ML20247G550: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. ,.
{{#Wiki_filter:.,.
10 CPR 50.54(f)
10 CPR 50.54(f) f ;,
        ._. f ;,
a.:
      ..      a.:
GL 89-08
GL 89-08                   ,;.
-PHILADELPHIA ELECTRIC COMPANY 23o1 MARKET STREET P.O. BOX 8699 PHILADELPHIA A. PA.15 HOI
                                                  -PHILADELPHIA ELECTRIC COMPANY 23o1 MARKET STREET P.O. BOX 8699 PHILADELPHIA A. PA.15 HOI                                 {
{
(215) 841-4502 S. J. KOWALSKI VICE PRESIDENT                                                                               i
(215) 841-4502 S. J. KOWALSKI VICE PRESIDENT i
                      . u um . . . . . . . . .
j
j July 21, 1989 Docket Nos. 50-277               l 50-278             '
. u um.........
50-352 50-353 License Nos. DPR-44 DPR-56           -'
July 21, 1989 Docket Nos. 50-277 l
NPF-39 NPF-84 i
50-278 50-352 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-84 i
                  .U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555                                                                             !
.U.S.
1
Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 1


==SUBJECT:==
==SUBJECT:==
Peach Bottom Atomic Power Station Units 2 and 3 Limerick Generating Station Units 1 and 2 Generic Letter 89-08, " Erosion / Corrosion - Induced
Peach Bottom Atomic Power Station Units 2 and 3 Limerick Generating Station Units 1 and 2 Generic Letter 89-08, " Erosion / Corrosion - Induced
                                            . Pipe Wall Thinning"
. Pipe Wall Thinning"
                  ' Gentlemen:                                                                                       J NRC Generic Letter (GL) 89-08, " Erosion / Corrosion - Induced               j Pipe Wall Thinning," dated May 2, 1989, required Philadelphia l                   Electric Company (PECo) to submit a response, as specified in 10 CFR l
' Gentlemen:
50.54(f), providing assurances that a program, consisting of systematic measures to ensure that erosion / corrosion does not lead to degradation of single phase and two phase high-energy carbon steel systemu has been or will be implemented at our nuclear stations. GL 89-08 also directed that our response should include information on whether or not we have implemented or intend to implement a long-term erosion / corrosion monitoring program that provides assurances that procedures or administrative controls are
J NRC Generic Letter (GL) 89-08, " Erosion / Corrosion - Induced j
                    .in place to assure that'the Nuclear Utility Management and Resources Council (NUMARC) program or other equally effective program is Aool 8907280105 890721 PDR                                                                                 !
Pipe Wall Thinning," dated May 2, 1989, required Philadelphia l
P ADOCK 05000277                                                     #
Electric Company (PECo) to submit a response, as specified in 10 CFR l
I      i PDC f       l a
50.54(f), providing assurances that a program, consisting of systematic measures to ensure that erosion / corrosion does not lead to degradation of single phase and two phase high-energy carbon steel systemu has been or will be implemented at our nuclear stations.
GL 89-08 also directed that our response should include information on whether or not we have implemented or intend to implement a long-term erosion / corrosion monitoring program that provides assurances that procedures or administrative controls are
.in place to assure that'the Nuclear Utility Management and Resources Council (NUMARC) program or other equally effective program is Aool 8907280105 890721 PDR ADOCK 05000277 I
i f
l P
PDC a


