{{#Wiki_filter:pt *' % ,                                     L'NITEo STATES
{{#Wiki_filter:pt *' % ,
    p          #**,                     NUCt EA] REGULATORY COMMISSION
L'NITEo STATES
    *             "
#**,
                                                        RrGloN lit
NUCt EA] REGULATORY COMMISSION
    *
p
                #E                               801 WARRrNVILLE ROAD
*
          .
"
              j#                               USLE. ILUNolS 60532-4351
RrGloN lit
        .....
#E
                                                  November 21, 1997
801 WARRrNVILLE ROAD
        Mr. John K. Wood
*
        Vice President- Nudear
.
        Davis-Besse Nuclear Power Station
j#
        Centerior Service Company
USLE. ILUNolS 60532-4351
        5501 North State Route 2
.....
        Oak Hart >or, OH 43449
November 21, 1997
  '
Mr. John K. Wood
        SUBJldT:       NRC INSPECTION REPORT No. 50 346/97013(DRP)
Vice President- Nudear
        Dear Mr. Wood:
Davis-Besse Nuclear Power Station
      ' On Novembei 10,1997, the NRC completed an inspection at the 09vis-Besse site. The
Centerior Service Company
        enclosed repon presents the results of that inspection.
5501 North State Route 2
        Good overall performance was noted in all functional areas. Tht excellent material condition of
Oak Hart >or, OH 43449
        the plant minimized the challenges and burdens to operators. Additionally, plant performance
'
        during an emergency diesel generator outage was very good.
SUBJldT:
        No violations of NRC requirements were identified during this inspection period.
NRC INSPECTION REPORT No. 50 346/97013(DRP)
        In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
Dear Mr. Wood:
        enclosures will be placed in the NRC Public Document Room.
' On Novembei 10,1997, the NRC completed an inspection at the 09vis-Besse site. The
                                                        Sincerely,
enclosed repon presents the results of that inspection.
                                                              4e-<    .Ak h.       %
Good overall performance was noted in all functional areas. Tht excellent material condition of
                                                        Geoffrey ik. Gra     irect
the plant minimized the challenges and burdens to operators. Additionally, plant performance
                                                        Division of Reactor Projects
during an emergency diesel generator outage was very good.
        Docket No.:     50-346
No violations of NRC requirements were identified during this inspection period.
        License No.: NPF-3
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
        Enclosure:     Inspection Report
enclosures will be placed in the NRC Public Document Room.
                                                                                                        f
Sincerely,
                          No. 50-346/97013(DRP)
.Ak h. %
        cc w/ encl:     J. P. Stetz, Senior Vice President Nuclear
4e-<
                        J. H. Lash, Plant Manager
Geoffrey ik. Gra
                        J. L. Freets, Manager Regulatory Affairs
irect
                        State Liaison Officer, State of Ohio
Division of Reactor Projects
                        Robert E. Owen, Ohio Department of Health
Docket No.:
                        C. A. Glazer, State of Ohio, Public Utilities Commission
50-346
                      91OOhb
License No.: NPF-3
                        t 971121
Enclosure:
        Pg
Inspection Report
        v7uotogKA      05000346                                        l}$I%I%I1f!I
f
        e                       PDR
No. 50-346/97013(DRP)
cc w/ encl:
J. P. Stetz, Senior Vice President Nuclear
J. H. Lash, Plant Manager
J. L. Freets, Manager Regulatory Affairs
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
C. A. Glazer, State of Ohio, Public Utilities Commission
91OOhb
l}$I%I%I1f!I
t 971121
v7uotogK 05000346
Pg
A
e
PDR
b
b


        . _ . . _ . . _                 _ _       _ _.           . _     _ . _ _ _ _ . _ . _ .                   _ _ . _ . . _ . . _ _ _ . _             . . . _ _ __
. _ . . _ . . _
                                                                                                                                                                                .
_ _
                                                                                                  November 21, 1997                                                             !
_ _.
                                    Mr. John K. Wood                                                                                                                             ;
. _
  ,
_ . _ _ _ _ . _ . _ .
                                    Vlos Proeiderd- Nucteer                                                                                                                     ;
_ _ . _ . . _ . . _ _ _ . _
*
. . . _ _ __
                                    Davie Besse Nuclear Power Station
.
                                    CorWorlor Servios Company                                                                                                                   :
November 21, 1997
                                    5501 North State Route 2                                                                                                                   1
!
                                    Oak Harbor, OH 43449                                                                                                                         ,
Mr. John K. Wood
                                    SU5, LECT:       NRC INSPECTION REPORT NO. 50 346/97013(DRP)
;
                                                                                                                                                                                *
,
                                    Dear Mr. Wood:                                                                                                                             I
Vlos Proeiderd- Nucteer
                                    On November 10,1997, the NRC completed an inspection at the Davis Besse site. The                                                           i;
;
                                    enclosed report presents the results of that inspection.
Davie Besse Nuclear Power Station
                                    Good overall performance was noted in all functional areas. The excellent material condition of
*
,                                  the plant minimized the challenges and burdens to operators. Additionally, plant pefformance                                               i
CorWorlor Servios Company
                                    during an emergency diesel generator outage was very good.
:
                                    No violations of NRC requirements were identifled during this inspection period.                                                             ,
5501 North State Route 2
                                  - in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
1
                                    enclosures will be placed in the NRC Public Document Room.                                                                                 .
Oak Harbor, OH 43449
                                                                                                  Sincerely,
,
                                                                                                /s/ Geoffrey E. Grant                                                           !
SU5, LECT:
                                                                                                                                                                                  '
NRC INSPECTION REPORT NO. 50 346/97013(DRP)
                                                                                                - Geoffrey E. Grant, Director
*
                                                                                                  Division of Reactor Projects
Dear Mr. Wood:
                                    Docket No.:     50-346
I
                                    License No.: NPF-3
On November 10,1997, the NRC completed an inspection at the Davis Besse site. The
                                                                                                                                                                                  '
i
                                    Enclosure:     Inspection Report
;
                                                        No. 50-346/97013(DRP)
enclosed report presents the results of that inspection.
                                                                                                                                                                  ^
Good overall performance was noted in all functional areas. The excellent material condition of
                                    cc w/ encl:     J. P. Stetz, Senior Vice President Nuclear
the plant minimized the challenges and burdens to operators. Additionally, plant pefformance
                                                    J. H. Lash, Plant Manager                                                                                                   i
i
                                                    J. L Freels, Manager Regulatory Affairs                                                                                     i
,
                                                    State Liaison Officer, State of Ohio
during an emergency diesel generator outage was very good.
                                                    Robert E. Owen, Ohio Department of Health                                                                                   '
No violations of NRC requirements were identifled during this inspection period.
                                                                                                                                                                                >
,
                                                    C, A. Glazer, State of Ohio, Public Utilities Commission
- in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
                                    Docket File w/enci                                           DRP w/ encl
enclosures will be placed in the NRC Public Document Room.
                                    PUBLIC IE-O '. w/end                                         SRI Cnis-Besse w/enci                                                         ,
.
                                    OCFO/LFARB w/onci                                             A. B. Beach w/onci                                                           -
Sincerely,
                                    Project Manager, NRR w/enci                                   Deputy RA w/ encl
/s/ Geoffrey E. Grant
                                    Rill Enf. Coordinator w/ encl                                 Rlli PRR w/enci
!
                                    CAA1 w/enci(E-mail)                                           DRS (2) w/enci
'
                                    TSS w/enci                                                   DOCDESK (E-mail)
- Geoffrey E. Grant, Director
                                    DOCUMENT NAME: G:DAVI\DAV97013.DRP                                                                                                         '
Division of Reactor Projects
                                                                                                                                                                                *
Docket No.:
                                    To reoelve a copy of this document, indicate in the box "C" = Copy without attachtenci "E"
50-346
.                                  = Copy with attach /enci "N" = No copy -
License No.: NPF-3
                                      OFFICE     Rill           _     N
'
                                      NAME      Kozak/et        k/        Grant @C/
Enclosure:
                                      DATE       11/N/97                   11M/90                         11/ /97                             11/ /97
Inspection Report
                                                                              OFFICIAL RECORD COPY.
No. 50-346/97013(DRP)
                                                                                                                                                                                <
^
    -* -               ,,,y,'-ww-                       +,,.w,       v-                                       -       -
cc w/ encl:
                                                                                                                                              ,-ww-,-   -             wee-w.-
J. P. Stetz, Senior Vice President Nuclear
J. H. Lash, Plant Manager
i
J. L Freels, Manager Regulatory Affairs
i
State Liaison Officer, State of Ohio
Robert E. Owen, Ohio Department of Health
>'
C, A. Glazer, State of Ohio, Public Utilities Commission
Docket File w/enci
DRP w/ encl
PUBLIC IE-O '. w/end
SRI Cnis-Besse w/enci
,
OCFO/LFARB w/onci
A. B. Beach w/onci
-
Project Manager, NRR w/enci
Deputy RA w/ encl
Rill Enf. Coordinator w/ encl
Rlli PRR w/enci
CAA1 w/enci(E-mail)
DRS (2) w/enci
TSS w/enci
DOCDESK (E-mail)
DOCUMENT NAME: G:DAVI\\DAV97013.DRP
*
'
To reoelve a copy of this document, indicate in the box "C" = Copy without attachtenci "E"
= Copy with attach /enci "N" = No copy -
.
OFFICE
Rill
_
Nk/
Grant @C/
NAME
Kozak/et
DATE
11/N/97
11M/90
11/ /97
11/ /97
OFFICIAL RECORD COPY.
<
-* -
,,,y,'-ww-
,,,-..r---
+,,.w,
w
v-
-.,,.%,--.w,,,w,w,.,,,-y,
. wry
, - , , ,
,,-,--iews,..w,ew<.,
,-ww-,-
, , ,
w-
-
.,<m..%-w:--
y, w ir
wee-w.-
- . , .
-
-
}}
}}

