating commercial power reactor licensees that possess a license under 10 CFR Part 50 or 10 CFR Part 52. The program requirements identified within this document apply to all NRC offices and personnel who are tasked with the inspection and oversight of security performance through the NRCs Reactor Oversight Process (ROP) at nuclear power reactors licensed by the NRC.
Issue Date: 04/22/21 2
2201-04           SCOPE Security baseline inspections provide a sufficient examination of licensee activities in order to monitor licensee performance and to meet the objectives identified above and to assure that licensees security programs are meeting the objectives of the security cornerstone of the ROP.
2201 Appendix A 2201-03 APPLICABILITY This inspection manual chapter (IMC) appendix is applicable to all operating commercial power reactor licensees that possess a license under 10 CFR Part 50 or 10 CFR Part 52. The program requirements identified within this document apply to all NRC offices and personnel who are tasked with the inspection and oversight of security performance through the NRCs Reactor Oversight Process (ROP) at nuclear power reactors licensed by the NRC.
2201-05           RESOURCES The baseline inspection procedures (IPs) and their attachments define the effort and requirements necessary to obtain an adequate assessment of an inspectable area. For resource planning purposes, each baseline IP attachment includes an estimate of the average inspection hours necessary to complete the procedure. These estimates are not goals, standards, or limitations; rather, they are included to assist in planning resource allocations, and will be revised periodically, based on insights gained through the implementation of inspection activity. It is expected that the actual hours required to complete an individual IP at a particular plant will vary from the estimate. See IMC 2515, Light-Water Reactor Inspection Program-Operations Phase, and IMC 2201, Security Inspection Program for Commercial Nuclear Power Reactors, Section 08.02 for additional discussion.
2201-04 SCOPE Security baseline inspections provide a sufficient examination of licensee activities in order to monitor licensee performance and to meet the objectives identified above and to assure that licensees security programs are meeting the objectives of the security cornerstone of the ROP.
2201-05 RESOURCES The baseline inspection procedures (IPs) and their attachments define the effort and requirements necessary to obtain an adequate assessment of an inspectable area. For resource planning purposes, each baseline IP attachment includes an estimate of the average inspection hours necessary to complete the procedure. These estimates are not goals, standards, or limitations; rather, they are included to assist in planning resource allocations, and will be revised periodically, based on insights gained through the implementation of inspection activity. It is expected that the actual hours required to complete an individual IP at a particular plant will vary from the estimate. See IMC 2515, Light-Water Reactor Inspection Program-Operations Phase, and IMC 2201, Security Inspection Program for Commercial Nuclear Power Reactors, Section 08.02 for additional discussion.
The Office of Nuclear Security and Incident Response provide the regional offices with a band of expected effort (approximately +/- 10 percent) for each baseline IP per site as a process control. Regional management is expected to review those situations when inspection effort falls outside of the control bands for possible programmatic insights and recommended changes to the program.
The Office of Nuclear Security and Incident Response provide the regional offices with a band of expected effort (approximately +/- 10 percent) for each baseline IP per site as a process control. Regional management is expected to review those situations when inspection effort falls outside of the control bands for possible programmatic insights and recommended changes to the program.
2201-06           PHILOSOPHY OF THE SECURITY BASELINE INSPECTION PROGRAM The security baseline inspection program provides indication of licensee performance with respect to the implementation of security programs and MC&A processes. The program was developed utilizing risk insights, lessons learned, and a risk-informed approach, where applicable, to determine a comprehensive list of areas to inspect within the security cornerstone of the ROP (see IMCs 2515, 2201, and 0305, Operating Reactor Assessment Program, for additional discussion). The assessment of plant performance relies on information provided by PIs and inspections.
2201-06 PHILOSOPHY OF THE SECURITY BASELINE INSPECTION PROGRAM The security baseline inspection program provides indication of licensee performance with respect to the implementation of security programs and MC&A processes. The program was developed utilizing risk insights, lessons learned, and a risk-informed approach, where applicable, to determine a comprehensive list of areas to inspect within the security cornerstone of the ROP (see IMCs 2515, 2201, and 0305, Operating Reactor Assessment Program, for additional discussion). The assessment of plant performance relies on information provided by PIs and inspections.  
Issue Date: 04/22/21                              2                                2201 Appendix A


