August 25, 1987 | August 25, 1987 | ||
' Docket No. 50-601 | |||
MEMORANDUM T0: Distribution (See next page) 1 FROM: | { | ||
Division of Reactor Projects III, IV, V and Special Projects, NRR | MEMORANDUM T0: Distribution (See next page) 1 FROM: | ||
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | |||
==SUBJECT:== | ==SUBJECT:== | ||
MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached i | MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached i | ||
If you have been recently assioned to this project or missed the earlier meeting, I recommend you attend this general' introduction to the plant design if possible. If you have any questions, I can be reached at X28206. | meeting notice). This meeting will be similar to the one held in June 1987. | ||
If you have been recently assioned to this project or missed the earlier meeting, I recommend you attend this general' introduction to the plant design if possible. | |||
If you have any questions, I can be reached at X28206. | |||
origina'i signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | origina'i signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | ||
==Enclosure:== | ==Enclosure:== | ||
As stated DISTRIBUTION: | |||
(DocketFile.1 NRC"PDR PDSNP Reading TKeyon EHytlon LRubenstein | |||
). | |||
P)fh (DSIG 6}on LRubenstein T(6)A/87 08/g/87 on 08/pl/87 08 8708270336 870G25 PDR ADOCK 05000601 A | |||
PDR | |||
August-25, 1987 | |||
: t. -. | |||
f l | |||
: t. -. | :I | ||
:I | . Docket No. 50-601 o | ||
MEM0MNDUM TO: Distribution (See'next page) | MEM0MNDUM TO: Distribution (See'next page) | ||
FROM: | FROM: | ||
V and Special Projects, NRR | Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | ||
==SUBJECT:== | ==SUBJECT:== | ||
'liEETING ON RESAR SP/90 | |||
/ | |||
Du to the'1arge number of new staff that have been recently assigned to review RESAR SP/90, I have set.up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice).. This meeting will be similar to the one held in June 1987. | Du to the'1arge number of new staff that have been recently assigned to review RESAR SP/90, I have set.up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice).. This meeting will be similar to the one held in June 1987. | ||
If you have been recently assigned to this project or missed the earlier | If you have been recently assigned to this project or missed the earlier 1 | ||
meeting, I recommend you attend this general introduction to the plant design j | |||
I original aigned by Thomas J. Kenyon, Project Manager | if.possible.. If you have any questions I can be reached at X28206. | ||
I original aigned by | |||
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | '"~ ^ | ||
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | |||
==Enclosure:== | ==Enclosure:== | ||
As stated DISTRIBUTION: | |||
As stated DISTRIBUTION: | l Docket File NRC PDR PDSNP Reading TKeyon EHytlon LRubenstein | ||
,7 P | |||
on | Pp | ||
08/pl/87 | [D | ||
( | |||
on W | |||
on LRubenstein 08/pl/87 08 | |||
/87 08/gf87 l | |||
i i | i i | ||
J | J | ||
e, pH OIG 7 | |||
d,' | |||
ff $; | O UNITED STATES g | ||
NUCLEAR REGULATORY COMMISSION' e | |||
At)G 2 51987 Lf | ff $; | ||
-Q' W ASHINGTON, D. C. 20555 | |||
/ | |||
At)G 2 51987 N..+ | |||
Lf Decket'Wo. 50-601 5 | |||
MEMORANDUM T0: Distribution (See next page) | MEMORANDUM T0: Distribution (See next page) | ||
(fhi: | (fhi: | ||
Thomas J. Kenyon, Project Manager q | |||
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | |||
==SUBJECT:== | ==SUBJECT:== | ||
MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to | MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to | ||
. review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice). This meeting will be similar to the one held in June 1987. | |||
If you have been recently assigned to this project or missed the earlier meeting, I recommend you attend this general introduction to the plant design if possible. | |||
If you have been recently assigned to this project or missed the earlier meeting, I recommend you attend this general introduction to the plant design if possible. If you have any questions, I can be. reached at X28206. | If you have any questions, I can be. reached at X28206. | ||
l l' | l l' | ||
l l | l l | ||
omas J. nyon,. Project Manager Standard ation and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | omas J. | ||
nyon,. Project Manager Standard ation and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR | |||
) | ) | ||
==Enclosure:== | ==Enclosure:== | ||
As stated | As stated | ||
1 4 | 1 4 | ||
o. | |||
t, _ | t, _ | ||
L | L 4 | ||
s | ( | ||
s V | |||
t L DISTRIBUTION:J C..Y. Cheng G. Johnson | t L DISTRIBUTION:J C..Y. Cheng G. Johnson D. Sellers 3 | ||
J. . Bramer | T. Marsh | ||
S. flou | + | ||
J.. Bramer | |||
~-t S. flou V | |||
G. Giera,hhch- | ~ | ||
S. Chan: \c | . (L ' 83gchi. | ||
j;,: | .1.'? Rei tir-i,~ | ||
R. Pichumani | G. Giera,hhch-S. Chan: \\c j;,: | ||
R. Pichumani xJ' G. Staley | |||
