ML20249A471: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:I
{{#Wiki_filter:I
                    - - s e      <                                                                          cntergy operations,ine.
- - s cntergy operations,ine.
5                                                             2%ilen Er   C. Ewing, Ill f4JC a afety & Regulatory Affair 6 W3F1-98-0037 A4.05 PR June 11,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
e 5
2%ilen Er C. Ewing, Ill f4JC a afety & Regulatory Affair 6 W3F1-98-0037 A4.05 PR June 11,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555


==Subject:==
==Subject:==
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of May,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Attached is the subject monthly report which covers the operating statistics for the month of May,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Should you have any questions regarding the above, please contact me at                                     /
Should you have any questions regarding the above, please contact me at
(504) 739-6242 or Tim Gaudet at (504) 739-6666.                                                           /
/
Very truly yours,                                                                                             [
(504) 739-6242 or Tim Gaudet at (504) 739-6666.
E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/ PRS /rtk Attachment cc:               E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
/
Very truly yours,
[
E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/ PRS /rtk Attachment cc:
E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),
J.T. Wheelock (INPO Records Center), NRC Resident inspectors Office
J.T. Wheelock (INPO Records Center), NRC Resident inspectors Office 9806160472 980531
                                                          ~
~
9806160472 980531 PDR   ADOCK 05000382 R                     PDR     g
PDR ADOCK 05000382 R
PDR g


NRC MONTHLY OPERATING REPORT
NRC MONTHLY OPERATING REPORT
Line 36: Line 42:
==SUMMARY==
==SUMMARY==
OF OPERATIONS WATERFORD 3 for May,1998 The unit experienced no shutdowns but had one (1) significant, though short-term, power reduction during the reporting period resulting in an average power level of 99.3%.
OF OPERATIONS WATERFORD 3 for May,1998 The unit experienced no shutdowns but had one (1) significant, though short-term, power reduction during the reporting period resulting in an average power level of 99.3%.
    @h? '                                                                                                               Page : 1 of 6
@h? '
Page : 1 of 6


PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for May,1998 There were no pressurizer safety valve failures or challenges experienced during the month.
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for May,1998 There were no pressurizer safety valve failures or challenges experienced during the month.
WR48                                                                                                                 Page : 2 of 6
WR48 Page : 2 of 6