2201-07         DESCRIPTION OF SECURITY BASELINE INSPECTION PROGRAM The security baseline inspection program is currently comprised of three parts: inspection of inspectable areas, verification of PI data, and problem identification and resolution.
Issue Date: 04/22/21 3
2201-08         ASSESSING INSPECTION FINDINGS The baseline security significance determination process described in IMC 0609, Appendix E, Security Significance Determination Process, is used for determining the security significance of inspection findings and security-related events. The enforcement process, as defined in the NRC Enforcement Manual, is also applicable to security-related findings.
2201 Appendix A 2201-07 DESCRIPTION OF SECURITY BASELINE INSPECTION PROGRAM The security baseline inspection program is currently comprised of three parts: inspection of inspectable areas, verification of PI data, and problem identification and resolution.
2201-08 ASSESSING INSPECTION FINDINGS The baseline security significance determination process described in IMC 0609, Appendix E, Security Significance Determination Process, is used for determining the security significance of inspection findings and security-related events. The enforcement process, as defined in the NRC Enforcement Manual, is also applicable to security-related findings.
The significance of security inspection findings will be described in inspection reports and their cover letters, as specified in IMC 0611, Power Reactor Inspection Reports, and Exhibit 4. The findings (a redacted description) will also be entered into the Replacement Reactor Program System for tracking, and entered into the Plant Issues Matrix (PIM). This redacted description will not become available to the public through the ROP public Web site, but will be available to internal NRC users. The existence of a security finding will be displayed on the public Web site, but will only be characterized as either green or greater-than-green. Inspectors should still provide the specific significance of a finding when making a PIM entry, but the public Web site will generically display all greater-than-green findings in blue, to withhold the specific significance. In accordance with current agency policy, no other information or details related to security findings will be displayed on the public Web site. Safeguards information (SGI) will not be entered into the PIM. For findings where a full description would require disclosure of SGI, the issue should be described broadly in the PIM at the sensitive, unclassified, non-safeguards information (SUNSI) security-related information level and not include SGI.
The significance of security inspection findings will be described in inspection reports and their cover letters, as specified in IMC 0611, Power Reactor Inspection Reports, and Exhibit 4. The findings (a redacted description) will also be entered into the Replacement Reactor Program System for tracking, and entered into the Plant Issues Matrix (PIM). This redacted description will not become available to the public through the ROP public Web site, but will be available to internal NRC users. The existence of a security finding will be displayed on the public Web site, but will only be characterized as either green or greater-than-green. Inspectors should still provide the specific significance of a finding when making a PIM entry, but the public Web site will generically display all greater-than-green findings in blue, to withhold the specific significance. In accordance with current agency policy, no other information or details related to security findings will be displayed on the public Web site. Safeguards information (SGI) will not be entered into the PIM. For findings where a full description would require disclosure of SGI, the issue should be described broadly in the PIM at the sensitive, unclassified, non-safeguards information (SUNSI) security-related information level and not include SGI.
2201-09         DOCUMENTING INSPECTIONS The purpose of reporting the results of inspections is to document the scope of inspections and any substantive findings in support of the assessment process. Inspections will be documented in accordance with the guidance and requirements in IMC 0611. Security designation requirements will be adhered to for all inspection reports, temporary instructions, orders, etc.,
2201-09 DOCUMENTING INSPECTIONS The purpose of reporting the results of inspections is to document the scope of inspections and any substantive findings in support of the assessment process. Inspections will be documented in accordance with the guidance and requirements in IMC 0611. Security designation requirements will be adhered to for all inspection reports, temporary instructions, orders, etc.,
that contain or have the potential to contain, SGI. These documents shall be marked and controlled in accordance with NRCs Management Directive, Volume 12, Security. If the document does not contain SGI, but does contain security-related information about a specific site or event, then the document will be designated as Official Use Only - Security-Related Information in accordance with the agencys SUNSI policy. The NRCs SUNSI policy can be found at the following Web address. https://drupal.nrc.gov/sunsi Issue Date: 04/22/21                              3                                2201 Appendix A
that contain or have the potential to contain, SGI. These documents shall be marked and controlled in accordance with NRCs Management Directive, Volume 12, Security. If the document does not contain SGI, but does contain security-related information about a specific site or event, then the document will be designated as Official Use Only - Security-Related Information in accordance with the agencys SUNSI policy. The NRCs SUNSI policy can be found at the following Web address. https://drupal.nrc.gov/sunsi  