i'Docum5nt.ControlEDesk h g. ) ,-
h g. ),-
July 21, 1989             i l-       7 j;       ,
i'Docum5nt.ControlEDesk July 21, 1989 i
Page 2   g Q
l-7 j;
Implementedandthestructuralintegrityofallhigh.energycarbbn                                   !
Page 2 g
1
Q Implementedandthestructuralintegrityofallhigh.energycarbbn 1
              -steel systems is' maintained.
-steel systems is' maintained.
Our' response,:provided in-the attachment, gives otir'
Our' response,:provided in-the attachment, gives otir'
      )\         assurance,that a program, composed'of procedures, assures long-term implementation of erosion / corrosion monitoring of appropriate piping
)\\
        \;                                                                                                      I
assurance,that a program, composed'of procedures, assures long-term
                .and components. ~Furthermore,-program enhancements, described in the atthched response, will be accomplished in a timely manner.
\\;
implementation of erosion / corrosion monitoring of appropriate piping I
.and components. ~Furthermore,-program enhancements, described in the atthched response, will be accomplished in a timely manner.
If you-have any questions, or require additional information, please contact us.
If you-have any questions, or require additional information, please contact us.
l very truly yours,
l very truly yours,
              -Attachment
-Attachment
                                                                                                                .)
.)
cc:     , W. T< Russell', Administrator, Region I, USNRC T. 'P. Johnson, USNRC Senior Resident Inspector, PBAPS T; J. . Kenny, USNRC Senior Resident Inspector, LGS T..,E.       Magette, State of-Maryland J. . Urban,'Delmarva Power R. A. Burricelli,-Public Service' Electric'& Gas H. C. Schwemm,. Atlantic Electric-T. M. Gerusky, Commonwealth of-Pennsylvania
cc:
\;                                                                                                               !
, W. T< Russell', Administrator, Region I, USNRC
4 g .. .
'P. Johnson, USNRC Senior Resident Inspector, PBAPS T.
T; J.. Kenny, USNRC Senior Resident Inspector, LGS T..,E. Magette, State of-Maryland J.. Urban,'Delmarva Power R. A. Burricelli,-Public Service' Electric'& Gas H. C. Schwemm,. Atlantic Electric-T. M. Gerusky, Commonwealth of-Pennsylvania
\\;
4 g...


y
y 3
                      .                                                                                              3 A
A COMMONWEALTH OF PENNSYLVANIA :
COMMONWEALTH OF PENNSYLVANIA :
l ss.
l
. CHESTER COUNTY S. J..Kowalski, being first' duly sworn, deposes and says:
:- ss.
I i
                              . CHESTER COUNTY                                 :
S. J. .Kowalski, being first' duly sworn, deposes and says:       I i
l That.he is Vice' President-~of Philadelphia Electric Company; i
l That.he is Vice' President-~of Philadelphia Electric Company; i
the Applicant herein; that he has read the foregoing response to Generic. Letter 89-08, and knows the contents thereof; and that the
the Applicant herein; that he has read the foregoing response to Generic. Letter 89-08, and knows the contents thereof; and that the
                              - statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
- statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.
A' t
A' t
Vice President l
Vice President l
Subscribed and sworn to N
Subscribed and sworn to N
before nie this1I day of       2       - 1989.
before nie this1I day of 2
                                  ,/LYTkEh/sd]Ye ll &nbs Notary Public NOTARIAL SEAL           .
- 1989.
CATHERINE A MENDEL Notary Public Media Boro. Delaware Co.'       ,
,/LYTkEh/sd]Ye ll &nbs Notary Public NOTARIAL SEAL CATHERINE A MENDEL Notary Public Media Boro. Delaware Co.'
My Commiss!on Expires Sept 4,1989 1
My Commiss!on Expires Sept 4,1989 1
__m-_____.__                           -  x           - - - - -  - - -
__m-_____.__
x
 
I ATTACHMENT l
PEACH BO'1"POM ATOMIC POWER STATION, UNITS 2 AND 3 LIMERICK GENERATING STATION, UNITS 1 AND 2 RESPONSE TO NRC GENERIC LETTER 89-08
" EROSION / CORROSION - INDUCED PIPE WALL THINNING" l
l


