PNO-IV-97-063, on 971029,incident Resulting in Potential Exposure in Excess of Regulatory Limit Occurred.Gauge Mfg Notified of Incident.State of CA Provided NRC Info Regarding Event: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
{{#Wiki_filter:,. | {{#Wiki_filter:,. | ||
@ I. | ~ | ||
@ I.. Oct::ber 30,1997 Wy L ^ 7 ppm ma! NARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-IV 97-063 20 g | |||
M' (Thisheliminary notification constitutes EARLY notice of events of POSSIBLE | |||
.,.safet'y or public interest significance. The information is as initially p | |||
received.wlthout verification'or evaluation, and is basically all that is - | |||
known byLRegipn IV staff in Arlington, Texas on this date. - | known byLRegipn IV staff in Arlington, Texas on this date. - | ||
- Facility | |||
. Licensee Emeroency Classification rg" | |||
;Manson Construction & Engineering Co.- | |||
Notification of Unusual Event | |||
^ | ^ | ||
~ Manson Construction & Eng. Co.. | |||
: Alert | |||
-1605 Pier D Street a: | |||
Site Area Emergency Long Beach,Californias General Emergency. | |||
I | X Not Applicable i | ||
s I | |||
==Subject:== | ==Subject:== | ||
' INCIDENT RESULTING IN POTENTIAL EXPOSURE IN EXCESS OF | ' INCIDENT RESULTING IN POTENTIAL EXPOSURE IN EXCESS OF 1 REGULATORY LIMIT - | ||
1 REGULATORY LIMIT - | 4 M | ||
M | |||
NRy facsimile transmittal dated October 29,1997, the California Radiologic Health Branch | NRy facsimile transmittal dated October 29,1997, the California Radiologic Health Branch | ||
;fCRHB) Informed the Office of State Programs and Region IV of an incident involving an | |||
' inadvertent exposur n | |||
:CRHB reported that an employee of Manson. Construction & Engineering Co., Long Beach, California, was removing a Texas Nuclear Model 5409 pipe gauge, containing 2.8 curies of | :CRHB reported that an employee of Manson. Construction & Engineering Co., Long Beach, California, was removing a Texas Nuclear Model 5409 pipe gauge, containing 2.8 curies of ceslum-137, from a barge for. service when the exposure occurred. The individual believed 4 | ||
ceslum-137, from a barge for. service when the exposure occurred. The individual believed m | m | ||
-that hehad closed the shutter prior to removing the gauge, but after working with the gauge M' | |||
for4 W | |||
- E a period of time, he realized that the shutter had remained in the open position. The individual 4 | |||
.~ worked with the gauge for approximate!v 30 minutes and based on an evaluation performed | |||
.by CRHB, the dose received.by the individual was estimated to be 4.7 rems. A second | |||
: Individual was also reported to have worked in the vicinity, although he was present for a sh' rter period of time and was at a greater distance from the source. A dose estimate for o | |||
1the second individual was not yet available, ra | |||
~ | |||
;CRHB has directed Manson Construction & Engineering to obtain the services of a consultant R | |||
fto complete a review of the incident and perform dose assessments for both indMuals. The | fto complete a review of the incident and perform dose assessments for both indMuals. The | ||
~ | |||
~ | |||
; gauge manufacturer has been notified ~of the incident and will perform an examination of the 1 shutter mechanism to determine the cause of its failure to close. | |||
1 shutter mechanism to determine the cause of its failure to close. | ~ | ||
The.' state of California provided NRC information regarding this ever.t. | |||
< Region.IV received notification of this occurrence by facsimile from CRHB on Octcher 29. - | |||
- Region IV has informed NMSS. - | |||
LThis information- bas been. discussed -with the state and is current as of 12:00 p.m., | LThis information-bas been. discussed -with the state and is current as of 12:00 p.m., | ||
LOctober 30,1997. | LOctober 30,1997. | ||
(Contact: Charles A. Hackney' Linda Howell | (Contact: Charles A. Hackney' Linda Howell | ||
-(817)860-8267 (8171860-8213 Mh/b5 | |||
og | / po O | ||
c og | |||
'F l9710310052 971030- | |||
PND-IV-97-063' PDR | \\\\O { \\ | ||
-PDR ItsE: | |||
i PND-IV-97-063' PDR | |||
w | \\ | ||
g 31 @03 w | |||
;}} | |||
{{PNO-Nav|region=IV}} | {{PNO-Nav|region=IV}} | ||
Latest revision as of 06:39, 4 December 2024
| ML20212D270 | |
| Person / Time | |
|---|---|
| Issue date: | 10/30/1997 |
| From: | Hackney C, Linda Howell NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| References | |
| PNO-IV-97-063, PNO-IV-97-63, NUDOCS 9710310052 | |
| Download: ML20212D270 (1) | |
,.
~
@ I.. Oct::ber 30,1997 Wy L ^ 7 ppm ma! NARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-IV 97-063 20 g
M' (Thisheliminary notification constitutes EARLY notice of events of POSSIBLE
.,.safet'y or public interest significance. The information is as initially p
received.wlthout verification'or evaluation, and is basically all that is -
known byLRegipn IV staff in Arlington, Texas on this date. -
- Facility
. Licensee Emeroency Classification rg"
- Manson Construction & Engineering Co.-
Notification of Unusual Event
^
~ Manson Construction & Eng. Co..
- Alert
-1605 Pier D Street a:
Site Area Emergency Long Beach,Californias General Emergency.
X Not Applicable i
s I
Subject:
' INCIDENT RESULTING IN POTENTIAL EXPOSURE IN EXCESS OF 1 REGULATORY LIMIT -
4 M
NRy facsimile transmittal dated October 29,1997, the California Radiologic Health Branch
- fCRHB) Informed the Office of State Programs and Region IV of an incident involving an
' inadvertent exposur n
- CRHB reported that an employee of Manson. Construction & Engineering Co., Long Beach, California, was removing a Texas Nuclear Model 5409 pipe gauge, containing 2.8 curies of ceslum-137, from a barge for. service when the exposure occurred. The individual believed 4
m
-that hehad closed the shutter prior to removing the gauge, but after working with the gauge M'
for4 W
- E a period of time, he realized that the shutter had remained in the open position. The individual 4
.~ worked with the gauge for approximate!v 30 minutes and based on an evaluation performed
.by CRHB, the dose received.by the individual was estimated to be 4.7 rems. A second
- Individual was also reported to have worked in the vicinity, although he was present for a sh' rter period of time and was at a greater distance from the source. A dose estimate for o
1the second individual was not yet available, ra
~
- CRHB has directed Manson Construction & Engineering to obtain the services of a consultant R
fto complete a review of the incident and perform dose assessments for both indMuals. The
~
~
- gauge manufacturer has been notified ~of the incident and will perform an examination of the 1 shutter mechanism to determine the cause of its failure to close.
~
The.' state of California provided NRC information regarding this ever.t.
< Region.IV received notification of this occurrence by facsimile from CRHB on Octcher 29. -
- Region IV has informed NMSS. -
LThis information-bas been. discussed -with the state and is current as of 12:00 p.m.,
LOctober 30,1997.
(Contact: Charles A. Hackney' Linda Howell
-(817)860-8267 (8171860-8213 Mh/b5
/ po O
c og
'F l9710310052 971030-
\\\\O { \\
-PDR ItsE:
i PND-IV-97-063' PDR
\\
g 31 @03 w