-4 C. McCracken t | |||
J. Knight | t J. Wing | ||
[ | |||
a D. Notley | |||
't J. Joyce | |||
- F. Bijrrows - | |||
1 4 | |||
C | |||
.\\ | |||
FiRosa y. | |||
J. Knight i- | |||
? | |||
't N. Trshe+ | |||
s,,,{. | |||
, '4 | |||
~~ | ~~ | ||
by d'- | |||
J. Craig. | J. Craig. | ||
;A e | |||
.h Wermiel D. Schum G4' | |||
-( | |||
s. | |||
.kudricks | |||
J.'W. | '.s a.. a v | ||
J.'W. Hodges | |||
: h. - | : h. - | ||
M. | |||
* k A.-Gill | i,'' | ||
C | * ~ < | ||
J. Raval- | k R. Fell A.-Gill O | ||
1 J. Lee h | |||
N C | |||
* IN ks H. Walker | J. Raval- | ||
S. Diab | ?- | ||
A. Beech | ~ | ||
s s | |||
F. flaskins J. Spraul | N. Wagner V | ||
G. lapinsky | * IN ks | ||
w 3, R. Erick. son | .s H. Walker S | ||
R. Dubev | R. Jones S. Diab | ||
B. Menecisohn J. Murphy H. Vandermolen | ? | ||
A. Beech s | |||
A. El-Bassioni | F. flaskins J. Spraul 3 | ||
W. Regan S. Wiss G. lapinsky w 3, R. Erick. son | |||
G. Vissing | ,i R. Dubev B. Menecisohn J. Murphy H. Vandermolen i | ||
1 | B. Hardir. | ||
i | 'I R. Barrett A. El-Bassioni S. Long g | ||
L-T. Dorian l | |||
L. Rubenstein s | |||
P. Leech ', | |||
N,' | |||
G. Vissing 1 | |||
at i | |||
s}} | |||
Latest revision as of 06:37, 2 December 2024
| ML20237K900 | |
| Person / Time | |
|---|---|
| Site: | 05000601 |
| Issue date: | 08/25/1987 |
| From: | Kenyon T Office of Nuclear Reactor Regulation |
| To: | Cheng C, Johnson G, Sellers D NRC |
| Shared Package | |
| ML20237K903 | List: |
| References | |
| NUDOCS 8708270336 | |
| Download: ML20237K900 (4) | |
Text
_ _ _ _ _ -
August 25, 1987
' Docket No. 50-601
{
MEMORANDUM T0: Distribution (See next page) 1 FROM:
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
SUBJECT:
MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached i
meeting notice). This meeting will be similar to the one held in June 1987.
If you have been recently assioned to this project or missed the earlier meeting, I recommend you attend this general' introduction to the plant design if possible.
If you have any questions, I can be reached at X28206.
origina'i signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
Enclosure:
As stated DISTRIBUTION:
(DocketFile.1 NRC"PDR PDSNP Reading TKeyon EHytlon LRubenstein
).
P)fh (DSIG 6}on LRubenstein T(6)A/87 08/g/87 on 08/pl/87 08 8708270336 870G25 PDR ADOCK 05000601 A
August-25, 1987
- t. -.
f l
- I
. Docket No. 50-601 o
MEM0MNDUM TO: Distribution (See'next page)
FROM:
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
SUBJECT:
'liEETING ON RESAR SP/90
/
Du to the'1arge number of new staff that have been recently assigned to review RESAR SP/90, I have set.up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice).. This meeting will be similar to the one held in June 1987.
If you have been recently assigned to this project or missed the earlier 1
meeting, I recommend you attend this general introduction to the plant design j
if.possible.. If you have any questions I can be reached at X28206.
I original aigned by
'"~ ^
Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
Enclosure:
As stated DISTRIBUTION:
l Docket File NRC PDR PDSNP Reading TKeyon EHytlon LRubenstein
,7 P
Pp
[D
(
on W
on LRubenstein 08/pl/87 08
/87 08/gf87 l
i i
J
e, pH OIG 7
d,'
O UNITED STATES g
NUCLEAR REGULATORY COMMISSION' e
ff $;
-Q' W ASHINGTON, D. C. 20555
/
At)G 2 51987 N..+
Lf Decket'Wo. 50-601 5
MEMORANDUM T0: Distribution (See next page)
(fhi:
Thomas J. Kenyon, Project Manager q
Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
SUBJECT:
MEETING ON RESAR SP/90 Due to the large number of new staff that have been recently assigned to
. review RESAR SP/90, I have set up another meeting with Westinghouse to discuss the general layout and unique features of the plant design (see attached meeting notice). This meeting will be similar to the one held in June 1987.
If you have been recently assigned to this project or missed the earlier meeting, I recommend you attend this general introduction to the plant design if possible.
If you have any questions, I can be. reached at X28206.
l l'
l l
omas J.
nyon,. Project Manager Standard ation and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects, NRR
)
Enclosure:
As stated
1 4
o.
t, _
L 4
(
s V
t L DISTRIBUTION:J C..Y. Cheng G. Johnson D. Sellers 3
T. Marsh
+
J.. Bramer
~-t S. flou V
~
. (L ' 83gchi.
.1.'? Rei tir-i,~
G. Giera,hhch-S. Chan: \\c j;,:
R. Pichumani xJ' G. Staley
-4 C. McCracken t
t J. Wing
[
a D. Notley
't J. Joyce
- F. Bijrrows -
1 4
C
.\\
FiRosa y.
J. Knight i-
?
't N. Trshe+
s,,,{.
, '4
~~
by d'-
J. Craig.
- A e
.h Wermiel D. Schum G4'
-(
s.
.kudricks
'.s a.. a v
J.'W. Hodges
- h. -
M.
i,
- ~ <
k R. Fell A.-Gill O
1 J. Lee h
N C
J. Raval-
?-
~
s s
N. Wagner V
- IN ks
.s H. Walker S
R. Jones S. Diab
?
A. Beech s
F. flaskins J. Spraul 3
W. Regan S. Wiss G. lapinsky w 3, R. Erick. son
,i R. Dubev B. Menecisohn J. Murphy H. Vandermolen i
B. Hardir.
'I R. Barrett A. El-Bassioni S. Long g
L-T. Dorian l
L. Rubenstein s
P. Leech ',
N,'
G. Vissing 1
at i
s