I ATTACHMENT                              !
===RESPONSE===
l PEACH BO'1"POM ATOMIC POWER STATION, UNITS 2 AND 3 LIMERICK GENERATING STATION, UNITS 1 AND 2 RESPONSE TO NRC GENERIC LETTER 89-08
The Philadelphia Electric Company does have an j
                                                      " EROSION / CORROSION - INDUCED PIPE WALL THINNING" l
established long-term erosion / corrosion monitoring a
l RESPONSE: The Philadelphia Electric Company does have an         j established long-term erosion / corrosion monitoring   a program for Limerick Generating Station (LGS), Units 1 j and 2, and for Peach Bottom Atomic Power Station         I (PBAPS), Units 2 and 3. The programs assure that the structural integrity of high-energy single-phase and two phase carbon steel systems is maintained.
program for Limerick Generating Station (LGS), Units 1 j
The Limerick Generating Station Erosion / Corrosion   !
and 2, and for Peach Bottom Atomic Power Station I
Program is described in Specification P-508, " Nuclear Engineering Department Specification for Limerick     j Generating Station Units 1 and 2 - Program for Monitoring Pipe for Wall Thinning due to Erosion / Corrosion." This specification is in place and being implemented. It provides criteria for the following:
(PBAPS), Units 2 and 3.
o     Identifying the single phase and two phase lines to be included in the program.
The programs assure that the structural integrity of high-energy single-phase and two phase carbon steel systems is maintained.
o     Selecting the single-phase and two phase inspection locations.
The Limerick Generating Station Erosion / Corrosion Program is described in Specification P-508, " Nuclear Engineering Department Specification for Limerick j
o                                                      )
Generating Station Units 1 and 2 - Program for Monitoring Pipe for Wall Thinning due to Erosion / Corrosion."
Determining the frequency of inspections.       '
This specification is in place and being implemented.
o     Determining appropriate acceptance criteria.     !
It provides criteria for the following:
o     Calculating the estimated remaining life of pipe and fittings.
o Identifying the single phase and two phase lines to be included in the program.
o     Determining the method of_ inspections.
o Selecting the single-phase and two phase inspection locations.
o     Determining necessary corrective actions.       I Furthermore, the LGS specification includes Appendices which:
)
o     identify the single phase and two phase lines   .
Determining the frequency of inspections.
included in the program,                         !
o o
i' o    identify pipe and fittings to be inspected, l
Determining appropriate acceptance criteria.
                                                              .                                            I
o Calculating the estimated remaining life of pipe and fittings.
o Determining the method of_ inspections.
o Determining necessary corrective actions.
I Furthermore, the LGS specification includes Appendices which:
o identify the single phase and two phase lines included in the program, i
identify pipe and fittings to be inspected, o
l I


f
f s
                                        ,,                                                    s yv ..
yv..
PECo Response'.tof89-08
PECo Response'.tof89-08 Attachment
,e                             ,                                                  Attachment I.                                                     Page 2 Lo     provide a five-cycle inspection schedule, and o     provide acceptance criteria.                               I The-Peach Bottom' Atomic Power Station-                           ;
,e I.
Erosion / Corrosion-Program-is described in the
Page 2 Lo provide a five-cycle inspection schedule, and o
                                  " Maintenance' Department Program for Peach Bottom Atomic Power. Station Units 2 and'3 - Inspection of-Piping Subject to Erosion / Corrosion." This program is'         ;
provide acceptance criteria.
in place and is being implemented.. The,PBAPS program provides~information similar to:what is.provided in               ,
I The-Peach Bottom' Atomic Power Station-Erosion / Corrosion-Program-is described in the
the appendices of the LGS Specification; however, it does not provide the detailed engineering. criteria             j which is contained.in the LGS Specification._ In order           ,
" Maintenance' Department Program for Peach Bottom Atomic Power. Station Units 2 and'3 - Inspection of-Piping Subject to Erosion / Corrosion."
to provideouniformity in. the programs at both' LGS and-         )
This program is' in place and is being implemented.. The,PBAPS program provides~information similar to:what is.provided in the appendices of the LGS Specification; however, it does not provide the detailed engineering. criteria j
PBAPS, the PBAPS' program is^being revised and will.be           ')
which is contained.in the LGS Specification._ In order to provideouniformity in. the programs at both' LGS and-
reissued as Specification M-721, " Nuclear Engineering Department Specification for Peach Bottom Atohtic Power Station Units-2 and.3 - Program;for Monitoring Pipe'           l   '
)
  ,                                for Wall Thinning:due to Erosion / Corrosion."' This' Specification will be issued for use by August 31, 4        1990, which is approximately four months prior to the next PBAPS Unit 2 refueling outage.
PBAPS, the PBAPS' program is^being revised and will.be reissued as Specification M-721, " Nuclear Engineering Department Specification for Peach Bottom Atohtic Power Station Units-2 and.3 - Program;for Monitoring Pipe' l
A common inspection procedure is used at LGS and'PBAPS       T for;the ultrasonic'(UT) detection of erosion / corrosion in piping systems. ;This procedure'is NDE-SP-3, "NDE Services Special Procedure for the Ultrasonic Detection?cf Erosion / Corrosion.in Piping Systems."     It provides' criteria for the following:.
for Wall Thinning:due to Erosion / Corrosion."' This' Specification will be issued for use by August 31, 1990, which is approximately four months prior to the 4
o     Marking pipe and fittings to be inspected.
next PBAPS Unit 2 refueling outage.
o     Performing UT inspections.
A common inspection procedure is used at LGS and'PBAPS T
o     Documenting inspection results.
for;the ultrasonic'(UT) detection of erosion / corrosion in piping systems. ;This procedure'is NDE-SP-3, "NDE Services Special Procedure for the Ultrasonic Detection?cf Erosion / Corrosion.in Piping Systems."
Inspections are performed using calibrated equipment           ;
It provides' criteria for the following:.
and qualified and trained personnel.
o Marking pipe and fittings to be inspected.
                                . Baseline inspections of pipe and fittings in single-
o Performing UT inspections.
                                .phaca flow locations have been performed.at LGS Units           ,
o Documenting inspection results.
1 and 2 and PBAPS Units 2 and 3. Baseline inspections           i and several follow-up inspections of pipe and tittings         J in many two phase flow locations have been performed at LGS Unit 1 and PBAPS Unita 2 and 3.       Baseline inspections of some two-phase flow locations are m
Inspections are performed using calibrated equipment and qualified and trained personnel.
. Baseline inspections of pipe and fittings in single-
.phaca flow locations have been performed.at LGS Units 1 and 2 and PBAPS Units 2 and 3.
Baseline inspections i
and several follow-up inspections of pipe and tittings J
in many two phase flow locations have been performed at LGS Unit 1 and PBAPS Unita 2 and 3.
Baseline inspections of some two-phase flow locations are m