2201-10       INSPECTION PLANNING
Issue Date: 04/22/21 4
: a. Annual Inspection Planning.
2201 Appendix A 2201-10 INSPECTION PLANNING
: a.
Annual Inspection Planning.
See Attachment 2 to this appendix and IMCs 2201 and 2515 for additional guidance.
See Attachment 2 to this appendix and IMCs 2201 and 2515 for additional guidance.
: b. Resident Inspector Utilization.
: b.
Resident Inspector Utilization.
See IMCs 2201 and 2515 for additional information.
See IMCs 2201 and 2515 for additional information.
: c. Region-Based Inspection Planning.
: c.
Region-Based Inspection Planning.
See IMCs 2201and 2515 for additional information.
See IMCs 2201and 2515 for additional information.
: d. Level of effort.
: d.
Level of effort.
See IMCs 2201 and 2515 for additional information.
See IMCs 2201 and 2515 for additional information.
: e. Adjustments.
: e.
Adjustments.
See IMCs 2201 and 2515 for additional information.
See IMCs 2201 and 2515 for additional information.
: f. Completion status.
: f.
Completion status.
See IMCs 2201and 2515 for additional information.
See IMCs 2201and 2515 for additional information.
END Attachments:
END Attachments:
: 1. Inspectable Area Table
: 1.
: 2. Resource Estimate Table
Inspectable Area Table
: 3. Revision History for IMC 2201, Appendix A Issue Date: 04/22/21                        4                              2201 Appendix A
: 2.
Resource Estimate Table
: 3.
Revision History for IMC 2201, Appendix A  


ATTACHMENT 1 INSPECTABLE AREAS WITHIN THE SECURITY CORNERSTONE The baseline inspection program requires the inspectable areas below be reviewed at each NRC-licensed operating power reactor site. The inspectable areas verify aspects of key attributes of the security cornerstone in the safeguards strategic performance area.
Issue Date: 04/22/21 Att1-1 2201 Appendix A ATTACHMENT 1 INSPECTABLE AREAS WITHIN THE SECURITY CORNERSTONE The baseline inspection program requires the inspectable areas below be reviewed at each NRC-licensed operating power reactor site. The inspectable areas verify aspects of key attributes of the security cornerstone in the safeguards strategic performance area.
Inspectable Area (note 1)
Inspectable Area (note 1)
Access Authorization Program Access Control Program Contingency Response - Force-on-Force Testing Equipment Performance, Testing, and Maintenance Protective Strategy Evaluation Protection of Safeguards Information Security Training Security Plan Changes Fitness-For-Duty Program Cyber Security **
Access Authorization Program Access Control Program Contingency Response - Force-on-Force Testing Equipment Performance, Testing, and Maintenance Protective Strategy Evaluation Protection of Safeguards Information Security Training Security Plan Changes Fitness-For-Duty Program Cyber Security **
Material Control and Accounting Target Set Review Note 1: Temporary instructions will be utilized, as required, to supplant and/or augment the baseline inspection program.
Material Control and Accounting Target Set Review Note 1: Temporary instructions will be utilized, as required, to supplant and/or augment the baseline inspection program.
  **    This inspectable area attachment has not been developed.
This inspectable area attachment has not been developed.
Issue Date: 04/22/21                            Att1-1                          2201 Appendix A


