@ I.. Oct::ber 30,1997 Wy L ^ 7 ppm ma! NARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-IV 97-063 20 g
M' (Thisheliminary notification constitutes EARLY notice of events of POSSIBLE
.,.safet'y or public interest significance. The information is as initially p
received.wlthout verification'or evaluation, and is basically all that is -
known byLRegipn IV staff in Arlington, Texas on this date. -
- Facility
. Licensee Emeroency Classification rg"
- Manson Construction & Engineering Co.-
Notification of Unusual Event
^
~ Manson Construction & Eng. Co..
- Alert
-1605 Pier D Street a:
Site Area Emergency Long Beach,Californias General Emergency.
X Not Applicable i
s I
Subject:
' INCIDENT RESULTING IN POTENTIAL EXPOSURE IN EXCESS OF 1 REGULATORY LIMIT -
4 M
NRy facsimile transmittal dated October 29,1997, the California Radiologic Health Branch
- fCRHB) Informed the Office of State Programs and Region IV of an incident involving an
' inadvertent exposur n
- CRHB reported that an employee of Manson. Construction & Engineering Co., Long Beach, California, was removing a Texas Nuclear Model 5409 pipe gauge, containing 2.8 curies of ceslum-137, from a barge for. service when the exposure occurred. The individual believed 4
m
-that hehad closed the shutter prior to removing the gauge, but after working with the gauge M'
for4 W
- E a period of time, he realized that the shutter had remained in the open position. The individual 4
.~ worked with the gauge for approximate!v 30 minutes and based on an evaluation performed
.by CRHB, the dose received.by the individual was estimated to be 4.7 rems. A second
- Individual was also reported to have worked in the vicinity, although he was present for a sh' rter period of time and was at a greater distance from the source. A dose estimate for o
1the second individual was not yet available, ra
~
- CRHB has directed Manson Construction & Engineering to obtain the services of a consultant R
fto complete a review of the incident and perform dose assessments for both indMuals. The
~
~
- gauge manufacturer has been notified ~of the incident and will perform an examination of the 1 shutter mechanism to determine the cause of its failure to close.
~
The.' state of California provided NRC information regarding this ever.t.
< Region.IV received notification of this occurrence by facsimile from CRHB on Octcher 29. -
- Region IV has informed NMSS. -
LThis information-bas been. discussed -with the state and is current as of 12:00 p.m.,
LOctober 30,1997.
(Contact: Charles A. Hackney' Linda Howell
-(817)860-8267 (8171860-8213 Mh/b5
/ po O
c og
'F l9710310052 971030-
\\\\O { \\