05000443/FIN-2009007-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Inadequate B EDG Design Change | | title = Inadequate B EDG Design Change | ||
| docket = 05000443 | | docket = 05000443 | ||
| inspection report = IR 05000443/2009007 | | inspection report = IR 05000443/2009007 |
Latest revision as of 23:09, 29 May 2018
Site: | Seabrook |
---|---|
Report | IR 05000443/2009007 Section 1R18 |
Date counted | Sep 30, 2009 (2009Q3) |
Type: | Violation: White |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.18 |
Inspectors (proximate) | C Cahill D Lew E Burket J Heinly J Rady K Mangan R Moore W Raymonda Burritta Ziedonis D Schroeder S Ibarrolaa Burritta Defrancisco C Cahill D Holody D Roberts G Bowman J Clifford K Farrar S Collins W Raymond |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |