NUREG-0930, Forwards SER Accepting WCAP-11145, Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study W/Notrump Code, for Ref Resolution of TMI Item II.K.3.31.Publication Per NUREG-0930 Requested: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:_
L. D. Butterfield, Chairman Westinghouse Owners Group               g0T 0 G N Commonwealth Edison P. O. Box 767 Chicago, Illinois 60690
L. D. Butterfield, Chairman Westinghouse Owners Group g0T 0 G N Commonwealth Edison P. O. Box 767 Chicago, Illinois 60690


==Dear Mr. Butterfield:==
==Dear Mr. Butterfield:==
==Subject:==
==Subject:==
Acceptance for Referencing of Licensing Topical Report WCAP-11145 The Nuclear Regulatory Commission (NRC) staff has completed its review of Topical Report WCAP-11145, " Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with the NOTRUMP Code," which was submitted with your {{letter dated|date=June 11, 1986|text=letter dated June 11, 1986}}. We find the results of the generic study to be acceptable for referencing for the resolution of NUREG-0737 Item II.K.3.31 to the' extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of this report.
Acceptance for Referencing of Licensing Topical Report WCAP-11145 The Nuclear Regulatory Commission (NRC) staff has completed its review of Topical Report WCAP-11145, " Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with the NOTRUMP Code," which was submitted with your {{letter dated|date=June 11, 1986|text=letter dated June 11, 1986}}. We find the results of the generic study to be acceptable for referencing for the resolution of NUREG-0737 Item II.K.3.31 to the' extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of this report.
Line 30: Line 29:
In accordance with procedures established in NUREG-0390, it is requested that you publish an accepted version of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed evaluation after the title page. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
In accordance with procedures established in NUREG-0390, it is requested that you publish an accepted version of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed evaluation after the title page. The accepted versions shall include an -A (designating accepted) following the report identification symbol.
Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, the Westinghouse Owners Group and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.
Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, the Westinghouse Owners Group and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.
Sincerely, Ori:1un1 algcadby oigpgp gjh     PDR Charles E. Rossi, Assistant Director Division of PWR Licensing-A C
Sincerely, Ori:1un1 algcadby oigpgp gjh Charles E. Rossi, Assistant Director PDR Division of PWR Licensing-A C
Office of Nuclear Reactor Regulation
Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
DISTRIBUTION:
DISTRIBUTION:
As stated                       eCentrabFUe J RSB RDG AD RF CBerlinger NRC PDR DPLA RF p
As stated eCentrabFUe J AD RF NRC PDR p
JWatt                 LBell         BClayton         -
RSB RDG CBerlinger DPLA RF JWatt LBell BClayton
        *S     Previous Concurrence R5     W -A                     RSB:PWR-A         RSB:PWR-A       WR   AD     .
*S Previous Concurrence R5 W -A RSB:PWR-A RSB:PWR-A WR AD
        *LBell:sl                       *JWilson         *LBerlinger                   (
*LBell:sl
19/6/86               86         9/F/86         /@/1/86         /#///86}}
*JWilson
*LBerlinger
(
19/6/86 86 9/F/86
/@/1/86
/#///86}}

Latest revision as of 23:26, 3 December 2024

Forwards SER Accepting WCAP-11145, Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study W/Notrump Code, for Ref Resolution of TMI Item II.K.3.31.Publication Per NUREG-0930 Requested
ML20215F961
Person / Time
Issue date: 10/06/1986
From: Rossi C
Office of Nuclear Reactor Regulation
To: Butterfield L
COMMONWEALTH EDISON CO., WESTINGHOUSE OPERATING PLANTS OWNERS GROUP
Shared Package
ML20215F964 List:
References
RTR-NUREG-0737, RTR-NUREG-0930, RTR-NUREG-737, RTR-NUREG-930, TASK-2.K.3.30, TASK-2.K.3.31, TASK-TM TAC-57575, NUDOCS 8610160434
Download: ML20215F961 (1)


Text

_

L. D. Butterfield, Chairman Westinghouse Owners Group g0T 0 G N Commonwealth Edison P. O. Box 767 Chicago, Illinois 60690

Dear Mr. Butterfield:

Subject:

Acceptance for Referencing of Licensing Topical Report WCAP-11145 The Nuclear Regulatory Commission (NRC) staff has completed its review of Topical Report WCAP-11145, " Westinghouse Small Break LOCA ECCS Evaluation Model Generic Study with the NOTRUMP Code," which was submitted with your letter dated June 11, 1986. We find the results of the generic study to be acceptable for referencing for the resolution of NUREG-0737 Item II.K.3.31 to the' extent specified and under the limitations delineated in the report and the associated NRC evaluation, which is enclosed. The evaluation defines the basis for acceptance of this report.

We do not intend to. repeat our review of the matters described in the report and found acceptable when the report appears as a reference in license applications, except to assure that the material presented is applicable to the specific plant involved. Our acceptance applies only to the matters described in the report.

In accordance with procedures established in NUREG-0390, it is requested that you publish an accepted version of this report, proprietary and non-proprietary, within three months of receipt of this letter. The accepted version shall incorporate this letter and the enclosed evaluation after the title page. The accepted versions shall include an -A (designating accepted) following the report identification symbol.

Should our criteria or regulations change such that our conclusions as to the acceptability of the report are invalidated, the Westinghouse Owners Group and/or the applicants referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for the continued effective applicability of the topical report without revision of their respective documentation.

Sincerely, Ori:1un1 algcadby oigpgp gjh Charles E. Rossi, Assistant Director PDR Division of PWR Licensing-A C

Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION:

As stated eCentrabFUe J AD RF NRC PDR p

RSB RDG CBerlinger DPLA RF JWatt LBell BClayton

  • S Previous Concurrence R5 W -A RSB:PWR-A RSB:PWR-A WR AD
  • LBell:sl
  • JWilson
  • LBerlinger

(

19/6/86 86 9/F/86

/@/1/86

/#///86