i        p KEQg o                          UNITED STATES I                g NUCLEAR REGULATORY COMMISSION g              g WASHINGTON, D. C. 20555
        $              j
        \, ...../                                July 28, 1986 e
Docket No. 99900323/86-01 Conax Buffalo Corporation ATTN: Mr. Robert A. Fox President 2300 Walden Avenue Buffalo, New York 14225-0237 Gentlemen:
This refers to the inspection conducted by Mr. J. J. Petrosino of this office on April 14-18, 1986 of your facility at Buffalo, New York, the continuation of the inspection on April 28-30, 1986 at the Conax Florida Corporation in St.
Petersburg, Florida, and to the discussions of our findings with R. E. Farchmin and members of your staff at the conclusion of the inspection.
The purpose of this inspection was to review the circumstances surrounding the-failure of the Conax explosive primer chamber device to perform its intended I, safety-related function at the Vermont Yankee nuclear station during a periodic test. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an exam-ination of procedures and representative records, interviews with personnel, and observations by the inspector.
During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Inadequate implementation of your QA procedures was apparent in the areas of indoctrination, control of special processes and safety-related activities, and in the lack of a 10 CFR Part 21 reportability evaluation for a deviation in a basic component. The most sig-nificant of these deficiencies was the failure of the Conax Corporation to perform the required 10 CFR Part 21 evaluation for workmanship problems found on six out of twelve explosive primer chamber (EPC) assemblies that were ship-ped to Conax Buffalo from Conax Florida for final shipping to Susquehanne Nuclear Station. The workmanship problem consisted of voids and gaps around the explosive primer devices af ter a special epoxy " potting" process was per-formed. It was also revealed that subsequent undocumented repairs and accep-tance inspections were performed on the six EPC assemblies. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
8607300085 860728 PDR    GA999 EMVCONAX 99900323          PDR
                                                                                              <\
di
 
Conax Buffalo Corporation                        July 28, 1986 I
The enclosed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to sub-mit to this office within 30 days from the date of this letter a written state-ment containing:    1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, e                                .
Robert F. Heishman, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement
 
==Enclosures:==
: 1. Appendix A-Notice of Violation
: 2. Appendix B-Motice of Nonconformance
: 3. Appendix C-Inspection Report No. 99900323/86-01
: 4. Appendix D-Inspection Data Sheets (6 pages) cc w/ enclosures:
Conax Florida Corporation ATTN: Mr. L. B. Bean, President 280175th Street, North St. Petersburg, Florida 33710 The Conax Corporation ATTN: Pr. L. Thomas, Chairman 1700 66th Street, North l  Suite 301 St. Petersburg, Florida 33710 i
 
Conax Buffalo Corporation                        July 28, 1986 4
DISTRIBUTION:
6 :lE:09:;7:
      ~
VPB' Reading *-
DQAVT Reading JMTaylor JStone LParker EMerschoff JPetrosino (3)
RStarostecki, Region I RWalker, Region II CENorelius, Region III EJohnson, Region IV DKirsch, Region V FHawkins, Region III LBattenhausen, Region I GABelisle, Region II BGrimes RHeishman EWeiss, EAB LPlisco, RI l
3
    *See previous page for concurrences.        g i    VPB:00AVT          ASC/VPB:00AVT BC/VP :00AVT JJPetrosino: sam
* EMerschoff*      RFH shman 07/23/86          07/25/86        07    /86 on 1
1 il
___        . . _ -      . _ _              __._ - _ _ - . - _ _ - - _ _ . - _ - .}}

Latest revision as of 21:49, 31 December 2020

Forwards Insp Rept 99900323/86-01 on 860414-18 & 28-30 & Notices of Nonconformance & Violation
ML20203F040
Person / Time
Issue date: 07/28/1986
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Fox R
CONAX CORP. (FORMERLY CONAX BUFFALO CORP.)
Shared Package
ML20203F048 List:
References
REF-QA-99900323 NUDOCS 8607300085
Download: ML20203F040 (3)


Text

e

?

I .

i p KEQg o UNITED STATES I g NUCLEAR REGULATORY COMMISSION g g WASHINGTON, D. C. 20555

$ j

\, ...../ July 28, 1986 e

Docket No. 99900323/86-01 Conax Buffalo Corporation ATTN: Mr. Robert A. Fox President 2300 Walden Avenue Buffalo, New York 14225-0237 Gentlemen:

This refers to the inspection conducted by Mr. J. J. Petrosino of this office on April 14-18, 1986 of your facility at Buffalo, New York, the continuation of the inspection on April 28-30, 1986 at the Conax Florida Corporation in St.

Petersburg, Florida, and to the discussions of our findings with R. E. Farchmin and members of your staff at the conclusion of the inspection.

The purpose of this inspection was to review the circumstances surrounding the-failure of the Conax explosive primer chamber device to perform its intended I, safety-related function at the Vermont Yankee nuclear station during a periodic test. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an exam-ination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Inadequate implementation of your QA procedures was apparent in the areas of indoctrination, control of special processes and safety-related activities, and in the lack of a 10 CFR Part 21 reportability evaluation for a deviation in a basic component. The most sig-nificant of these deficiencies was the failure of the Conax Corporation to perform the required 10 CFR Part 21 evaluation for workmanship problems found on six out of twelve explosive primer chamber (EPC) assemblies that were ship-ped to Conax Buffalo from Conax Florida for final shipping to Susquehanne Nuclear Station. The workmanship problem consisted of voids and gaps around the explosive primer devices af ter a special epoxy " potting" process was per-formed. It was also revealed that subsequent undocumented repairs and accep-tance inspections were performed on the six EPC assemblies. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

8607300085 860728 PDR GA999 EMVCONAX 99900323 PDR

<\

di

Conax Buffalo Corporation July 28, 1986 I

The enclosed Notice of Violation is sent to you pursuant to the provisions of Section 206 of the Energy Reorganization Act of 1974. You are required to sub-mit to this office within 30 days from the date of this letter a written state-ment containing: 1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, e .

Robert F. Heishman, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Violation
2. Appendix B-Motice of Nonconformance
3. Appendix C-Inspection Report No. 99900323/86-01
4. Appendix D-Inspection Data Sheets (6 pages) cc w/ enclosures:

Conax Florida Corporation ATTN: Mr. L. B. Bean, President 280175th Street, North St. Petersburg, Florida 33710 The Conax Corporation ATTN: Pr. L. Thomas, Chairman 1700 66th Street, North l Suite 301 St. Petersburg, Florida 33710 i

Conax Buffalo Corporation July 28, 1986 4

DISTRIBUTION:

6 :lE:09:;7:

~

VPB' Reading *-

DQAVT Reading JMTaylor JStone LParker EMerschoff JPetrosino (3)

RStarostecki, Region I RWalker, Region II CENorelius, Region III EJohnson, Region IV DKirsch, Region V FHawkins, Region III LBattenhausen, Region I GABelisle, Region II BGrimes RHeishman EWeiss, EAB LPlisco, RI l

3

  • See previous page for concurrences. g i VPB:00AVT ASC/VPB:00AVT BC/VP :00AVT JJPetrosino: sam