ATTACHMENT 2 BASELINE INSPECTION PROCEDURES AND ESTIMATED RESOURCES Inspection                                                                     Annualized Procedure           Security for Power Reactors - Specific1                   Estimated No.                                (Title)                       Freq. 2   Resources3 71130.01   Access Authorization                                     T             8 71130.02   Access Control                                           A             28 71130.03   Contingency Response - Force-on-Force Testing           T           131 71130.04   Equipment Performance, Testing, and Maintenance         B             18 71130.05   Protective Strategy Evaluation                           T             30 71130.06   Protection of Safeguards Information                   AN             0 71130.07   Security Training                                       B             14 71130.08   Fitness-For-Duty Program                                 T             8 71130.09   Security Plan Changes                                   A             8 71130.10   Cyber Security                                         TBD           TBD 71130.11   Material Control and Accounting                         T             4 71130.14   Review of Power Reactor Target Sets                     T             3 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRC's Ability to Conduct Triennial Force On-Force 92707      Exercises is Limited5                                   AN             -
Issue Date: 04/22/21 Att2-6 2201 Appendix A ATTACHMENT 2 BASELINE INSPECTION PROCEDURES AND ESTIMATED RESOURCES Inspection Procedure No.
Security/Safeguards (Specific) Baseline Sub-Total4                                 252 Inspection                                                                     Annualized Procedure                     Security - Coordinated                           Estimated No.                                (Title)                       Freq.     Resources3 71151     Performance Indicator Verification                       A             4 71152     Identification and Resolution of Problems               A/B           23 71153     Event Follow-up                                         AN             7 Security/Safeguards (Coordinated) Baseline Sub-Total                                 34 Security Cornerstone Baseline Inspection-Annualized Grand Total4                   286 hours Issue Date: 04/22/21                            Att2-6                        2201 Appendix A
Security for Power Reactors - Specific1 (Title)
: 1. Inspection budget funded by NSIR.
Freq. 2 Annualized Estimated Resources3 71130.01 Access Authorization T
: 2. A = Annual, B = Biennial, T = Triennial, Q = Quadrennial, AN = As Needed. See IMC 2201 for definitions.
8 71130.02 Access Control A
: 3. Direct inspection effort (hours), based on conducting the nominal range of inspection requirements within the inspectable area.
28 71130.03 Contingency Response - Force-on-Force Testing T
: 4. Total does not include resident inspector plant status activities that are not considered direct inspection effort. Inspection budget allocation for these inspections will be funded by the Office of Nuclear Reactor Regulation.
131 71130.04 Equipment Performance, Testing, and Maintenance B
: 5. The annualized estimated resource for IP 92707 will utilize resources allocated for IP 71130.03. IP 92707 Inspections will only be conducted if IP 71130.03 cannot be performed. In some cases, due to changing site conditions, it may be necessary to implement IP 92707 to replace the exercise week in IP 71130.03.
18 71130.05 Protective Strategy Evaluation T
Issue Date: 04/22/21                        Att2-7                              2201 Appendix A
30 71130.06 Protection of Safeguards Information AN 0
71130.07 Security Training B
14 71130.08 Fitness-For-Duty Program T
8 71130.09 Security Plan Changes A
8 71130.10 Cyber Security TBD TBD 71130.11 Material Control and Accounting T
4 71130.14 Review of Power Reactor Target Sets T
3 92707 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRC's Ability to Conduct Triennial Force On-Force Exercises is Limited5 AN Security/Safeguards (Specific) Baseline Sub-Total4 252 Inspection Procedure No.
Security - Coordinated (Title)
Freq.
Annualized Estimated Resources3 71151 Performance Indicator Verification A
4 71152 Identification and Resolution of Problems A/B 23 71153 Event Follow-up AN 7
Security/Safeguards (Coordinated) Baseline Sub-Total 34 Security Cornerstone Baseline Inspection-Annualized Grand Total4 286 hours  


ATTACHMENT 3 - Revision History for IMC 2201, Appendix A Commitment    Accession                  Description of Change            Description of    Comment Resolution and Tracking      Number                                                      Training Required Closed Feedback Number        Issue Date                                                   and Completion    Accession Number (Pre-Change Notice                                                Date              Decisional, Non-Public Information)
Issue Date: 04/22/21 Att2-7 2201 Appendix A
N/A      02/19/04      Initial issuance.                                    None                  N/A CN 04-007 N/A       ML073470672  This document is revised to reflect the              None            ML073530003 01/10/08      removal of IP 71130.06 from the Security CN 08-001    Baseline Inspection Program.
: 1.
N/A       ML081440350  This document was revised to remove                  None            ML091380054 09/08/09      references to programs other than operating CN 09-021    power reactors and to update program resource estimates.
Inspection budget funded by NSIR.
N/A      ML093421276  This document has been revised to address            None            ML093421291 01/12/10      the changes to 10 CFR Part 73 that resulted CN 10-002    from a rulemaking; and in accordance with the ROP realignment process.
: 2.
N/A      ML100340615  Effective date changed to 04/01/10.                   None                  N/A 02/24/10 CN 10-007 N/A      ML120930211  This document was revised to reflect                  None            ML12132A340 06/13/12      reintegration of the security cornerstone into CN 12-009    the ROP Action Matrix, and suspension of IMC 0320.
A = Annual, B = Biennial, T = Triennial, Q = Quadrennial, AN = As Needed. See IMC 2201 for definitions.
N/A      ML13234A525  This document has been revised to                     None            Ml15209A579 09/22/15      incorporate minor administrative changes CN 15-017    along with revisions to resource allocations that reflect current program resource implementation.
: 3.
Commitment    Accession                  Description of Change            Description of    Comment Resolution and Tracking      Number                                                      Training Required Closed Feedback Issue Date: 04/22/21                                        Att3-1                                        2201 Appendix A
Direct inspection effort (hours), based on conducting the nominal range of inspection requirements within the inspectable area.
: 4.
Total does not include resident inspector plant status activities that are not considered direct inspection effort. Inspection budget allocation for these inspections will be funded by the Office of Nuclear Reactor Regulation.
: 5.
The annualized estimated resource for IP 92707 will utilize resources allocated for IP 71130.03. IP 92707 Inspections will only be conducted if IP 71130.03 cannot be performed. In some cases, due to changing site conditions, it may be necessary to implement IP 92707 to replace the exercise week in IP 71130.03.  