Latest revision as of 04:16, 8 December 2024

Forwards Insp Rept 50-346/97-13 on 970929-1110.No Violations Noted.Excellent Matl Condition of Plant Minimized Challenges & Burdens to Operators & Plant Performance During EDG Outage Was Good
ML20199K159
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/21/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
Shared Package
ML20199K162 List:
References
50-346-97-13, NUDOCS 9712010031
Download: ML20199K159 (2)


See also: IR 05000346/1997013

Text

pt *' % ,

L'NITEo STATES

      • ,

NUCt EA] REGULATORY COMMISSION

p

"

RrGloN lit

  1. E

801 WARRrNVILLE ROAD

.

j#

USLE. ILUNolS 60532-4351

.....

November 21, 1997

Mr. John K. Wood

Vice President- Nudear

Davis-Besse Nuclear Power Station

Centerior Service Company

5501 North State Route 2

Oak Hart >or, OH 43449

'

SUBJldT:

NRC INSPECTION REPORT No. 50 346/97013(DRP)

Dear Mr. Wood:

' On Novembei 10,1997, the NRC completed an inspection at the 09vis-Besse site. The

enclosed repon presents the results of that inspection.

Good overall performance was noted in all functional areas. Tht excellent material condition of

the plant minimized the challenges and burdens to operators. Additionally, plant performance

during an emergency diesel generator outage was very good.

No violations of NRC requirements were identified during this inspection period.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

Sincerely,

.Ak h. %

4e-<

Geoffrey ik. Gra

irect

Division of Reactor Projects

Docket No.:

50-346

License No.: NPF-3

Enclosure:

Inspection Report

f

No. 50-346/97013(DRP)

cc w/ encl:

J. P. Stetz, Senior Vice President Nuclear

J. H. Lash, Plant Manager

J. L. Freets, Manager Regulatory Affairs

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

C. A. Glazer, State of Ohio, Public Utilities Commission

91OOhb

l}$I%I%I1f!I

t 971121

v7uotogK 05000346

Pg

A

e

PDR

b

. _ . . _ . . _

_ _

_ _.

. _

_ . _ _ _ _ . _ . _ .

_ _ . _ . . _ . . _ _ _ . _

. . . _ _ __

.

November 21, 1997

!

Mr. John K. Wood

,

Vlos Proeiderd- Nucteer

Davie Besse Nuclear Power Station

CorWorlor Servios Company

5501 North State Route 2

1

Oak Harbor, OH 43449

,

SU5, LECT:

NRC INSPECTION REPORT NO. 50 346/97013(DRP)

Dear Mr. Wood:

I

On November 10,1997, the NRC completed an inspection at the Davis Besse site. The

i

enclosed report presents the results of that inspection.

Good overall performance was noted in all functional areas. The excellent material condition of

the plant minimized the challenges and burdens to operators. Additionally, plant pefformance

i

,

during an emergency diesel generator outage was very good.

No violations of NRC requirements were identifled during this inspection period.

,

- in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosures will be placed in the NRC Public Document Room.

.

Sincerely,

/s/ Geoffrey E. Grant

!

'

- Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.:

50-346

License No.: NPF-3

'

Enclosure:

Inspection Report

No. 50-346/97013(DRP)

^

cc w/ encl:

J. P. Stetz, Senior Vice President Nuclear

J. H. Lash, Plant Manager

i

J. L Freels, Manager Regulatory Affairs

i

State Liaison Officer, State of Ohio

Robert E. Owen, Ohio Department of Health

>'

C, A. Glazer, State of Ohio, Public Utilities Commission

Docket File w/enci

DRP w/ encl

PUBLIC IE-O '. w/end

SRI Cnis-Besse w/enci

,

OCFO/LFARB w/onci

A. B. Beach w/onci

-

Project Manager, NRR w/enci

Deputy RA w/ encl

Rill Enf. Coordinator w/ encl

Rlli PRR w/enci

CAA1 w/enci(E-mail)

DRS (2) w/enci

TSS w/enci

DOCDESK (E-mail)

DOCUMENT NAME: G:DAVI\\DAV97013.DRP

'

To reoelve a copy of this document, indicate in the box "C" = Copy without attachtenci "E"

= Copy with attach /enci "N" = No copy -

.

OFFICE

Rill

_

Nk/

Grant @C/

NAME

Kozak/et

DATE

11/N/97

11M/90

11/ /97

11/ /97

OFFICIAL RECORD COPY.

<

-* -

,,,y,'-ww-

,,,-..r---

+,,.w,

w

v-

-.,,.%,--.w,,,w,w,.,,,-y,

. wry

, - , , ,

,,-,--iews,..w,ew<.,

,-ww-,-

, , ,

w-

-

.,<m..%-w:--

y, w ir

wee-w.-

- . , .

-

-