OPERATING DATA REPORT
OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY :
                                                    ,                                                                                                                                              DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS l
D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS l
: 1. Reporting Period                                                                                                                                                   :              May,1998 Gross Hours in Reporting Period                                                                                                                                 :        744
: 1. Reporting Period May,1998 Gross Hours in Reporting Period 744
: 2. Currently Authorized Power Level (MWt)                                                                                                                             -
: 2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :
3,390 Maximum Dependable Capacity (Net MWe) :                                                                                                                                 1,07s Design Electrical Rating                                                                               (Net MWe)                                               :      1,104
1,07s Design Electrical Rating (Net MWe) 1,104
: 3. Power Level to which Restricted (if any) (Net MWe)                                                                                                                                   -
: 3. Power Level to which Restricted (if any) (Net MWe)
N/A 1
N/A 1
: 4. Reason for Restriction (if any)                                                                                                                                     :        N/A l
: 4. Reason for Restriction (if any)
l THIS         YEAR TO MONTH             DATE     CUMULATIVE
N/A l
: 5. Number of Hours Reactor was Crit; cal                                                                                                                                       744.0         3,623.0             94,165.7
l THIS YEAR TO MONTH DATE CUMULATIVE
: 6. Reactor Reserve Shutdown Hours                                                                                                                                               0.0             0.0                 0.0 l                 7. Hours Generator was On-line                                                                                                                                                 744.0         3,623.0             93,108.7
: 5. Number of Hours Reactor was Crit; cal 744.0 3,623.0 94,165.7
: 8. Unit Reserve Shutdown Hours                                                                                                                                                   0.0             0.0                 0.0
: 6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l
: 9. Gross Thermal Energy Generated                                                                                     (MWH)                                                 2,503,708       12,251,664       309,233,275
: 7. Hours Generator was On-line 744.0 3,623.0 93,108.7
: 10. Gross Electrical Energy Generated (MWH)                                                                                                                                   852,078       4,177,054         103,397,092
: 8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
: 11. Net Electrical Energy Generated (MWH)                                                                                                                                     818,015       4,010,962         98,664,299
: 9. Gross Thermal Energy Generated (MWH) 2,503,708 12,251,664 309,233,275
: 12. Reactor Service Factor                                                                                                                                                     100.0           100.0               84.7
: 10. Gross Electrical Energy Generated (MWH) 852,078 4,177,054 103,397,092
: 13. Reactor Availability Factor                                                                                                                                                 100.0           100.0               34.7
: 11. Net Electrical Energy Generated (MWH) 818,015 4,010,962 98,664,299
: 14. Unit Service Factor                                                                                                                                                         100.0           100.0               83.7
: 12. Reactor Service Factor 100.0 100.0 84.7
: 15. Unit Availability Factor                                                                                                                                                   100.0           100.0               83.7
: 13. Reactor Availability Factor 100.0 100.0 34.7
: 18. Unit Capacity Factor (using MDC)                                                                                                                                           102.3           103.0               82.5
: 14. Unit Service Factor 100.0 100.0 83.7
: 17. Unit Capacity Factor (using DER)                                                                                                                                             99.6           100.3               80.4
: 15. Unit Availability Factor 100.0 100.0 83.7
: 18. Unit Forced Outage Rate                                                                                                                                                       0.0             0.0                 3.3 FEM                                                                                                                                                                                                                   Page : 3 of 6
: 18. Unit Capacity Factor (using MDC) 102.3 103.0 82.5
: 17. Unit Capacity Factor (using DER) 99.6 100.3 80.4
: 18. Unit Forced Outage Rate 0.0 0.0 3.3 FEM Page : 3 of 6


OPERATING DAT/ REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS (Cont.)
OPERATING DAT/ REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY :
D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS (Cont.)
: 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
: 19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :
NONE
NONE
: 20. If Shutdown at end of report period, estimated date of startup :             N/A
: 20. If Shutdown at end of report period, estimated date of startup :
N/A
: 21. Unit is in Commercial Operation.
: 21. Unit is in Commercial Operation.
THIS       YEAR TO MONTH         DATE         CUMULATIVE
THIS YEAR TO MONTH DATE CUMULATIVE
: 22. Hours in Reporting Period                           744           3,623           111,192
: 22. Hours in Reporting Period 744 3,623 111,192
: 23. Unit Forced Outage Hours                           0.0           0.0           3,218.9
: 23. Unit Forced Outage Hours 0.0 0.0 3,218.9
: 24. Nameplate Rating         (Gross MWe)           :  1,200 Max. Dependable Capacity (Gross MWe)       :  1,120
: 24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
: 25. If changes occur in capacity ratings (Items 2 and 24) since the last report,                         f give the reasons :                                                                                 1 N/A                     _.
: 25. If changes occur in capacity ratings (Items 2 and 24) since the last report, f
j I
give the reasons :
M                                                                                       Page : 4 of 6
1 N/A j
                                                                                                            ]
M Page : 4 of 6
]


AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY : D. S. Freeman TELEPHONE: (504) 739-6575 Reporting Period :           May,1998                               ( NET MWe )
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY :
DAY Avg. Power Level               DAY Avg. Power Level 1         1,106                 16                                 1,110 2         1,047                 17                                 1,110 3         1,109                 18                                 1,110 4         1,109                 19                                 1,110                                             l 5         1,108                 20                                 1,110                                             )
D. S. Freeman TELEPHONE: (504) 739-6575 Reporting Period :
6          1,107                 21                                 1,109 7         1,108                 22                                 1,108 8         1,111                 23                                 1,108 9         1,110                 24                                 1,107 10         1,111                 25                                 1,106 11         1,110                 26                                 1,106 12         1,110                 27                                 1,106 13         1,107                 28                                 1,105 14         1,106                 29                                         921 15         1,106                 30                                 1,095 31                                 1,099 INSTRUCTIONS :
May,1998
( NET MWe )
DAY Avg. Power Level DAY Avg. Power Level 1
1,106 16 1,110 2
1,047 17 1,110 3
1,109 18 1,110 4
1,109 19 1,110 5
1,108 20 1,110 6
1,107 21 1,109 7
1,108 22 1,108 8
1,111 23 1,108 9
1,110 24 1,107 10 1,111 25 1,106 11 1,110 26 1,106 12 1,110 27 1,106 13 1,107 28 1,105 14 1,106 29 921 15 1,106 30 1,095 31 1,099 INSTRUCTIONS :
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I j
j 6%4 Page $ of 6
6%4                                                                                                                                     Page $ of 6


,                      UNIT SHUTDOWNS AND POWER REDUCTIONS
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 9,1998 COMPLETED BY :
                    ,      ,                DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 9,1998 COMPLETED BY : D. S. Freeman TELEPHONE: (504)739-6575 i
D. S. Freeman TELEPHONE: (504)739-6575 i
REPORTING PERIOD :         May,1998 Outage Date Duration         Shutdown Cause, Comments and Number (yymmdd) Type         (Hours) Reason Method Corrective Actions 98-01   980529       F       0.0       A       5       A Part-Length CEA fully inserted into the reactor due to a power supply failure.
REPORTING PERIOD :
Reactor power was reduced below 70% within one hour per Tech. Spec. requirement.                                                           l Investigation is continuing.                                                           I Details are in corrective action document CR-98-0755.
May,1998 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)
l i
Reason Method Corrective Actions 98-01 980529 F
TYPE                               REASON F - Forced                           A - Equipment Failure (explain)
0.0 A
S - Scheduled                         B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD                                           License Examination 1 - Manual                           F - Administrative 2 - Manual Scram                     G - Operational Error (explain) 3 - Automatic Scram                   H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain)
5 A Part-Length CEA fully inserted into the reactor due to a power supply failure.
        -                                                                                                                                    n,. : 6 or 6
Reactor power was reduced below 70% within one hour per Tech. Spec. requirement.
_                    _ _ _  . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _}}
Investigation is continuing.
I Details are in corrective action document CR-98-0755.
i TYPE REASON F - Forced A - Equipment Failure (explain)
S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) n,. : 6 or 6
. _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _}}

Latest revision as of 14:16, 30 November 2024

Monthly Operating Rept for May 1998 for Waterford 3 Ses
ML20249A471
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/31/1998
From: Ewing E, Freeman D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-98-0037, W3F1-98-37, NUDOCS 9806160472
Download: ML20249A471 (7)


Text

I

- - s cntergy operations,ine.

e 5

2%ilen Er C. Ewing, Ill f4JC a afety & Regulatory Affair 6 W3F1-98-0037 A4.05 PR June 11,1998 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of May,1998. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Should you have any questions regarding the above, please contact me at

/

(504) 739-6242 or Tim Gaudet at (504) 739-6666.

/

Very truly yours,

[

E.C. Ewing Director Nuclear Safety & Regulatory Affairs ECE/ PRS /rtk Attachment cc:

E.W. Merschoff (NRC Region IV), C.P. Patel (NRC-NRR),

J. Smith, N.S. Reynolds, B. Lewis (Utility Data Institute, Inc.),

J.T. Wheelock (INPO Records Center), NRC Resident inspectors Office 9806160472 980531

~

PDR ADOCK 05000382 R

PDR g

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 for May,1998 The unit experienced no shutdowns but had one (1) significant, though short-term, power reduction during the reporting period resulting in an average power level of 99.3%.

@h? '

Page : 1 of 6

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 for May,1998 There were no pressurizer safety valve failures or challenges experienced during the month.