  -r                               . .
-r
(                         .
(
            .} , { ~
.}, { ~
                                . .                                                  PECo. Response to 89-08 Attachment Page 3
PECo. Response to 89-08 Attachment Page 3
                                                -scheduled to be performed at LGS Unit.2 prior to-commercial operation.                                             i In addition to having established.long-term eros' ion / corrosion monitoring programs at each of our 4
-scheduled to be performed at LGS Unit.2 prior to-commercial operation.
i In addition to having established.long-term 4
eros' ion / corrosion monitoring programs at each of our
{
{
nuclear. units, we have used upgraded material when             -
nuclear. units, we have used upgraded material when replacing pipe.and fittings and have improved water chemistry to reduce erosion and corrosion rates.
replacing pipe.and fittings and have improved water chemistry to reduce erosion and corrosion rates.
,x.
,x.
CONCLUSION: ; The Philadelphia Electric Company is implementing long-term erosion / corrosion monitoring programs at its Peach Bottom Atomic Station-and' Limerick Generating ~           1 Station. These programs provide assurance that                   '
CONCLUSION:
administrative' controls are in place to assure that the NUMARC program is implemented and that the                     j structural integrity of high energy piping systems is               I maintained in accordance with the intent of NUREG-               l 1344, " Erosion / Corrosion-Induced Pipe Wall Thinning in         l U.S. Nuclear Power Plants."                                       I i
; The Philadelphia Electric Company is implementing long-term erosion / corrosion monitoring programs at its Peach Bottom Atomic Station-and' Limerick Generating ~
1 Station.
These programs provide assurance that administrative' controls are in place to assure that the NUMARC program is implemented and that the j
structural integrity of high energy piping systems is I
maintained in accordance with the intent of NUREG-l 1344, " Erosion / Corrosion-Induced Pipe Wall Thinning in l
U.S. Nuclear Power Plants."
I i
l l
l l
l.
l.
I 4
I 4
' _ _ . _ _ . _ _ . . - - - ._-_Ll_-
' _ _. _ _. _ _.. - - -. __-_Ll_-
.                             _        -}}
.}}

Latest revision as of 20:36, 1 December 2024

Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Util Implementing long-term Programs to Ensure That NUMARC Program Will Be Implemented & Structural Integrity of Piping Sys Maintained,Per NUREG-1344
ML20247G550
Person / Time
Site: Peach Bottom, Limerick, 05000000
Issue date: 07/21/1989
From: Kowalski S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1344 GL-89-08, GL-89-8, NUDOCS 8907280105
Download: ML20247G550 (6)


Text

.,.