Number         Issue Date                                                   and Completion Accession Number (Pre-Change Notice                                                Date          Decisional, Non-Public Information)
Issue Date: 04/22/21 Att3-1 2201 Appendix A ATTACHMENT 3 - Revision History for IMC 2201, Appendix A Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Accession Number (Pre-Decisional, Non-Public Information)
N/A           ML16294A078  This document has been revised to reflect     None           ML16294A081 11/09/16     the resource estimate associated with the CN 16-029    conduct of the nominal range of inspection requirements in each inspectable area.
N/A 02/19/04 CN 04-007 Initial issuance.
N/A           ML17306A093 This document was reviewed and updated           N/A            ML17306A094 09/11/18      in response to Staff Requirements - SECY CN 18-031    16-0073 (Options and Recommendations for the Force-On-Force Inspection Program) and the March 2017 Assessment Team (Regions and HQ) review for redundancies and efficiencies of the 71130 series IPs for power reactors. Specifically, this document has been revised to incorporate minor administrative changes along with revisions to resource allocations that reflect current program resource implementation.
None N/A N/A ML073470672 01/10/08 CN 08-001 This document is revised to reflect the removal of IP 71130.06 from the Security Baseline Inspection Program.
None ML073530003 N/A ML081440350 09/08/09 CN 09-021 This document was revised to remove references to programs other than operating power reactors and to update program resource estimates.
None ML091380054 N/A ML093421276 01/12/10 CN 10-002 This document has been revised to address the changes to 10 CFR Part 73 that resulted from a rulemaking; and in accordance with the ROP realignment process.
None ML093421291 N/A ML100340615 02/24/10 CN 10-007 Effective date changed to 04/01/10.
None N/A N/A ML120930211 06/13/12 CN 12-009 This document was revised to reflect reintegration of the security cornerstone into the ROP Action Matrix, and suspension of IMC 0320.
None ML12132A340 N/A ML13234A525 09/22/15 CN 15-017 This document has been revised to incorporate minor administrative changes along with revisions to resource allocations that reflect current program resource implementation.
None Ml15209A579 Commitment Tracking Accession Number Description of Change Description of Training Required Comment Resolution and Closed Feedback
 
Issue Date: 04/22/21 Att3-2 2201 Appendix A Number Issue Date Change Notice and Completion Date Accession Number (Pre-Decisional, Non-Public Information)
N/A ML16294A078 11/09/16 CN 16-029 This document has been revised to reflect the resource estimate associated with the conduct of the nominal range of inspection requirements in each inspectable area.
None ML16294A081 N/A ML17306A093 09/11/18 CN 18-031 This document was reviewed and updated in response to Staff Requirements - SECY 16-0073 (Options and Recommendations for the Force-On-Force Inspection Program) and the March 2017 Assessment Team (Regions and HQ) review for redundancies and efficiencies of the 71130 series IPs for power reactors. Specifically, this document has been revised to incorporate minor administrative changes along with revisions to resource allocations that reflect current program resource implementation.
Additionally, during this revision, a complete SUNSI review was conducted in which the staff concluded that this document should be de-controlled. Consistent with the staffs SUNSI determination, the SUNSI markings of this document have been removed.
Additionally, during this revision, a complete SUNSI review was conducted in which the staff concluded that this document should be de-controlled. Consistent with the staffs SUNSI determination, the SUNSI markings of this document have been removed.
N/A             ML20128J859 This document was changed to add                None          N/A 07/23/20     Inspection Procedure 71130.09 Security CN 20-034    Plan Changes.
N/A ML17306A094 N/A ML20128J859 07/23/20 CN 20-034 This document was changed to add Inspection Procedure 71130.09 Security Plan Changes.
N/A             ML2105A367 This revision of this IMC adds IP 92707 as     N/A            N/A an as-needed baseline inspection.
None N/A N/A ML2105A367 This revision of this IMC adds IP 92707 as an as-needed baseline inspection.
Issue Date: 04/22/21                                        Att3-2                                      2201 Appendix A}}
N/A N/A}}

