ML20205A442: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
4 | 4 | ||
'a MISSISSIPPI POWER & LIGHT COMPANY | 'a | ||
)) | |||
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EnMMiliddB P. O. B O X 164 0. J A C K S O N, MIS SIS SIP PI 39215-1640 g gnl7 nT : 50 April 12, 1985 NUCLEAR LICENSING & SAFETY DEPARTMENT U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Attention: | |||
Dr. J. Nelson Grace, Regional Administrator | |||
==Dear Dr. Grace:== | ==Dear Dr. Grace:== | ||
==SUBJECT:== | ==SUBJECT:== | ||
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 File: | Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 File: | ||
0260/0511/0512 PRD-84/11, Interim Report #1, Westinghouse Type SA-1 Relays AECM-85/2-0008 | |||
==Reference:== | ==Reference:== | ||
AECM-84/2-0018, October 26, 1984 Per the referenced letter, Mississippi Power & Light Company (MP&L) stated that a final report was expected to be provided by April 12, 1985 for PRD-84/11. The subject potentially reportable deficiency concerned the potential for leaking tantalum capacitors, located internally at the top of the SA-1 relay printed circuit board, to cause corrosion buildup on the circuit board and subsequent relay failure. | AECM-84/2-0018, October 26, 1984 Per the referenced letter, Mississippi Power & Light Company (MP&L) stated that a final report was expected to be provided by April 12, 1985 for PRD-84/11. The subject potentially reportable deficiency concerned the potential for leaking tantalum capacitors, located internally at the top of the SA-1 relay printed circuit board, to cause corrosion buildup on the circuit board and subsequent relay failure. | ||
MP&L previously determined that this deficiency was not reportable under the provisions of 10CFR21 for GGNS Unit 1. As indicated in the referenced letter a determination as to whether the deficiency is reportable under 10CFR50.55(e) for Unit 2 can not be made until the Unit 2 relays are energized and monitored for two weeks to determine whether they contain leaking capacitors. | MP&L previously determined that this deficiency was not reportable under the provisions of 10CFR21 for GGNS Unit 1. | ||
As indicated in the referenced letter a determination as to whether the deficiency is reportable under 10CFR50.55(e) for Unit 2 can not be made until the Unit 2 relays are energized and monitored for two weeks to determine whether they contain leaking capacitors. | |||
In November 1982 construction activities on Grand Gulf Unit 2 were reduced to a minimum. Being in this reduced activity mode has limited the number of inspections that can be done on Unit 2 equipment to determine if the identified situation was or is applicable. | In November 1982 construction activities on Grand Gulf Unit 2 were reduced to a minimum. Being in this reduced activity mode has limited the number of inspections that can be done on Unit 2 equipment to determine if the identified situation was or is applicable. | ||
Bechtel has initiated Quality Action Request (QAR) F-464 to track required action to close our investigation of this PRD. | Bechtel has initiated Quality Action Request (QAR) F-464 to track required action to close our investigation of this PRD. | ||
The QAR will remain open until all action is complete, gar 2iBBR "i89h7 gg4 J0P14AECM85040301 - 1 Member Middle South Utilities System 0 0 i | |||
7 .. | 7.. | ||
(< | *(< | ||
AECM-85/2-0008 Page 2 Based on the above explanation, MP&L_ requests that further update on the subject PRD be deferred until after resumption of normal construction activities on Unit 2. If there are any questions, please advise. | AECM-85/2-0008 Page 2 Based on the above explanation, MP&L_ requests that further update on the subject PRD be deferred until after resumption of normal construction activities on Unit 2. | ||
If there are any questions, please advise. | |||
Yours truly, f | Yours truly, f | ||
^ | |||
-L. | |||
Director | F. Dale Director | ||
-EBS/SHH:rw cc: | |||
Mr. N. S. Reynolds Mr. G. B. Taylor Mr. James M. Taylor, Director Office of Inspection & Enforcement-U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l | Mr. J. B. Richard Mr. O. D. Kingsley, Jr. | ||
Mr. N. S. Reynolds Mr. G. B. Taylor Mr. James M. Taylor, Director Office of Inspection & Enforcement-U. S. Nuclear Regulatory Commission Washington, D. C. | |||
20555 l | |||
t f | t f | ||
J0P14AECM850'e0301 - 2 l-}} | J0P14AECM850'e0301 - 2 l-}} | ||
Latest revision as of 19:25, 7 December 2024
| ML20205A442 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 04/12/1985 |
| From: | Dale L MISSISSIPPI POWER & LIGHT CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| AECM-85-2-0008, AECM-85-2-8, NUDOCS 8504250518 | |
| Download: ML20205A442 (2) | |
Text
.
4
'a
))
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EnMMiliddB P. O. B O X 164 0. J A C K S O N, MIS SIS SIP PI 39215-1640 g gnl7 nT : 50 April 12, 1985 NUCLEAR LICENSING & SAFETY DEPARTMENT U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N. W., Suite 2900 Atlanta, Georgia 30323 Attention:
Dr. J. Nelson Grace, Regional Administrator
Dear Dr. Grace:
SUBJECT:
Grand Gulf Nuclear Station Unit 2 Docket No. 50-417 File:
0260/0511/0512 PRD-84/11, Interim Report #1, Westinghouse Type SA-1 Relays AECM-85/2-0008
Reference:
AECM-84/2-0018, October 26, 1984 Per the referenced letter, Mississippi Power & Light Company (MP&L) stated that a final report was expected to be provided by April 12, 1985 for PRD-84/11. The subject potentially reportable deficiency concerned the potential for leaking tantalum capacitors, located internally at the top of the SA-1 relay printed circuit board, to cause corrosion buildup on the circuit board and subsequent relay failure.
MP&L previously determined that this deficiency was not reportable under the provisions of 10CFR21 for GGNS Unit 1.
As indicated in the referenced letter a determination as to whether the deficiency is reportable under 10CFR50.55(e) for Unit 2 can not be made until the Unit 2 relays are energized and monitored for two weeks to determine whether they contain leaking capacitors.
In November 1982 construction activities on Grand Gulf Unit 2 were reduced to a minimum. Being in this reduced activity mode has limited the number of inspections that can be done on Unit 2 equipment to determine if the identified situation was or is applicable.
Bechtel has initiated Quality Action Request (QAR) F-464 to track required action to close our investigation of this PRD.
The QAR will remain open until all action is complete, gar 2iBBR "i89h7 gg4 J0P14AECM85040301 - 1 Member Middle South Utilities System 0 0 i
7..
- (<
AECM-85/2-0008 Page 2 Based on the above explanation, MP&L_ requests that further update on the subject PRD be deferred until after resumption of normal construction activities on Unit 2.
If there are any questions, please advise.
Yours truly, f
^
-L.
F. Dale Director
-EBS/SHH:rw cc:
Mr. J. B. Richard Mr. O. D. Kingsley, Jr.
Mr. N. S. Reynolds Mr. G. B. Taylor Mr. James M. Taylor, Director Office of Inspection & Enforcement-U. S. Nuclear Regulatory Commission Washington, D. C.
20555 l
t f
J0P14AECM850'e0301 - 2 l-