10 CPR 50.54(f) f ;,

a.:

GL 89-08

-PHILADELPHIA ELECTRIC COMPANY 23o1 MARKET STREET P.O. BOX 8699 PHILADELPHIA A. PA.15 HOI

{

(215) 841-4502 S. J. KOWALSKI VICE PRESIDENT i

j

. u um.........

July 21, 1989 Docket Nos. 50-277 l

50-278 50-352 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-84 i

.U.S.

Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 1

SUBJECT:

Peach Bottom Atomic Power Station Units 2 and 3 Limerick Generating Station Units 1 and 2 Generic Letter 89-08, " Erosion / Corrosion - Induced

. Pipe Wall Thinning"

' Gentlemen:

J NRC Generic Letter (GL) 89-08, " Erosion / Corrosion - Induced j

Pipe Wall Thinning," dated May 2, 1989, required Philadelphia l

Electric Company (PECo) to submit a response, as specified in 10 CFR l

50.54(f), providing assurances that a program, consisting of systematic measures to ensure that erosion / corrosion does not lead to degradation of single phase and two phase high-energy carbon steel systemu has been or will be implemented at our nuclear stations.

GL 89-08 also directed that our response should include information on whether or not we have implemented or intend to implement a long-term erosion / corrosion monitoring program that provides assurances that procedures or administrative controls are

.in place to assure that'the Nuclear Utility Management and Resources Council (NUMARC) program or other equally effective program is Aool 8907280105 890721 PDR ADOCK 05000277 I

i f

l P

PDC a

h g. ),-

i'Docum5nt.ControlEDesk July 21, 1989 i

l-7 j;

Page 2 g

Q Implementedandthestructuralintegrityofallhigh.energycarbbn 1

-steel systems is' maintained.

Our' response,:provided in-the attachment, gives otir'

)\\

assurance,that a program, composed'of procedures, assures long-term

\\;

implementation of erosion / corrosion monitoring of appropriate piping I

.and components. ~Furthermore,-program enhancements, described in the atthched response, will be accomplished in a timely manner.

If you-have any questions, or require additional information, please contact us.

l very truly yours,

-Attachment

.)

cc:

, W. T< Russell', Administrator, Region I, USNRC

'P. Johnson, USNRC Senior Resident Inspector, PBAPS T.

T; J.. Kenny, USNRC Senior Resident Inspector, LGS T..,E. Magette, State of-Maryland J.. Urban,'Delmarva Power R. A. Burricelli,-Public Service' Electric'& Gas H. C. Schwemm,. Atlantic Electric-T. M. Gerusky, Commonwealth of-Pennsylvania

\\;

4 g...

y 3

A COMMONWEALTH OF PENNSYLVANIA :

l ss.

. CHESTER COUNTY S. J..Kowalski, being first' duly sworn, deposes and says:

I i

l That.he is Vice' President-~of Philadelphia Electric Company; i

the Applicant herein; that he has read the foregoing response to Generic. Letter 89-08, and knows the contents thereof; and that the

- statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

A' t

Vice President l

Subscribed and sworn to N

before nie this1I day of 2

- 1989.

,/LYTkEh/sd]Ye ll &nbs Notary Public NOTARIAL SEAL CATHERINE A MENDEL Notary Public Media Boro. Delaware Co.'

My Commiss!on Expires Sept 4,1989 1

__m-_____.__

x

I ATTACHMENT l

PEACH BO'1"POM ATOMIC POWER STATION, UNITS 2 AND 3 LIMERICK GENERATING STATION, UNITS 1 AND 2 RESPONSE TO NRC GENERIC LETTER 89-08

" EROSION / CORROSION - INDUCED PIPE WALL THINNING" l

l

RESPONSE

The Philadelphia Electric Company does have an j

established long-term erosion / corrosion monitoring a

program for Limerick Generating Station (LGS), Units 1 j

and 2, and for Peach Bottom Atomic Power Station I

(PBAPS), Units 2 and 3.

