ML20249B965: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:___ | {{#Wiki_filter:___ | ||
p a a. M oa n a e g g g3 C / [ S Ad | p a a. M oa n a e g g g3 C / [ S Ad b Ic j | ||
PRELIMI!1ARY NOTIFICATION | |||
~ | |||
Facility: | September 23, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-163 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance. | ||
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date. | |||
Facility: | |||
Virginia Electric and Power Co. | |||
North Anna Nuclear Facility | North Anna Nuclear Facility | ||
==Subject:== | ==Subject:== | ||
CONSTRUCTION LABOR UNREST. | CONSTRUCTION LABOR UNREST. | ||
At about 10 a.m. this morning, three contractor employees: Foreman, General Foreman and a worker, all three involved in pipefitting activities at North Anna, were discharged. | At about 10 a.m. this morning, three contractor employees: Foreman, General Foreman and a worker, all three involved in pipefitting activities at North Anna, were discharged. | ||
The pipefitters protested the above firings and became disorderly, prompting VEPCO to call in the State Police. Approximately 25 police vehicles responded. About 80 workers have been removed f rom the site. | The foremen were dis-charged because they reportedly had not been providing adequate super-vision over their areas of responsibility. | ||
The worker, it is reported, was discharged for improper operation of an argon gas valve which may have been related to the death of a worker proviously reported in PNO-76-159. | |||
The pipefitters protested the above firings and became disorderly, prompting VEPCO to call in the State Police. | |||
Approximately 25 police vehicles responded. About 80 workers have been removed f rom the site. | |||
As of 3:30 p.m. order had been restored. | As of 3:30 p.m. order had been restored. | ||
It is anticipated that there vill be media interest. A press release by NRC is not planned. | It is anticipated that there vill be media interest. A press release by NRC is not planned. | ||
| Line 33: | Line 39: | ||
==Contact:== | ==Contact:== | ||
GCGower, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution: | GCGower, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution: | ||
Chairman Rowden | Chairman Rowden Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, AIA K. R. Chapman, NMSS R. G. Ryan, OPS Transmitted: PBldg'[ | ||
; H St.V | |||
; MNBB | |||
[&I 9806250112 760923 PDR | ; Luge r | ||
PRELIMINARY NOTIFICATION | |||
[&I 9806250112 760923 PDR I&E PNG-76-163 PDR}} | |||
Latest revision as of 14:58, 30 November 2024
| ML20249B965 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 09/23/1976 |
| From: | Gower G, Roy G, Thompson D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | |
| References | |
| PNO-76-163, NUDOCS 9806250112 | |
| Download: ML20249B965 (1) | |
Text
___
p a a. M oa n a e g g g3 C / [ S Ad b Ic j
PRELIMI!1ARY NOTIFICATION
~
September 23, 1976 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-163 This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.
The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
Facility:
Virginia Electric and Power Co.
North Anna Nuclear Facility
Subject:
CONSTRUCTION LABOR UNREST.
At about 10 a.m. this morning, three contractor employees: Foreman, General Foreman and a worker, all three involved in pipefitting activities at North Anna, were discharged.
The foremen were dis-charged because they reportedly had not been providing adequate super-vision over their areas of responsibility.
The worker, it is reported, was discharged for improper operation of an argon gas valve which may have been related to the death of a worker proviously reported in PNO-76-159.
The pipefitters protested the above firings and became disorderly, prompting VEPCO to call in the State Police.
Approximately 25 police vehicles responded. About 80 workers have been removed f rom the site.
As of 3:30 p.m. order had been restored.
It is anticipated that there vill be media interest. A press release by NRC is not planned.
NRC Region III (Atlanta) and Headquarters. personnel were informed of this occurrence at approximately 3:30 p.m. today.
Contact:
GCGower, IE x27261 GWRoy, IE x27261 DThompson, IE x27541 Distribution:
Chairman Rowden Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, AIA K. R. Chapman, NMSS R. G. Ryan, OPS Transmitted: PBldg'[
- H St.V
- MNBB
- Luge r
PRELIMINARY NOTIFICATION