Latest revision as of 10:58, 29 November 2024

Imc2201-app-a
ML21050A367
Person / Time
Issue date: 01/01/2021
From: Keene J
NRC/NSIR/DSO/SOSB
To:
Todd Keene
Shared Package
ML21112A056 List:
References
Download: ML21050A367 (9)


Text

Issue Date: 04/22/21 1

2201 Appendix A NRC INSPECTION MANUAL NSIR/DSO INSPECTION MANUAL CHAPTER 2201 APPENDIX A SECURITY BASELINE INSPECTION PROGRAM Effective Date: 01/01/2021 2201-01 PURPOSE This baseline inspection program is part of the U.S. Nuclear Regulatory Commissions (NRC) security inspection program to assess the security performance of operating nuclear power reactor licensees subject to the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, 10 CFR Part 26, and NRC imposed requirements, such as orders.

2201-02 OBJECTIVES The objectives of the security baseline inspection program are:

a.

To gather sufficient, factual inspection information to determine whether a licensee is meeting the objective of the security cornerstone, which is to provide assurance that the licensees security programs and protective strategy can protect against the design basis threat of radiological sabotage consistent with the general performance objective of 10 CFR 73.55(b); and that the licensees material control and accounting (MC&A) program includes processes for the control and accountability of special nuclear material to include the identification and notification of theft or loss consistent with 10 CFR Part 74.

b.

To determine the licensees ability to identify, assess the significance of, and effectively correct security issues commensurate with the significance of the issue.

c.

To verify the accuracy and completeness of performance indicator (PI) data used in conjunction with inspection findings to assess the security performance of power reactor licensees.

d.

To provide a mechanism for the NRC to remain cognizant of security status and conditions.

e.

To identify those significant issues that may have generic applicability or cross-cutting applicability to the safe and secure operation of licensee facilities subject to the requirements of 10 CFR Part 73.

Issue Date: 04/22/21 2

2201 Appendix A 2201-03 APPLICABILITY This inspection manual chapter (IMC) appendix is applicable to all operating commercial power reactor licensees that possess a license under 10 CFR Part 50 or 10 CFR Part 52. The program requirements identified within this document apply to all NRC offices and personnel who are tasked with the inspection and oversight of security performance through the NRCs Reactor Oversight Process (ROP) at nuclear power reactors licensed by the NRC.

2201-04 SCOPE Security baseline inspections provide a sufficient examination of licensee activities in order to monitor licensee performance and to meet the objectives identified above and to assure that licensees security programs are meeting the objectives of the security cornerstone of the ROP.

2201-05 RESOURCES The baseline inspection procedures (IPs) and their attachments define the effort and requirements necessary to obtain an adequate assessment of an inspectable area. For resource planning purposes, each baseline IP attachment includes an estimate of the average inspection hours necessary to complete the procedure. These estimates are not goals, standards, or limitations; rather, they are included to assist in planning resource allocations, and will be revised periodically, based on insights gained through the implementation of inspection activity. It is expected that the actual hours required to complete an individual IP at a particular plant will vary from the estimate. See IMC 2515, Light-Water Reactor Inspection Program-Operations Phase, and IMC 2201, Security Inspection Program for Commercial Nuclear Power Reactors, Section 08.02 for additional discussion.

The Office of Nuclear Security and Incident Response provide the regional offices with a band of expected effort (approximately +/- 10 percent) for each baseline IP per site as a process control. Regional management is expected to review those situations when inspection effort falls outside of the control bands for possible programmatic insights and recommended changes to the program.

2201-06 PHILOSOPHY OF THE SECURITY BASELINE INSPECTION PROGRAM The security baseline inspection program provides indication of licensee performance with respect to the implementation of security programs and MC&A processes. The program was developed utilizing risk insights, lessons learned, and a risk-informed approach, where applicable, to determine a comprehensive list of areas to inspect within the security cornerstone of the ROP (see IMCs 2515, 2201, and 0305, Operating Reactor Assessment Program, for additional discussion). The assessment of plant performance relies on information provided by PIs and inspections.