The programs assure that the structural integrity of high-energy single-phase and two phase carbon steel systems is maintained.

The Limerick Generating Station Erosion / Corrosion Program is described in Specification P-508, " Nuclear Engineering Department Specification for Limerick j

Generating Station Units 1 and 2 - Program for Monitoring Pipe for Wall Thinning due to Erosion / Corrosion."

This specification is in place and being implemented.

It provides criteria for the following:

o Identifying the single phase and two phase lines to be included in the program.

o Selecting the single-phase and two phase inspection locations.

)

Determining the frequency of inspections.

o o

Determining appropriate acceptance criteria.

o Calculating the estimated remaining life of pipe and fittings.

o Determining the method of_ inspections.

o Determining necessary corrective actions.

I Furthermore, the LGS specification includes Appendices which:

o identify the single phase and two phase lines included in the program, i

identify pipe and fittings to be inspected, o

l I

f s

yv..

PECo Response'.tof89-08 Attachment

,e I.

Page 2 Lo provide a five-cycle inspection schedule, and o

provide acceptance criteria.

I The-Peach Bottom' Atomic Power Station-Erosion / Corrosion-Program-is described in the

" Maintenance' Department Program for Peach Bottom Atomic Power. Station Units 2 and'3 - Inspection of-Piping Subject to Erosion / Corrosion."

This program is' in place and is being implemented.. The,PBAPS program provides~information similar to:what is.provided in the appendices of the LGS Specification; however, it does not provide the detailed engineering. criteria j

which is contained.in the LGS Specification._ In order to provideouniformity in. the programs at both' LGS and-

)

PBAPS, the PBAPS' program is^being revised and will.be reissued as Specification M-721, " Nuclear Engineering Department Specification for Peach Bottom Atohtic Power Station Units-2 and.3 - Program;for Monitoring Pipe' l

for Wall Thinning:due to Erosion / Corrosion."' This' Specification will be issued for use by August 31, 1990, which is approximately four months prior to the 4

next PBAPS Unit 2 refueling outage.

A common inspection procedure is used at LGS and'PBAPS T

for;the ultrasonic'(UT) detection of erosion / corrosion in piping systems. ;This procedure'is NDE-SP-3, "NDE Services Special Procedure for the Ultrasonic Detection?cf Erosion / Corrosion.in Piping Systems."

It provides' criteria for the following:.

o Marking pipe and fittings to be inspected.

o Performing UT inspections.

o Documenting inspection results.

Inspections are performed using calibrated equipment and qualified and trained personnel.

. Baseline inspections of pipe and fittings in single-

.phaca flow locations have been performed.at LGS Units 1 and 2 and PBAPS Units 2 and 3.

Baseline inspections i

and several follow-up inspections of pipe and tittings J

in many two phase flow locations have been performed at LGS Unit 1 and PBAPS Unita 2 and 3.

Baseline inspections of some two-phase flow locations are m

-r

(

.}, { ~

PECo. Response to 89-08 Attachment Page 3

-scheduled to be performed at LGS Unit.2 prior to-commercial operation.

i In addition to having established.long-term 4

eros' ion / corrosion monitoring programs at each of our

{

nuclear. units, we have used upgraded material when replacing pipe.and fittings and have improved water chemistry to reduce erosion and corrosion rates.

,x.

CONCLUSION:

The Philadelphia Electric Company is implementing long-term erosion / corrosion monitoring programs at its Peach Bottom Atomic Station-and' Limerick Generating ~

1 Station.

These programs provide assurance that administrative' controls are in place to assure that the NUMARC program is implemented and that the j

structural integrity of high energy piping systems is I

maintained in accordance with the intent of NUREG-l 1344, " Erosion / Corrosion-Induced Pipe Wall Thinning in l

U.S. Nuclear Power Plants."

I i

l l

l.

I 4

' _ _. _ _. _ _.. - - -. __-_Ll_-

.