WR48 Page : 2 of 6

OPERATING DATA REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY :

D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS l

1. Reporting Period May,1998 Gross Hours in Reporting Period 744
2. Currently Authorized Power Level (MWt) 3,390 Maximum Dependable Capacity (Net MWe) :

1,07s Design Electrical Rating (Net MWe) 1,104

3. Power Level to which Restricted (if any) (Net MWe)

N/A 1

4. Reason for Restriction (if any)

N/A l

l THIS YEAR TO MONTH DATE CUMULATIVE

5. Number of Hours Reactor was Crit; cal 744.0 3,623.0 94,165.7
6. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 l
7. Hours Generator was On-line 744.0 3,623.0 93,108.7
8. Unit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross Thermal Energy Generated (MWH) 2,503,708 12,251,664 309,233,275
10. Gross Electrical Energy Generated (MWH) 852,078 4,177,054 103,397,092
11. Net Electrical Energy Generated (MWH) 818,015 4,010,962 98,664,299
12. Reactor Service Factor 100.0 100.0 84.7
13. Reactor Availability Factor 100.0 100.0 34.7
14. Unit Service Factor 100.0 100.0 83.7
15. Unit Availability Factor 100.0 100.0 83.7
18. Unit Capacity Factor (using MDC) 102.3 103.0 82.5
17. Unit Capacity Factor (using DER) 99.6 100.3 80.4
18. Unit Forced Outage Rate 0.0 0.0 3.3 FEM Page : 3 of 6

OPERATING DAT/ REPORT DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY :

D. S. Freeman TELEPHONE: (504)739-6575 OPERATING STATUS (Cont.)

19. Shutdowns Scheduled over next 6 months (type, date and duration of each) :

NONE

20. If Shutdown at end of report period, estimated date of startup :

N/A

21. Unit is in Commercial Operation.

THIS YEAR TO MONTH DATE CUMULATIVE

22. Hours in Reporting Period 744 3,623 111,192
23. Unit Forced Outage Hours 0.0 0.0 3,218.9
24. Nameplate Rating (Gross MWe) 1,200 Max. Dependable Capacity (Gross MWe) 1,120
25. If changes occur in capacity ratings (Items 2 and 24) since the last report, f

give the reasons :

1 N/A j

M Page : 4 of 6

]

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 8,1998 COMPLETED BY :

D. S. Freeman TELEPHONE: (504) 739-6575 Reporting Period :

May,1998

( NET MWe )

DAY Avg. Power Level DAY Avg. Power Level 1

1,106 16 1,110 2

1,047 17 1,110 3

1,109 18 1,110 4

1,109 19 1,110 5

1,108 20 1,110 6

1,107 21 1,109 7

1,108 22 1,108 8

1,111 23 1,108 9

1,110 24 1,107 10 1,111 25 1,106 11 1,110 26 1,106 12 1,110 27 1,106 13 1,107 28 1,105 14 1,106 29 921 15 1,106 30 1,095 31 1,099 INSTRUCTIONS :

On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

j 6%4 Page $ of 6

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER : 50-382 UNIT NAME : WATERFORD 3 DATE OF REPORT : June 9,1998 COMPLETED BY :

D. S. Freeman TELEPHONE: (504)739-6575 i

REPORTING PERIOD :

May,1998 Outage Date Duration Shutdown Cause, Comments and Number (yymmdd) Type (Hours)

Reason Method Corrective Actions 98-01 980529 F

0.0 A

5 A Part-Length CEA fully inserted into the reactor due to a power supply failure.

Reactor power was reduced below 70% within one hour per Tech. Spec. requirement.

Investigation is continuing.

I Details are in corrective action document CR-98-0755.

i TYPE REASON F - Forced A - Equipment Failure (explain)

S - Scheduled B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training and METHOD License Examination 1 - Manual F - Administrative 2 - Manual Scram G - Operational Error (explain) 3 - Automatic Scram H - Other (explain) 4 - Continuation from Previous Period 5 - Power Reduction 6 - Other (explain) n,. : 6 or 6

. _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _