ML20207E332: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20207E332
| number = ML20207E332
| issue date = 08/12/1988
| issue date = 08/12/1988
| title = Forwards Response to NRC 880713 Ltr Re Violations of Security Requirements Noted in Insp Rept 50-344/88-16. Response Withheld
| title = Forwards Response to NRC Re Violations of Security Requirements Noted in Insp Rept 50-344/88-16. Response Withheld
| author name = Cockfield D
| author name = Cockfield D
| author affiliation = PORTLAND GENERAL ELECTRIC CO.
| author affiliation = PORTLAND GENERAL ELECTRIC CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8808180012
| document report number = NUDOCS 8808180012
| title reference date = 07-13-1988
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:'                                                                     ~
{{#Wiki_filter:'
                                          ~S AFEGUARDS"lNF0Rifdi ON'
~S AFEGUARDS"lNF0Rifdi ON'
e     _ Portland General Electric Company David W. Cockfield Vice President, Nuclear Au gu s t. 12, 1988 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTH:   Document Control Desk Washington DC 20555
~
e
_ Portland General Electric Company David W. Cockfield Vice President, Nuclear Au gu s t. 12, 1988 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTH:
Document Control Desk Washington DC 20555


==Dear Sir:==
==Dear Sir:==
 
Response to Notice cf Violation By Nuclear Regulatory Commission {{letter dated|date=July 13, 1988|text=letter dated July 13, 1988}} (Scarano to Cockfield), Portland Ceneral Electric Company received Inspection Report NJmber 88-16 and a Notice of Violation concerning security requirements at the Trajan Nuclear Plant. Our response to the Notice of Violation is attached.
Response to Notice cf Violation By Nuclear Regulatory Commission letter dated July 13, 1988 (Scarano to Cockfield), Portland Ceneral Electric Company received Inspection Report NJmber 88-16 and a Notice of Violation concerning security requirements at the Trajan Nuclear Plant. Our response to the Notice of Violation is attached.
Sincerely, Attachment O
Sincerely, Attachment O     c:   Mr. John B. Martin U$$               Regional Administrator, Region V U.S. Nuclear Regulatory Commission CO U's Mo               Mr. Bill Dixon Dj               State of Oregon l   Og               Department of Energy Co q y                 Mr. R. C. Barr OT               NRC Resident Inspector                                                         i bkG               Trojan Nuclear Plant                                                         7
c:
                                      -SAFEGUARDS INFORMATION
Mr. John B. Martin U$$
                                                                                              & 'I  l Unclassified when separated from Safeguards Information enclosures.             l 121 SW Stun Scect PcWd Cre7A 97204                                       l l}}
Regional Administrator, Region V U.S. Nuclear Regulatory Commission CO U's Mo Mr. Bill Dixon Dj State of Oregon l
Og Department of Energy Co q y
Mr. R. C. Barr OT NRC Resident Inspector i
bkG Trojan Nuclear Plant 7
'I
-SAFEGUARDS INFORMATION Unclassified when separated from Safeguards Information enclosures.
121 SW Stun Scect PcWd Cre7A 97204}}

Latest revision as of 21:56, 6 December 2024

Forwards Response to NRC Re Violations of Security Requirements Noted in Insp Rept 50-344/88-16. Response Withheld
ML20207E332
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/12/1988
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808180012
Download: ML20207E332 (1)


Text

'

~S AFEGUARDS"lNF0Rifdi ON'

~

e

_ Portland General Electric Company David W. Cockfield Vice President, Nuclear Au gu s t. 12, 1988 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTH:

Document Control Desk Washington DC 20555

Dear Sir:

Response to Notice cf Violation By Nuclear Regulatory Commission letter dated July 13, 1988 (Scarano to Cockfield), Portland Ceneral Electric Company received Inspection Report NJmber 88-16 and a Notice of Violation concerning security requirements at the Trajan Nuclear Plant. Our response to the Notice of Violation is attached.

Sincerely, Attachment O

c:

Mr. John B. Martin U$$

Regional Administrator, Region V U.S. Nuclear Regulatory Commission CO U's Mo Mr. Bill Dixon Dj State of Oregon l

Og Department of Energy Co q y

Mr. R. C. Barr OT NRC Resident Inspector i

bkG Trojan Nuclear Plant 7

'I

-SAFEGUARDS INFORMATION Unclassified when separated from Safeguards Information enclosures.

121 SW Stun Scect PcWd Cre7A 97204