Issue Date: 04/22/21 3

2201 Appendix A 2201-07 DESCRIPTION OF SECURITY BASELINE INSPECTION PROGRAM The security baseline inspection program is currently comprised of three parts: inspection of inspectable areas, verification of PI data, and problem identification and resolution.

2201-08 ASSESSING INSPECTION FINDINGS The baseline security significance determination process described in IMC 0609, Appendix E, Security Significance Determination Process, is used for determining the security significance of inspection findings and security-related events. The enforcement process, as defined in the NRC Enforcement Manual, is also applicable to security-related findings.

The significance of security inspection findings will be described in inspection reports and their cover letters, as specified in IMC 0611, Power Reactor Inspection Reports, and Exhibit 4. The findings (a redacted description) will also be entered into the Replacement Reactor Program System for tracking, and entered into the Plant Issues Matrix (PIM). This redacted description will not become available to the public through the ROP public Web site, but will be available to internal NRC users. The existence of a security finding will be displayed on the public Web site, but will only be characterized as either green or greater-than-green. Inspectors should still provide the specific significance of a finding when making a PIM entry, but the public Web site will generically display all greater-than-green findings in blue, to withhold the specific significance. In accordance with current agency policy, no other information or details related to security findings will be displayed on the public Web site. Safeguards information (SGI) will not be entered into the PIM. For findings where a full description would require disclosure of SGI, the issue should be described broadly in the PIM at the sensitive, unclassified, non-safeguards information (SUNSI) security-related information level and not include SGI.

2201-09 DOCUMENTING INSPECTIONS The purpose of reporting the results of inspections is to document the scope of inspections and any substantive findings in support of the assessment process. Inspections will be documented in accordance with the guidance and requirements in IMC 0611. Security designation requirements will be adhered to for all inspection reports, temporary instructions, orders, etc.,

that contain or have the potential to contain, SGI. These documents shall be marked and controlled in accordance with NRCs Management Directive, Volume 12, Security. If the document does not contain SGI, but does contain security-related information about a specific site or event, then the document will be designated as Official Use Only - Security-Related Information in accordance with the agencys SUNSI policy. The NRCs SUNSI policy can be found at the following Web address. https://drupal.nrc.gov/sunsi

Issue Date: 04/22/21 4

2201 Appendix A 2201-10 INSPECTION PLANNING

a.

Annual Inspection Planning.

See Attachment 2 to this appendix and IMCs 2201 and 2515 for additional guidance.

b.

Resident Inspector Utilization.

See IMCs 2201 and 2515 for additional information.

c.

Region-Based Inspection Planning.

See IMCs 2201and 2515 for additional information.

d.

Level of effort.

See IMCs 2201 and 2515 for additional information.

e.

Adjustments.

See IMCs 2201 and 2515 for additional information.

f.

Completion status.

See IMCs 2201and 2515 for additional information.

END Attachments:

1.

Inspectable Area Table

2.

Resource Estimate Table

3.

Revision History for IMC 2201, Appendix A

Issue Date: 04/22/21 Att1-1 2201 Appendix A ATTACHMENT 1 INSPECTABLE AREAS WITHIN THE SECURITY CORNERSTONE The baseline inspection program requires the inspectable areas below be reviewed at each NRC-licensed operating power reactor site. The inspectable areas verify aspects of key attributes of the security cornerstone in the safeguards strategic performance area.

Inspectable Area (note 1)

Access Authorization Program Access Control Program Contingency Response - Force-on-Force Testing Equipment Performance, Testing, and Maintenance Protective Strategy Evaluation Protection of Safeguards Information Security Training Security Plan Changes Fitness-For-Duty Program Cyber Security **

Material Control and Accounting Target Set Review Note 1: Temporary instructions will be utilized, as required, to supplant and/or augment the baseline inspection program.

This inspectable area attachment has not been developed.

Issue Date: 04/22/21 Att2-6 2201 Appendix A ATTACHMENT 2 BASELINE INSPECTION PROCEDURES AND ESTIMATED RESOURCES Inspection Procedure No.

Security for Power Reactors - Specific1 (Title)

Freq. 2 Annualized Estimated Resources3 71130.01 Access Authorization T

8 71130.02 Access Control A

28 71130.03 Contingency Response - Force-on-Force Testing T

131 71130.04 Equipment Performance, Testing, and Maintenance B

18 71130.05 Protective Strategy Evaluation T

30 71130.06 Protection of Safeguards Information AN 0

71130.07 Security Training B

14 71130.08 Fitness-For-Duty Program T

8 71130.09 Security Plan Changes A

8 71130.10 Cyber Security TBD TBD 71130.11 Material Control and Accounting T

4 71130.14 Review of Power Reactor Target Sets T

3 92707 Security Inspection of Facilities Impacted by a Local, State, or Federal Emergency Where the NRC's Ability to Conduct Triennial Force On-Force Exercises is Limited5 AN Security/Safeguards (Specific) Baseline Sub-Total4 252 Inspection Procedure No.

Security - Coordinated (Title)

Freq.

Annualized Estimated Resources3 71151 Performance Indicator Verification A

4 71152 Identification and Resolution of Problems A/B 23 71153 Event Follow-up AN 7

Security/Safeguards (Coordinated) Baseline Sub-Total 34 Security Cornerstone Baseline Inspection-Annualized Grand Total4 286 hours0.00331 days <br />0.0794 hours <br />4.728836e-4 weeks <br />1.08823e-4 months <br />

Issue Date: 04/22/21 Att2-7 2201 Appendix A

1.

Inspection budget funded by NSIR.

2.

A = Annual, B = Biennial, T = Triennial, Q = Quadrennial, AN = As Needed. See IMC 2201 for definitions.

3.

Direct inspection effort (hours), based on conducting the nominal range of inspection requirements within the inspectable area.

4.

Total does not include resident inspector plant status activities that are not considered direct inspection effort. Inspection budget allocation for these inspections will be funded by the Office of Nuclear Reactor Regulation.

5.

The annualized estimated resource for IP 92707 will utilize resources allocated for IP 71130.03. IP 92707 Inspections will only be conducted if IP 71130.03 cannot be performed. In some cases, due to changing site conditions, it may be necessary to implement IP 92707 to replace the exercise week in IP 71130.03.

Issue Date: 04/22/21 Att3-1 2201 Appendix A ATTACHMENT 3 - Revision History for IMC 2201, Appendix A Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Required and Completion Date Comment Resolution and Closed Feedback Accession Number (Pre-Decisional, Non-Public Information)

N/A 02/19/04 CN 04-007 Initial issuance.

None N/A N/A ML073470672 01/10/08 CN 08-001 This document is revised to reflect the removal of IP 71130.06 from the Security Baseline Inspection Program.

None ML073530003 N/A ML081440350 09/08/09 CN 09-021 This document was revised to remove references to programs other than operating power reactors and to update program resource estimates.

None ML091380054 N/A ML093421276 01/12/10 CN 10-002 This document has been revised to address the changes to 10 CFR Part 73 that resulted from a rulemaking; and in accordance with the ROP realignment process.

None ML093421291 N/A ML100340615 02/24/10 CN 10-007 Effective date changed to 04/01/10.

None N/A N/A ML120930211 06/13/12 CN 12-009 This document was revised to reflect reintegration of the security cornerstone into the ROP Action Matrix, and suspension of IMC 0320.

None ML12132A340 N/A ML13234A525 09/22/15 CN 15-017 This document has been revised to incorporate minor administrative changes along with revisions to resource allocations that reflect current program resource implementation.

None Ml15209A579 Commitment Tracking Accession Number Description of Change Description of Training Required Comment Resolution and Closed Feedback

Issue Date: 04/22/21 Att3-2 2201 Appendix A Number Issue Date Change Notice and Completion Date Accession Number (Pre-Decisional, Non-Public Information)

N/A ML16294A078 11/09/16 CN 16-029 This document has been revised to reflect the resource estimate associated with the conduct of the nominal range of inspection requirements in each inspectable area.

None ML16294A081 N/A ML17306A093 09/11/18 CN 18-031 This document was reviewed and updated in response to Staff Requirements - SECY 16-0073 (Options and Recommendations for the Force-On-Force Inspection Program) and the March 2017 Assessment Team (Regions and HQ) review for redundancies and efficiencies of the 71130 series IPs for power reactors. Specifically, this document has been revised to incorporate minor administrative changes along with revisions to resource allocations that reflect current program resource implementation.

Additionally, during this revision, a complete SUNSI review was conducted in which the staff concluded that this document should be de-controlled. Consistent with the staffs SUNSI determination, the SUNSI markings of this document have been removed.

N/A ML17306A094 N/A ML20128J859 07/23/20 CN 20-034 This document was changed to add Inspection Procedure 71130.09 Security Plan Changes.

None N/A N/A ML2105A367 This revision of this IMC adds IP 92707 as an as-needed baseline inspection.

N/A N/A