05000250/FIN-2007003-04: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 12: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71152
| Inspection procedure = IP 71152
| Inspector = T Hoeg, S Ninh, S Stewart, M Dudekc,  Peabodyc Fletcher, J Stewart, A Nielsen, J Rivera, -Ortizr Hamilton, G Kuzo, L Lake, B Miller, S Sanchez, M Barillas
| Inspector = T Hoeg, S Ninh, S Stewart, M Dudekc,  Peabodyc Fletcher, J Stewart, A Nielsen, J Rivera-Ortiz, R Hamilton, G Kuzo, L Lake, B Miller, S Sanchez, M Barillas
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  
| description = On June 10, 2007, in response to inspector questioning, the licensee found that the alternate shutdown dedicated communications system had not been tested satisfactorily since 2001. In response, the licensee started a review of system operability. At the end of the inspection period, information from the licensee regarding the nature of the individual failures and ability to mitigate communication problems were needed to resolve this issue. Therefore, pending additional inspection this will remain open as Unresolved Item URI 50-250&251/2007-03-04, Availability and Functionality of Unit 3 and Unit 4 Alternate Shutdown Systems
| description = On June 10, 2007, in response to inspector questioning, the licensee found that the alternate shutdown dedicated communications system had not been tested satisfactorily since 2001. In response, the licensee started a review of system operability. At the end of the inspection period, information from the licensee regarding the nature of the individual failures and ability to mitigate communication problems were needed to resolve this issue. Therefore, pending additional inspection this will remain open as Unresolved Item URI 50-250&251/2007-03-04, Availability and Functionality of Unit 3 and Unit 4 Alternate Shutdown Systems
}}
}}

Latest revision as of 20:34, 20 February 2018

04
Site: Turkey Point NextEra Energy icon.png
Report IR 05000250/2007003 Section 4OA2
Date counted Jun 30, 2007 (2007Q2)
Type: URI:
cornerstone No Cornerstone
Identified by: NRC identified
Inspection Procedure: IP 71152
Inspectors (proximate) T Hoeg
S Ninh
S Stewart
M Dudekc
Peabodyc Fletcher
J Stewart
A Nielsen
J Rivera-Ortiz
R Hamilton
G Kuzo
L Lake
B Miller
S Sanchez
M Barillas
INPO aspect
'